Professional Documents
Culture Documents
1
Content
• The seven tools of quality
• Statistical Fundamentals – Measures of central
Tendency and Dispersion, Population and
Sample, Normal Curve, Control Charts for
variables and attributes, Process capability
•Concept of six sigma, New seven
Management tools.
2
OBJECTIVE
• Understanding the seven QC tools of
continuous improvement.
• Understanding basic statistical concepts like
measurements of central tendency,
population, normal distribution.
• Application of data based approach.
• Studying statistical control chart.
3
The Seven Tools of Quality
4
The Seven Tools of Quality
• Cause-and-effect diagram (also called Ishikawa or fishbone chart):
Identifies many possible causes for an effect or problem and sorts
ideas into useful categories.
• Check sheet: A structured, prepared form for collecting and
analyzing data; a generic tool that can be adapted for a wide variety
of purposes.
•Control charts: Graphs used to study how a process changes over
time.
•Histogram: The most commonly used graph for showing frequency
distributions, or how often each different value in a set of data
occurs.
•Pareto chart: Shows on a bar graph which factors are more
significant.
•Scatter diagram: Graphs pairs of numerical data, one variable on
each axis, to look for a relationship.
•Stratification: A technique that separates data gathered from a
variety of sources so that patterns can be seen (some lists replace
“stratification” with “flPoapwiyacBhhoawrmtik”,Aossrista“nrtuPrnofescsohr,art”). 5
Sharda University.
Cause-and-effect diagram
• It is a picture com posed of lines and symbols
designed to represent a meaningful relationship
between an effect and its cause. It is developed
by Dr. Kaoru Ishikawa in 1943 and it is sometimes
referred to as Ishikawa diagram.
Cause-and-effect diagram
Cause-and-effect diagram
Pareto Diagram: (Vital few/useful many)
Pareto Diagram
Pareto Rule : ABC Analysis
The following information is known about a group of items.
Classify the items as A, B, & C.
Construction of Pareto Diagram
• There are five steps:
• Determine the method of classifying the data: by
problem, cause, nonconformity etc.
• Decide if dollars, frequency, or both
are to be used to rank the
characteristics.
• Collect data for an appropriatetime
interval or use historical data.
• Summarize the data and rank order
categories from largest to smallest.
• Construct the diagram and find the vital few.
Process Flow Diagram
For many products and services, it may be useful
to construct a process flow diagram. This diagram
shows process flow of the products and services
as it moves through various processing operations
Check Sheets
• The main purpose of
check sheets is to
ensure that the data is
collected carefully and
accurately by operating
personnel. Data should
be collected in such a
manner that it can be
quickly and easily used
and analyzed.
Check Sheets
Check sheets typically employ a heading that answers
the Five Ws:
•Who filled out the check sheet
•What was collected (what each check represents, an
identifying batch or lot number)
•Where the collection took place (facility, room, apparatus)
•When the collection took place (hour, shift,
day of the week)
•Why the data were collected
HISTOGRAM
• A histogram is a graphical display of tabulated frequencies. A
histogram is the graphical version of a table which shows what
proportion of cases fall into each of several or many specified
categories.
It differs from a bar chart in that it is the area of the bar that
denotes the value, not the height, a crucial distinction when
the categories are not of uniform width.
CONTROL CHARTS
• The control chart, also known as the ‘Shewhart chart’ or
‘process-behavior chart’ is a statistical tool intended to help
assess the nature of variation in a process and to facilitate
forecasting and management. Variations occur in a process
due to many sources such as equipment, materials,
environment, and operator.
SCATTER DIAGRAM
Scatter diagram is the simplest way to determine the cause-
and-effect relationship between two variables. Examples of
cause-and-effect relationships are:
•Cutting speed and tool life
•Temperature and material hardness
•Training and errors
•Breakdowns and equipment age
Dr. Juran and Dr. Kaoru Ishikawa popularize the use of this
chart in the field of Quality Assurance.
Scatter Diagram
CONTROL CHARTS FOR
VARIABLES & ATTRIBUTES
Control Chart for variables
and attributes
• For Variables: They are used to achieve and maintain an
acceptable quality level for a process whose product can be
subjected to quantitative measurement such as diameter of a
hole, length of a bolt, thickness of a pipe, specific resistance
of a wire etc.
