Professional Documents
Culture Documents
Shorter Lead Time Green Company: 1.mieruka
Shorter Lead Time Green Company: 1.mieruka
SHORTER GREEN
LEAD TIME COMPANY
1. OPTIMUM TEMPERATURE
1.MIERUKA
2. GREEN AREA
2. ZERO MUDA 3. ERGONOMIC WORK SPACE
4. ANTI POLUTION FACILITY
CONCEPT DESIGN:
A. SHORTER LEAD TIME
1. MIERUKA:
- Factory operations visible from garden office (OHBEYA)
- Centralized Supplier receiving area. (Inventory Mieruka)
- Centralized and close located small part store for easy control and short
distance to production lines. (Inventory Mieruka)
2. ZERO MUDA:
- Straight process flow to minimize manufacturing lead time.
- Combine machining line to distribute man power allocation
- Small production lot and frequent withdrawal to keep store at minimum quantity
- Time efficiency by putting canteen area close with factory lines
- Different supply receiving and customer delivery route to minimize traffic.
- Quick response time by putting all operation related departments at the first floor.
CONCEPT DESIGN:
B. QUALITY
1. BUILD IN QUALITY EACH PROCESS
- JIDOKA implementations in new assembling line
- Production Man power develop quality concern by training, etc...
- Management Gemba to build culture and quality awareness of employee
- Speed quality problem information and 5 why analysis to solve every quality
problem
- Quality reward identification to improve employee pride by each line