November 2012.
Submitted By Facility Management Team
CeNSE-
Ultra pure
water system Facility RO Plant
Manageme
nt
3
2.PROPOSED MANPOWER
DISTRIBUTION
4
DESIG P Jul-
3.Availability of Manpower
Aug Sep Oc No De Jan Fe Ma Ap Ma Jun Jul- Au Se Oc No
NATIO l 11 -11 -11 t- v- c- -12 b- r- r- y- -12 12 g- p- t- v-
N a 11 11 11 12 12 12 12 12 12 12 12
n
e
d
Facility 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Manag
er
Techno 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
logist
Electri 4 0 2 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4
cian
Chiller 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
operat
ors
BMS 3 0 1 1 1 1 1 1 1 1 1 1 1 1 3 2 2 2
operat
or
Plumb 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1
ers
Asst.Te 2 0 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2 2
chnicia
n
Total 1 4 10 11 11 13 12 13 13 13 13 13 13 13 15 14 14 14
5
5
4.Major Incidents Summary
6
5.Initiatives taken
DG B check completed.
CeNSE electrical system transmission done.
CeNSE PA system repaired.
Characterization PAC issue closed.
2Nd floor LDB tripping issue solved.
Leak detector system installed.
DG-4 surrounding area cleaned, bushes cut.
PPM general exhaust, Wet exhaust, DG, UPS,
ETP, RO, DI plants, FPS, Chiller, AHU, Pumps,
PCW, Compressor, H Vacuum done.
7
6.Initiatives Planned for next month
PCW water refilling with RO.
CCTV old camera installation.
VFD repair- PCW & Wet scrubber.
New bore well water tap connection for chiller cleaning.
Partition of utility 1st floor area.
A/C works at UPS area 1st floor utility.
AHU all- filters changing.
DG-4 B check.
DG-4 Exhaust extension works.
PCW low level & emergency exit door alarm installation.
8
7.POWER FAILURE ANALYSIS
S Date From To Total
L
1 3-11-12 15:30,18: 15:40,18:30 20 Mins
20
2 4-11-12 15:40 15:50 10 Mins
3 15-11- 16:20 16:40 20 Mins
12
16-11- 11:05 11:20 15 Mins
4 12
5 30-11- 11:15,13: 11:25,13:20 20 Mins
12 10
TOTAL HRS 1: 25 Hrs
9
MONTHLY HSD
CONSUMPTION
10
9.DG Generated Power KWH
11
10. EB Power
Consumption
12
11.AVERAGE POWER CONSUMPTION
EB+DG
13
12.LIQUID NITROGEN
CONSUMPTION
14
13.Suggestions and
Requirements
Microsoft Office
Excel Worksheet
16
15.Help desk, Complaints
register
Microsoft Office
Excel Worksheet
17
Thanks
by,
18 Facility Management Team