Professional Documents
Culture Documents
U_RRIPALAWA
3G Strategy Team
2nd U900 Layer Activation Trial
Operation
Result
Traffic absorbed balance between F1 and F2.
CDR Maintain (<5%)
Traffic and Throughput Increased
CSSR Maintain. (>95)
SHO Maintain (>93)
NPO PROJECT 2
U_RRIPALAWA User Number
NPO PROJECT 3
U_RRIPALAWA Traffic
NPO PROJECT 4
U_RRIPALAWA Power
NPO PROJECT 5
U_RRIPALAWA CSSR
NPO PROJECT 6
U_RRIPALAWA CDR
NPO PROJECT 7
U_RRIPALAWA Throughput
NPO PROJECT 8
U_RRIPALAWA SHO & IFHO
NPO PROJECT
CELL
LEVEL KPI
U_RRIPALAWA MeanTCP
NPO PROJECT 11
U_RRIPALAWA MeanTCPNonHS
NPO PROJECT 12
U_RRIPALAWA Power Utilization
NPO PROJECT 13
U_RRIPALAWA Power Util nonHS
NPO PROJECT 14
U_RRIPALAWA User Number
NPO PROJECT 15
U_RRIPALAWA User Number
NPO PROJECT 16
U_RRIPALAWA Payload
NPO PROJECT 17
U_RRIPALAWA Payload
NPO PROJECT 18
U_RRIPALAWA HSDPA User Throughput
NPO PROJECT
U_RRIPALAWA HSUPA User Throughput
NPO PROJECT
U_RRIPALAWA HSDPA Cell Throughput
NPO PROJECT
U_RRIPALAWA HSUPA Cell Throughput
NPO PROJECT
U_RRIPALAWA RTWP
NPO PROJECT
THANK YOU