Ecuador

Wireline and Perforating Overview

FOR INTERNAL USE ONLY


VALUE PROPOSITION

We collaborate and engineer


solutions to maximize asset
value for our customers

STRATEGIC MAINSTAYS

BUSINESS LISTEN SERVICE TECHNOLOGY CONTINUOUS


ACQUISITION AND QUALITY ACQUISITION IMPROVEMENT
PROCESS RESPOND MINIMUMS PROCESS
How we win work How we collaborate How we do the work How we put technology to work How we remove waste

VALUES

Integrity Safety Collaboration Competition Creativity Reliability Respect

FOR INTERNAL USE ONLY 2


VISION Value Proposition:

To be the leader in Integrated Collaborating to deliver


Cased Hole solutions and integrated formation
achieve the highest growth evaluation and intervention
rate in the global Deepwater solutions to drive increased
market production

FOR INTERNAL USE ONLY 3


Wireline and Perforating Control Points
Value Proposition: Collaborating to deliver integrated formation evaluation and intervention solutions to drive increased production

FOR INTERNAL USE ONLY 4


Business complexity Electronic Maintenance

To ensure that we minimize NPT, Halliburton checks and calibrates tools before they go
to the rigsite. We also perform maintenance checks after they return from job.

Cable Maintenance
Cable is a critical part of our job, it has to on the right condition mechanical and
electricaly, for this we assure a proper control and maintenance

Wireline Pressure and control Equipment


Barriers is one of our CFA, we have to ensure the proper containment of fluids in all the
interventions.

Hazard materials
Barriers is one of our CFA, we have to ensure the proper containment of fluids in all the
interventions.

Real Time information


Our clients can obtain the real time data directly from the well, receive the log directly to
her phones throughout insite anywhere app.

FOR INTERNAL USE ONLY 5


Hazardous Materials - Explosives

 Global Standards controls and


documentation.
 Local Laws
 Hazard materials movements are
allowed only on day light 6AM –
6PM
 Military custody is needed if
movement Net explosive weight
(10 Kg). (Has to be notified within
48 hrs)
 Importation take a least 4 months
due to country regulations.
FOR INTERNAL USE ONLY 6
Hazardous Materials - Radioactives

 Global Standards controls and


documentation.
 Local Laws
 Harzard materials movements are
allowed only on day light 6AM –
6PM
 Notification mobilization to local
regulation SCAN has to be done
with at least 3 days.

FOR INTERNAL USE ONLY 7


Jobs density

 Average 40 Jobs per


month, 1.7 Jobs per day.
 3 days on average gate
to gate per job.

FOR INTERNAL USE ONLY 8


AFP - Development time line (Basic services)

NEO FV TVP Pre-School FTW Basic School Post School

0 ~2 ~4 7 ~13 25 ~37

FOR INTERNAL USE ONLY 9


FOR INTERNAL USE ONLY 10