Professional Documents
Culture Documents
THE WARM AIR FROM THE CONDITIIONED SPACE RAISES AND PASSES THROUGH
THE COOLING COIL HOUSED IN THE CHILLED BEAM THROUGH CONVECTIION AND
COOL AIR DISCHARGED OUT FROM SIDES OF THE CHILLED BEAMS
THE CONDITION OUTSIDE AIR (PRIMARY AIR) IS FED THROUGH SHEET METAL
DUCTING AND TERMINATED TO EACH ACB TO REMOVE BOTH SENSIBLE AND
LATENT COOLING REQUIREMENTS OF THE CONDITIONED SPACE
PASSIVE CHILLED BEAM (PCB)