IN HOUSE TRAINING
AIR CONDITIONING
PIPING AND DUCTING
JAN 2015
1
SQUIRE MECH PTE LTD
CONTENT
2
SQUIRE MECH PTE LTD
CONTENT
3
SQUIRE MECH PTE LTD
CONTENT
• PIPING Insulation
do x ln do/dp = 2k(ts-tp)/f(ta-ts)
do – pipe dia + 2 x thickness (m)
dp – pipe dia (m)
k – Conductivity, W/mK (0.0335)
ts – Surface temp > wet bulb to avoid condensate
tp – Fluid temp
ta – Ambient temp
f – Transmittance, W/m2K (5.7)
4
SQUIRE MECH PTE LTD
CONTENT
• PIPING System
– First In First Out
– First In Last Out
5
SQUIRE MECH PTE LTD
CONTENT
6
SQUIRE MECH PTE LTD
10/8/2019 7
7
SQUIRE MECH PTE LTD
Equivalent
Length Pipe
with Loss
Factor
10/8/2019 8
8
SQUIRE MECH PTE LTD
Fitting
10/8/2019 9
9
SQUIRE MECH PTE LTD
Valves
10/8/2019 10
10
SQUIRE MECH PTE LTD
Chilled Water
Piping
10/8/2019 11
11
SQUIRE MECH PTE LTD
Close System
mm/m factor
10/8/2019 12
12
SQUIRE MECH PTE LTD
Condenser
Water Piping
10/8/2019 13
13
SQUIRE MECH PTE LTD
Open System
mm/m factor
10/8/2019 14
14
SQUIRE MECH PTE LTD
CONTENT
15
SQUIRE MECH PTE LTD
CONTENT
16
SQUIRE MECH PTE LTD
CONTENT
• Calculation
– AHU, Duct, Grille
– Equivalent Length, m
– m/m Loss
– Head
17
SQUIRE MECH PTE LTD
Air Side Cals
10/8/2019 18
18
SQUIRE MECH PTE LTD
Duct Layout
10/8/2019 19
19