Kegiatan Produksi Group B

25 Feb-06 Maret 2019


25 Februari 2019 ( Perawatan) Shift 1 After
1. Cleaning area Mill Drive
2. Cleaning area Refrigeration system
3. Cleaning of the clutch Mill area
Before
Kegiatan Produksi Group B After

25 Feb-06 Maret 2019


26 Februari 2019 ( Perawatan) Shift 1
1. Cleaning at Evaporator coil AC C7
2. Cleaning at Cover & Filter Evaporator AC C7
3. Cleaning All filter Fan Packer & Mill & Wheel
Loader

Before
27 Februari 2019 ( Perawatan) Shift 2
1. Cleaning area 416 BC 2
2. Cleaning at Primary & Secondary cleaner BC 2
3. Cleaning Coating cement at all roller, BC cover
& cleaning under BC 2
28 Februari 2019 ( Perawatan) Shift 2
1. Cleaning at Bin Bulk area (61B-AS 1,61B-
3B1 & 61B-LA1
2. Preventive By repainting All equipment at
Bin Bulk area for corrosion Protection

Before After
• 01 March 2019 ( Perawatan) Shift 3
1. Cleaning up & Spills materials
under Bearing Mill
2. Cleaning coating material around
Mill area
After
Before
Kegiatan Produksi Group B 25 Feb-06 Maret 2019
After
02 March 2019 ( Perawatan) Shift 3
1. Cleans & wash the ball Mill
2. Cleaning at covers Ball Mill
Before On Progress
Kegiatan Produksi Group B (25 Feb-06 Maret 2019)

03 March 2019 ( Perawatan) Shift 3


1. Cleaning at Top Silo 1 & 2
2. Cleaning at Bottom Silo 1 & 2 After

Before
Kegiatan Produksi Group B
25 Feb-06 Maret 2019
06 March 2019 ( Perawatan) Shift 1
1. Cleaning sensor of BE Mill
2. Cleaning at chute Mill Inlet
3. Cleaning Bag damaged at Packer House
4. Emptying Bolt Trap Mill
5. Check All Ducting BF Mill