With Three or
more Pylons
9 CONSTRUMA CONSULTANCY PVT. LTD.
Main Span to Pylon Height Ratio:
With Three or
more Pylons
With Three or
more Pylons
With Three or
more Pylons
Slenderness at
centre of Main
Span
Slenderness at
Pier
Slenderness at
Haunching
Cable spacing of
All Extradosed
Bridges
Cable spacing of
All Extradosed
Bridges as a
Function of Main
Span
• The Deck depth ranges from 2.57m to 5.07m and the free standing height of
pylons is 15m.
• The cables supporting the deck penetrate through the towers without
considering friction under construction and are locked in service to withstand
the effect produced by differential forces in the stays on both sides of the
saddles due the traffic load.
21 CONSTRUMA CONSULTANCY PVT. LTD.
• The Stay Cables were made out of individual wax-wrapped galvanized steel
strands embedded in individual high-density polyethylene casings which
were grouped into high-density polyethylene sheaths, between pylon and
anchor.
• The deviation pipes embedded in the pylons were injected with wax.
• The deck was built using balanced cantilever system starting from the two
piers.
22 CONSTRUMA CONSULTANCY PVT. LTD.
MULTIPLE PYLONS-ST CROIX RIVER CROSSING STILLWATER,
USA - (2017)
• The bridge incorporates rounded organic shapes and the Extradosed Bridge is
continuous end to end.
• The five main pylons utilize thin twin wall legs beneath the deck to provide
flexibility necessary to absorb longitudinal time dependent and thermal
displacements of the deck.