Sunita Menon was assigned the task of preparing the
operation plan for the next eight weeks for the product P0110. The basic problem Menon Faced was deciding how to produce economically. After collecting the data (Bill of Materials, Product Structure Diagram, Master Schedule, On Hand Inventory, Costs Associated), Menon reached a different answer for every lot-sizing technique that she applied.