Presented by
S.Srilekha
D Akhila
T.Harish
A.Jyothi
K.Saishishidhar
KARIMNAGAR CABLE STAYED BRIDGE
PROJECT
TPL-GULERMAK KARIMNAGAR JV
Difference between Cable stayed bridge and Suspension
bridge
3
4
Project Location
6
Project Undertaken Companies
8
Project Overview
S.No. Description Details
Investigation, Design and Construction of High Level Cable Stayed
Bridge across Manair River at Sadhashivapally connecting
1 Scope of Work
Hyderabad-Karimnagar- Ramagundam road and Rayapatnam -Kodad
road (NH563) in Karimnagar District
2 Total Length of the Bridge 500 m
3 Employer Engineer –in- Chief (R&B) State Roads & CRN, R & B Dept. Telangana
4 Agreement Date 19-Feb-18
5 Commencement Date 19-Feb-18
6 Duration 24 months
7 Intended Completion Date 18-Feb-20
8 Structural Proof Consultant IIT, Mumbai
Soil Investigation and
9 NIT, Warangal
Geotechnical Parameters
9
General Drawing of Bridge
Advantages of cable stayed bridge in
karimnagar
Minimizes the traffic flow through existing manair road
bridge and faciltitates easy access towards
Sadhashivapally and Manakondur.
11
Salient Features
S.
Description Details
No.
Superstructure Deck Type Single Cell Precast Segmental Concrete Box Girder
12
Main structures
1. Pylons ( P2 , P3)
13
Soil Investigation-Bridge Area
14
Soil Investigation-Bore hole
15
The Way of Executing the Physical
Progress
Dimension of Foundation
S.No Description Length (m) Breadth (m) Depth (m) Shape Remarks
1 Pier 6 8 2 Sloped
3 Abutment 6 13 2 Rectangular
17
IMPORTANT VOCABULARY
1. Reinforcement
19
Pier-P1-Foundation
20
Pylon P3-Substructure
21
Abutment A1- Substructure
22
Pylon P2- Pylon Table
27
Steel and Fabrication Yard
Segment Casting Sequence
30
Segment after shuttering out
31
Segments that were casted
Type-1 42 3.46 m
Type-2 10 3.26 m
Type-3 4 3.46 m
Type-4 4 3.46 m
Type-5 4 3.46 m
Type-6 4 3.46 m
Type-7 14 3.41 m
Slump test
36
37
38
Batching Plant CP-30 with Chiller Plant 50TR
Stores
First Aid Room
Survey Tower 2 Nos
Storage of admixtures
43
Thank You