• For Attributes: They are used to achieve and maintain an
acceptable quality level for a process whose product can not
be subjected to quantitative measurement but can be
classified as good or bad, as acceptable or non acceptable, as
defective or non-defective. For instance surface finish of a
table, colour or brightness of an article is either acceptable or
not acceptable.
Control Chart X & R Chart
• Variable Control Chart:
X, R Chart
Trial Central Lines & Control Limits
• The central lines for the and R charts are
obtained using the equations,
Trial Control Limits
Trial Central Lines & Control Limits
• In practice the calculations are simplified by
using the product of average of the range R
and factor A2 to replace the three standard
deviation, in the equation for
the X bar chart. Therefore the new equations
are,
Example
Appendix
Revised Central Lines and
Control Limits
• Revised central lines and control limits are
established by discarding out of control points
with assignable causes and recalculating the
central lines and control limits.
Example
Trial Solution
Trial Solution
State of Control
• When the uncontrollable causes are eliminated from the
process to the extent that the points plotted on the control
chart remain within control limit. No higher degree of
uniformity can be attained with the existing process.
• However greater uniformity can be attained through a change
in the basic process resulting from quality improvement ideas.
Process Capability
• Control limits are established as a function of the averages.
Specifications, on the other hand, are the permissible
variation in the size of the part and are, therefore, for
individual values. The specification or tolerance limits are
established by design engineers to meet a particular function.
• The true process capability cannot be determined untill the X-
Bar and R charts have achieved the optimal quality
improvement without a substantial investment for new
equipment or equipment modification.
Process Capability
• When the process is in statistical control, process
capability is equal to 6σ, where,
• σ = Ro / d2
• d2 = Factor from Appendix So,
Process Capability
Process Capability
Process Capability index
Process Capability Index, Cpk
=
x=–Lower specification Upper specification – x
Cpk = Minimum of ,
3 3
We take the minimum of the two ratios because it gives the worst-
case situation.
Process Capability index
• The capability index does not measure process
performance in terms of the nominal or target
value. This measure is accomplished using Cpk,
which is,
What Capability index represents
Problem
The following table gives the average and range in
kilograms for tensile tests on an improved plastic cord.
The subgroup size is 4. Determine the trial central line
and control limits. If any points are out of control,
determine the revised limits and central line.
Determine the process capabilities.
CONTROL CHARTS FOR ATTRIBUTES
Control charts for attributes
• The three most commonly used control charts
for attributes are,
1.Control chart for fraction defective (p-Chart)
2.Control chart for number of defective (np-
chart)
3.Control Chart for number of defect (C-chart)
Control chart for fraction defective
(p- Chart)
• Let samples (10 to 20) of size n be taken from the
production process randomly at different time
intervals. If d is the number of defectives in a
sample, then the fraction defective in the sample
is,
• P = d/n
Where, d= No. of defectives in sample. n= Total no.
of items in the sample
Then, P = Total no. of defective items in all the
samples inspected / Total no. of items in all the
samples inspected.
Calculation of Mean line, UCL & LCL
for p-chart
• The statistical theory of binomial is used to construct
the p-chart. According to this distribution, mean is
and standard deviation σp is given by,
• σp =
• CL =
• UCL = + 3 σp
• LCL = - 3 σp
Control Chart for Number
of Defectives (np-Chart)
• Let samples of size n be taken from the production
process randomly at different intervals of time. If d is
the number of defectives in the sample and p is the
fraction defective in the sample then d = np
Control Chart for Number
of Defectives (np-Chart)
Control Chart for Number
of Defectives (C-Chart)
• Has been discussed in class.
• Please refer to the numericals practiced in the
class or refer to the book.
CONCEPT OF SIX SIGMA
What is Six Sigma ?
64
• Your first question is likely….
What is Six Sigma?
Contd…
WHAT IS SIX SIGMA?
• A statistical concept that measures a process in
terms of defects – at the six sigma level, there
3.4 defects per million opportunities.
Contd…
But,PaiptiyaiBshomwmuik,cAshsitmantPororfeess!or,
Sharda University.
WHAT IS SIX SIGMA
Six Sigma is not:
•A standard
•A certification
•Another metric like percentage Rather!
•It is a Quality Philosophy and the way of improving
performance by knowing where you are and where
you could be.
•Methodology to measure and improve company’s
performance, practices and systems
WHY SIX SIGMA ?
