Presentation for
GC Works by
Lakshya Group
Technical capability
presentation for
Electrical work by
LEPL
Lakshya’s
philosophy....
+ Quality Services
+Zero defect
+On time delivery
OFFICES
Bangalore
Tamilnadu
Hyderabad
Mumbai
IT-BT
Prime focus
Technologies
CLIENTS
REVENUE IN INR
2012-2013
SIMILAR WORKS
2013-2014
2014-2015
2015-2016
2016-2017
2017-2018
EHS MANAGEMENT PLAN
Standard Safety Practice
at Each Project.
Mandatory procedure
followed for EHS
Mandatory PPE as per
standard
Dress code as per
standard
Meet all statutory
compliances
Meet specific trainee
for hot work height
work mock drill when
required
Compulsory safety
induction will be
implemented
Premedical health
checkup for all
workers
Hospital tie up
Providing first aid
material and kit as per
standard
LEPL safety team’s Objectives
Providing Safety Induction to all staff and workmen on their arrival at site.
Daily site safety inspection, observation of unsafe act and unsafe condition.
Taking action to rectify the severe hazard on spot.
Conducting Tool Box Talk /HSE training at site.
Report any incident, accident or near miss immediately as per the company
procedure.
Advise on site safety & promote the safe conduct of all works.
Implementation of the project HSE Plan as well as keeping record for the safety files to
enable auditing to be carried out.
Promote a positive safety attitude to subcontractors.
To inspect fire-fighting equipment's and ensure that they are in working conditions.
Tagging of all Tools and tackles
Ensure that all electrical cables are free from joints will be connected using male
and female connectors
Ensure that only Double insulated cable to be used for all power connections for both
Raw and Lighting
LEPL safety team’s Objectives
Material Method
machinery men
1M. Material
2M: Method
3M :Machinery
4M: Men
4M quality plan [SQC]
Select the right Material
Understand and use the right Method
Use the right Machinery ie,: Tools
Ensure that the Men who is executing the work is knowledgeable about the requirement
MATERIAL:
METHOD:
MACHINERY:
• Without proper Machinery we will not be able achieve the desire results
• Selection is a important Criteria
• Also it should meet the EHS requirements
MEN:
• The most important part of achieving the desired results
• One should be aware of the Required END Result
• Should be aware and Follow all set procedures
• The Mantra should be QUALITY QUALITY and QUALITY ONLY
•
Quality Management Plan:
QUALITY:
• Selection-Select the materials and man power who achieve the set
quality goals
• Avoid reworks
The following process will be followed for checking the material quality and
installation at site:-
Pre-Installation meeting:
A pre-installation meeting will be conducted between Consultants, PMC ,
before the installation to identify any challenges faced . A sign off has to be
taken from client before proceeding with the same.
PROJECT EXECUTION PLAN
PROPOSED PROJECT
Project Title- FOOP-BCPCGOVO-CARINA
S c o p e : SUPPLY INSTALLATION TESTING AND
COMMISSIONING OF ELECTRICAL WORKS
Location:Bagmane Constellation Business Park,
Mahadevapura Bangalore
SCOPE OF WORK
ELECTRICAL FITOUT
LEPL PROJECT EXECUTION PLAN
8 Project Handover
LEPL PROJECT EXECUTION PLAN
1 Project Kick-Off
2 Mobilization/Documentation
3 Sample Mock-Up
4 Procurement
5 Material Delivery
ELECTRICAL
EQUIPMENT
RACEWAY/PIPE
CUTTING
CEILING DRILLING
FLOOR CHIPPING
CONVENTIONAL CHIPPING
CHIPPING WITH DRS
Tool Purpose Lakshya Practice
ELECTRICAL TESTING
EQUIPMENTS
Check Voltage
MULTI METER
ELECTRICAL TESTING
EQUIPMENTS
M.G.SATISH
TECHNICAL DIRECTOR
PROJECT ENGINEER
Komala Rizwan
SELVAKUMAR.K.G
Legal Asst tech support
Sabitha
Billing
Pool of Asst. Project Manager’s/ Site Supervisors/ Vendor Supervisors
/ Skilled Labours, etc.
CASE STUDY- 1
PROJECT: SanDisk India Device Design Centre
Location: Bangalore
Size: 2.05 laks sft
Ground + 9 floors
Duration: 6 months
Achievement
Completed on time
Saving to the tune of +80 laks in taxes
Saving to the tune of +50 laks by value addition
VALUE ADDITIONS:
All stand by secondary source was changed to aluminium cable from Copper
cable….saved +15 laks
Rerouted the Bus bar raising main for UPS by introducing core cutting in the
ceiling and avoided Bus bar feeder piller, connected raising main directly to the
panel….. Saved +30 laks
Reconditioned and used all existing builder earthing…. Saved + 5 laks
Suggested and implemented tax saving by accepting PO on our chennai branch
office, closed all invoices against C form@ 2% on CST in place of @14.5% vat
saved ……+80 laks
CASE STUDY- 2
Achievement
Completed on time
REMEDY: suggested and used prefabricated movable ladder with platform and
achieved the required results
Challenges in obtaining CEIG approval:
WRONG: Two separate towers with two separate survey numbers was used present
in 10th floor, as per govt rules power source from two different survey numbers cannot
be interlinked
REMEDY: coordinated with PMC and consultant and redesigned the distribution of
loads and got the CEIG approval
SIMILAR WORKS
Qualcomm
BagmaneCarina
Bangalore
201000Sft
2016-17 completed
SIMILAR WORKS
VISA
Bagmane WTC
Bangalore
21500Sft
2016-17
completed
SIMILAR WORKS
SanDisk
Prestige Tech park
Bengaluru
2.05000 Sft
2014-15 completed
SIMILAR WORKS
INMOBI
EmbassyTechpark
Bangalore
201000Sft
2014-16 completed
Ongoing
projects
THANK YOU
And we
look forward!