You are on page 1of 4

Barcelona 12-15 May 2003

Grid Metering Processes


Commercial process
Billing
System
Grid
Meter

Network
Management
System
Operational process
WIDMER CH Session 3 – Block 2 (40. SIE_Schaub_A1) 1 /4
Barcelona 12-15 May 2003

Grid Metering Measurement


• Measurement quality exceeds Class 0.2S
requirements.
• Measurement system 5 times faster as for
industrial meters.
• Intergrated billing power quality
for voltage dips and interruptions.
• Easy adaption for primary values.
• Scalable meter functionality.
WIDMER CH Session 3 – Block 2 (40. SIE_Schaub_A1) 2 /4
Barcelona 12-15 May 2003

Grid Metering Communication


• Modular communication
separated from measurement.
• Standard protocol DLMS (IEC 62056-53).
• Open for other standard protocols for
network management.
• Data traceability

DLMS = Device Language Message Specification


WIDMER CH Session 3 – Block 2 (40. SIE_Schaub_A1) 3 /4
Barcelona 12-15 May 2003

Grid Metering Standards


Commercial process TC13 Secure
data
Billing
System
IEC 870-5-102
Grid Concen- proprietary
Meter trator protocols
e.g. SCTM Network
Management
System
Operational process TC57
TC13

WIDMER CH Session 3 – Block 2 (40. SIE_Schaub_A1) 4 /4

You might also like