• Six Sigma emerged as a natural evolution in business
to increase profit by eliminating defects
• The Current business environment now demands
and rewards innovation more than ever before due
to:
Customer Expectations
Technological Change
Global Competition
Market Fragmentation
SIGMA LEVELS
Sigma Level ( Process Defects per Million
Capability) Opportunities
2 308,537
3 66,807
4 6,210
5 233
6 3.4
COMPANIES USING
Six Sigma is in use in
virtually all industries
around the world. Some
of companies can be
listed as:
• Motorola
• Ericsson
• General Electric
• Sony
• Ford Motor Co.
• CITI bank
SIX SIGMA METHODOLOGY
(It takes money to save money)
• BPMS
Business Process Management System
• DMAIC
Six Sigma Improvement Methodology
• DMADV
Creating new process which will perform at Six
Sigma
BUSINESS PROCESS
MANAGEMENT
SYSTEM:
• BPM strategies emphasize on process
improvement and automation to derive
performance
• Combining BPM strategies with sigma six is
most powerful way to improve performance
• Both strategies are not mutually exclusive but
some companies produced dramatic results by
combining them.
WHAT IS DMAIC?
(Define,Measure,Analyse,Improve.Control)
• A logical and structured
approach to problem solving
and process improvement.
• An iterative process
(continuous improvement)
• Acronym for:
Define the project
Measure the opportunity
Analyze the process
options
Design the process
Verify the performance
WHEN SHOULD SIX SIGMA BE USED?
83
83
TOOLS & TECHNIQUES
• 7QC tools
Check Sheets (collect data to make improvements)
Pareto Charts( define problem and frequency)
Cause and effect diagram (Identify possible causes
to solve problem)
Histogram (Bar charts of accumulated data to
evaluate distribution of data)
Scatter diagram (plots many data points and
pattern between two variables)
Flow Chart (Identify unwanted steps)
Control charts (Control limits around mean value)84
84
Fundamental Themes of
Six Sigma
• Six Sigma is based around a number of central
themes
– A genuine focus on the customer
– Data and fact driven Management
- Process focus, management & improvement
– Proactive management
– Team based problem solving projects
– Drive for perfection, tolerance for failure
Contd….
Fundamental Themes of
Six Sigma
• A genuine focus on the customer
– Six Sigma measures start with customer satisfaction
– Emphasis on understanding customer expectations and
requirements
Contd….
Fundamental Themes of
Six Sigma
• Process focus, management & improvement
– Understanding the process is the key aspect
– Control the inputs, and improve process
• Proactive management
– Understanding of Six Sigma principles
– Defining the root cause of problems
– Setting and maintaining aggressive improvement targets
– Challenging ‘why’ things are done this way
Contd….
Fundamental Themes of
Six Sigma
• Team based collaboration
– Six Sigma is teamwork focused
– Project lead by process expert
– Facilitated by Six Sigma Black Belt
– Multi-skill experts within project team
Measure
Define
Control Analyze
Improve
Six Sigma Structure
Management
Team
Master Project
Black Belt Champion
Green
Belt
96
NEW SEVEN MANAGEMENT TOOLS
97
New seven Management tools
• Affinity Diagram: organizes a large number of ideas into their
natural relationships.
•
Relations Diagram: shows cause-and-effect relationships and helps
you analyze the natural links between different aspects of a
complex situation.
•
Tree Diagram: breaks down broad categories into finer and finer
levels of detail, helping you move your thinking step by step from
generalities to specifics.
•
Matrix Diagram: shows the relationship between two, three or four
groups of information and can give information about the
relationship, such as its strength, the roles played by various
individuals, or measurements.
98
New seven Management tools
•
Matrix Data Analysis: a complex mathematical technique for
analyzing matrices, often replaced in this list by the similar
prioritization matrix. One of the most rigorous, careful and time-
consuming of decision-making tools, a prioritization matrix is an L-
shaped matrix that uses pairwise comparisons of a list of options to a
set of criteria in order to choose the best option(s).
•
Arrow Diagram: shows the required order of tasks in a project or
process, the best schedule for the entire project, and potential
scheduling and resource problems and their solutions.
•
Process Decision Program Chart (PDPC): systematically identifies
what might go wrong in a plan under development.
99
organizes a large number of ideas into their
natural relationships.
100
Relation Diagram
101
Tree Diagram
102
Matrix Diagram
103
Matrix Analysis
104
Arrow Diagram
105
106
END OF UNIT 3
107