PERHITUNGAN SASAAN PRODUKSI

Total Production Target OB (1)

A) Mining Activity

1. Stripping & Dozing OB


2. Ore Mining (Iron Ore)

Land Clearing

(2)

Ripping/Dozing Top Soil

(3)

Ripping/Dozing OB

(4)

Drilling & Blasting OB

(5)

Loading OB

(6)

Hauling OB

(7)

Spreading OB Waste Dump (8)


Blasting OB

Total Production Target Ore


Blasting Ore
Loading Mined Ore
Hauling Mined Ore

KOMPONEN
KEGIATAN

B) Processing Plant Activity

1. Stockpiling ROM & Crusher


2. Metalurgy
3. Ore Product Handling
4. Tailing Handling

1-3
3+4+5
=6
=5
(1)
(2)
(3)
(4)

=1

= 1 x 95%
= 3 x 95%

Stockpiling & Loading Raw Ore (1)


Ore Feed Crusher
(2)
Ore Product (Crushing) 80,3%
(3)
Tailing 19,7%
(2)
Catalyst Smelt (Coke +& lime) 39%

(1)

Loading Ore Crushing Product + Catalyst (2)

C) Jetty & Barge Activity

1. Pemuatan ke Tongkang

/ 4,2

Smelting Process

(3)

Iron Pellet

(4)

Loading Ore Final Product

(1)

Hauling Ore Final Product

(2)

Loading Tailing

(1)

Hauling Tailing
Spreading & Dozing Tailing

(2)
(3)

Stockpiling & Loading Ore to Truck

(1)

Hauling Ore Truck to Barge

(2)

Spreading Ore in Barge**

(3)