Introduction
Stratigraphy
Tectonics
Objectives
Methodology
Conclusions
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide2
INTRODUCTION
(Norconsult, 1996)
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 3
TECTONICS
(Masrour, 2017)
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 4
TECTONICS
(Masrour, 2017)
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 5
STRATIGRAPHY
Foramtion Age
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 7
OBJECTIVES
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 8
METHODOLOGY
Tunnel Support
Analysis
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 9
Q-Value
Q-Value
Inter-block
Block Size Active Stress
Shear Strength
Rock Quality Joint set Joint roughness Joint Alteration Joint water Stress Reduction
Designation numbers Number Number reduction factor Factor
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 10
Q-Value Formula
(Barton et al 1974)
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 11
Q-Value
Q1 Q2 Q3 Q4 Q5
a b c -- -- a b a b
Subdivisions of Q-Values
(Barton et al 1974)
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 12
Calculations
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 13
Road Header
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 14
TUNNEL BORING MACHINE
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 15
Initial Support
Supports
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 16
Sprayed Concrete (Shotcrete)
Figure. Shotcrete sprayed (arrow) by workers (oval) at C2 Majohi Figure. Shotcrete spray (random)
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 17
Grouted Rock bolts
Figure. Grouted Rock Bolt (blue oval) A4, Majohi Figure. Swellex Rock Bolt
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 18
Grouted Rock Bolts
Figure. Water flowing from bore hole (red circle) A4, Majohi Figure. Rock Bolt installation C2 Majohi
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 19
Reinforced Ribs of Shotcrete (RRS)
Figure. Single Layer RRS (with swellex), C2 Majohi Figure. Project specific RRS, C2 Majohi
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 20
Lattice Girders
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 21
Umbrella Arches
Figure. Spiling
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 22
Challenges
Serial
Tunnel Section Type of Failure
No.
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 23
Roof Collapse
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 24
Roof Collapse Rehabilitation
Figure. Buttressing Tunnel Face with muck and sand bags Figure. Water Flowing through drain holes (red circles)
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 26
Collapse & Water Ingress Rehabilitation
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 27
Major Water Inflow (invert)
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 28
Major Water Inflow (invert) Rehabilitation
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 29
Shotcrete failure & Major water ingress
Figure. Shotcrete blowout & water ingress (white arrows) Figure. Damaged side wall
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 30
Shotcrete failure & Major water ingress
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 31
Conclusions
The rock quality was highly heterogeneous so the Q value assessed are between Q1 to Q5.
Slow progress of Drill and Blast technique led to a change in excavation method so TBM was selected
as the best choice for excavation due to its fast pacing and automated functionality.
Due to high water content some support systems were customized like Reinforced Shotcrete Rib,
Lattice Girders, Rock bolts & Pipe canopy System for project specific installation. To overcome
challenges in the tunnel tunnel plug, concrete plug, buttressing and remediation grouting was used.
GROUTING AND TUNEEL SUPPORT SYSTEM FOR THE SAFE EXCAVATION OF TUNNEL IN NJHPP Slide 32
Q-Value parameters
Jn
80
Jw
10 0.6
RQD
60 5 0.4
0.2
40 0 0
20
0
VERY POOR POOR FAIR GOOD EXCELLENT
Class No. Of Joint Sets Inflow
SRF
Jr
Ja
2 5
1 5
0 0
0