Professional Documents
Culture Documents
DEPARTMENT OF
MECHANICAL ENGINEERING
Internship presentation on
OVERHAULING
OF
DIESEL ENGINES
NAME : INTERNSHIP GUIDE :
MALLIKARJUN Thanuj Kumar M
1RR15ME054 Associate professor
Department of Mechanical
Engineering
1
CONTENTS
Introduction of NANDI TOYOTA
Classification of cars
Toyota Way
5S Concept
Service
Overhauling of engines
Conclusion
2
3
NANDI TOYOTA
4
TOYOTA WAY
5
5S CONCEPT
1.Sort (Seiri) :
Make work easier by eliminating obstacles.
6
Classification of Cars:
Based on space:
1.Single box type:
In this kind of vehicles the Engine,
passenger seats and Cargo space in
Single compartment.
in separate compartments
Based on style
1. HATCHBACK 3.STATION WAGON
8
5.SUV
SERVICE:
Servicing is the most important aspect
of the car maintenance. There are two
types of customer service as follows:-
1.Appointment customer
2.Walk-in customer
9
In this department we viewed the various steps
taken by the technician to repair or replace the
damaged parts to make it look brand new.
10
Procedural steps followed :
11
INTERNSHIP PHOTOS
12
ENGINE SPECIFICATION
TOYOTA INNOVA 2.5 EV
ENGINE- 2494CC(2.5Lts, 2500cc)
POWER – 100.57BHP @360RPM
TORQENGINE SPECIFICATION
UE-200N-M @1400-3400RPM
13
OVERHAUING OF DIESEL ENGINE
Preparation for engine overhauling
o Arrange all the required tools and equipment’s required for overhauling
o Assemble different size trays for placing various dismantled parts.
o Use cotton cloth for cleaning and use permanent marker for marking various
things.
Dismantling the engine
o Removed the battery .
o Drain all the engine oil and coolants.
o Removed all electrical connections,sensors and wires from all the various
components
o Removed the exhaust manifold and all high pressure pipe line.
o Place them in a tray and mark the tray if required.
o Name and nuts and place them in a tray
o Removed vacuum line and common rail unit.
o Removed the camshaft timing gear..
o Removed the cylinder head mounting bolt in sequence and gasket and nipple.
o Removed the piston and connecting rod assembly also.
14
15
ASSEMBLING THE ENGINE
16
Using the socket wrench T bar rotated the bolt further for 90˚.
Repeat the same steps for all the piston and connecting rod.
Applied silicon sealing compound to the oil sump and kept it to rest for 2 min.
17
Assembling the engine as per the provided
manual under the guidance of Mr. Rao sir
18
After assemble of engine and
assembled engine gets started
19
Issuing Certificate
20
CONCLUSION
During my industrial training, there are many changes from
the point of learning environments and discussion among
colleagues. It can directly increase the dedication and
rational attitude toward us.However, there are still some
weaknesses that can be improved in the future.
I can conclude that by training in this industry I received a
lot of exposure in the automobile world.
I would like to thank also the Rajarajeswari College of
Engineering giving students find their own experience with
having Industrial Training like this.
21
THANK YOU
22