Professional Documents
Culture Documents
Open Pit Short Term Dewatering Options
Open Pit Short Term Dewatering Options
screen review.
2270 Vertical dam
Joe Evert
April 2019
Didipio, Philippines
2
2270 Coanda
screen overflow
issues:
• Current flowrate around 400 l/s
• Currently bypassing 30% of water
straight to vertical dam. (circled in
RED) Want to avoid doing this.
• Although one screen is currently
blocked the water still cannot pass
through the top channel quick enough
and overflows out the top on both
units.
• Water missing catchment and running
down drive creating unsightly
rehandle.
3
Issue:
2270 Coanda screens
are not handling the
flowrate.
Video showing overflow
from front Coanda
screen and overflow
amount of water
bypassing directly into
the vertical dam.
Video
Although screen is blocked it is not creating
an overflow. (ie not the route cause)
Should there be a
baffle of sorts inside
the box the spread
the flow?
6
Actions
Require Coanda screen to not overflow and to work as
designed.
• Review design versus as-built for any obvious flaws.
• Review aperture size in catch box.
• Could it have been assembled incorrectly?
• Review closing the system by joining the intake pipe to lid and lid to box.
• Should there be a baffle inside the box to spread the water evenly?