Professional Documents
Culture Documents
P
Strategic Network Monitoring Points
Engineering
October 16, 2003
Title 1
Title 2
Agenda
What is the SNMP Program?
Network Health/Monitoring
Objective and Background
The Concept
The Structure
The Process
Actions
Expectations
Q&A
Title 3
Ideal Conditions:
Title 4
Objective:
To identify, formulate and operationally monitor strategic
network elements in order to maintain platform network
health.
Background:
BSME now has to manage 5 different platforms. With limited
resources it has become apparent that BSME has to narrow
down its monitoring landscape to only critical network
elements. By identifying a short list, developing both tools and
processes and assigning the NCC to monitor and audit on a
set periodic basis, will provide minimal network health
monitoring.
Title 5
The Concept
Realistic Goals
Identifying critical networks
Identifying critical network components
Developing tools for auditing
Assigning period of repetition
Assigning collectors
Assigning remedial actions
Producing management reports
Title 6
The Structure
Platform
Product
Bandwidth Backbone
TDM
Vendor
Carriers
ICCS/GPNS (Martis)
Title 7
OI
(Ciena)
Bandwidth
Link Failure Analysis
Optical
ATM
PNNI Audit
Monthly
Frame Relay
Passman Trunk Audit
Monthly
GPS Monitoring
Weekly
Overlay Diversity
Quarterly
X.25
Martis TDM
Node Real Time Clock
Monthly
Monthly
Weekly
Accounting/Statistics
Verification
Weekly
Monthly
Quarterly
Audit PP/IP/DIA
SPVCs for valid DTL
Tags.
Weekly
Daily
Title 8
Logical Trunks
ACR/PCR
Weekly
Monthly
Weekly
Daily
The Process
Description
Tool List
Requirements
Collection
Analysis
Interpretation of results
Remedial Action Procedure
Assigning next cycle
Title 9
Remedial Actions
Bandwidth
Link Failure Analysis
Analyze impact
Send out notification
Cycle as needed
ATM
PNNI
Analyze audit report
Correct either network or dB.
Cycle Monthly
Title 10
Remedial Actions
ATM
GPS Monitoring
Analyze audit report
Correct either network or dB.
Cycle Weekly
ATM
DS3/E3 Buffer Audit
Analyze audit report
Correct either network or dB.
Cycle Quarterly
Title 11
Remedial Actions
ATM
IMA AIS/RDI Disable
Analyze audit report
Correct either network or dB.
Quarterly
ATM
DTL Tag Audit
Analyze audit report
Correct either network or dB.
Cycle Weekly
Title 12
Remedial Actions
ATM
Monitoring 4 X STM1 Trunk CAC Capacity
Analyze exception report
Correct network problem or notify Capacity Planning
Daily
FR
Passman Trunk Audit
Analyze audit report
Correct either network or dB.
Cycle Monthly
Title 13
Remedial Actions
FR
Overlay Diversity
Update SPOF Matrix
Schedule network impairment correction
Monthly
FR
Accounting and Statistics Verification Audit
Analyze audit report
Correct either network or dB.
Cycle Monthly
Title 14
Remedial Actions
FR
Logical trunks ACR/PCR Settings
Analyze audit report
Correct either network or dB.
Cycle Monthly
Title 15
Cycle
As Needed
Link Failure
Analysis
Daily
4 x STM1
trunks for
Discards
Weekly
Monthly
GPS
Monitoring
PNNI Audit
DS3/E3 trunks
Buffer 1568
IMA AIS/RDI
disable
Passport Overlay
Diversity
Passport Accounting
and Statistics
parameter
assurance
Logical Trunks
ACR/PCR
Title 16
Quarterly
Expectations
Monitoring Points
Monitoring these specific points should stabilize the
monitored platforms and services
Title 17
Q&A
Title 18