(b) Prevention of gas coning or water coning problems; (c) More pay-zone exposure; (d) Increasing the efficiency of enhanced oil recovery (EOR) techniques; (e) Improving productivity in fractured reservoirs by intersecting a number of vertical fractures.
APPLICATION OF MULTILATERAL WELLS:
(a) Drilling footage to primary target area is drilled only once;
(b) More pay-zone exposure; (c) Reduction of platform costs; (d) Better utility of existing platform slots and existing wells; (e) Environmental concerns lessened. APPLICATION OF EXTENDED REACH WELLS: (a) Permits satellite field developments from existing platforms; (b) Increased production by staying in the pay-zone laterally; (c) Environmental concerns lessened. (d)Allows access to reserves in environmentally sensitive areas from small footprint locations; (e)Reduction in the number of platforms, surface locations and subsea completions and total wells required to exploit fully a hydrocarbon reservoir.
APPLICATION OF SLIM WELLS: (Slim Wells< 6 inch in diameter)
(a)Exploration and production in mature/immature areas;