Professional Documents
Culture Documents
– "Yes" or "No" drop down menu for ‘Do the subcomponent (lower level) Part
Reports (DBIs) require Q00392? If so, are the lower level Part Report
requirements included in this ITP? ‘
– Note: The ITP may contain subcomponent Part Report (DBI) requirements
in one single ITP, only if the subcomponent Part Reports (DBIs) require
Q00392
– Note: If Q00394 (for Product MPQP) is on the Part Report for Raw Material,
subcontractor of the Raw Material shall provide an MPQP acc to Q00394 to
the Supplier that will ensure FMC approval.
August 22, 2013 Inspection & Test Plan (ITP) 7
FMC required ITP template – Q00392
• Cycle Times
• FMC to review and return document to Supplier within
twenty (20) Business Days.
• Supplier shall re-submit updated document within five (5)
Business Days.
• For every review cycle (revision) the supplier will receive a
DR-4 document (Document Review) from FMC.
• The DR-4 document will have an Approval Status Code and
may have comments for action or information.
• M = Monitor:
A step in manufacturing and testing that proceeds as
scheduled, and may be subject to FMC and/or Company
observation at FMC and/or Company discretion. Advance
notification is not required. Monitor activities are intended for
process verification, not product inspection.
Evaluate notification
Notification period, information and documentation, check
FMC Client
availability
Both FMC Client & FMC (Quality) Reject or give attendance info / waiver
• Recurring problems:
– Documentation is a bottle neck
• Internally in FMC
• FMC Customer
• Contact FMC purchaser if delay in documents
– Typing errors
• wrong / misspelled Purchase Order Number or Part Number
• several cases of ”copy-paste”
• FMC is working on methods to inform about required intervention
points at PO award.
– For BP projects requirements for intervention will be included in the
Part Report (DBI). Include those on first revision of ITP /MPQP
• Notifications
– Any special agreements with FMC or FMC’s Client (shorter
notification time, document approvals etc) shall be clearly stated in
the notification.