FDY 1 STARTED 1995
MACHINE SHOP
FDY 2 STARTED 2005
STARTED – 1989
350 EMPL
350 EMPL
125000 CAMSHAFTS /
50000 CAMSHAFTS /
MTH
MTH
INTRODUCTION
• Founded in 1992.
• The company manufactures fully finished camshafts from chilled cast iron
as well as forging and steel bar stock, chilled cast iron being their ‘core
competency’.
•
FLASHBACK
IN-
1992
Established Precision Camshafts with a capacity to manufacture 7200 “semi
machined” camshafts per annum.
1994
Expanded this facility to manufacture 120,000 “fully machined” camshafts per
annum.
1995
Precision Camshafts certified to ISO 9002 by BVQI .
Established Precision Shell Cast – a foundry dedicated for manufacturing
360,000 camshafts per annum.
1997
Enhanced machining capacity from 120,000 to 360,000 per annum.
1999
2000
2006
PCL expands its foundry division to 3,000,000 camshafts per annum and its
machine shop division to 600,000 camshafts per annum.
2007
2009
2011
No of sheds 2 4 7
Straight Hollow
Camshaft
Profiled hollow (Through or Blind) for
weight reduction application by using
sand core.
Tri-Lobe Camshaft
Locomotive Camshaft
VISION & MISSION
VISION
The Precision Group which comprises of Precision Camshafts Limited and Precision
Camshafts Limited (100% EOU Division) has emerged as a Global player and intends
to supply 20% of the Global passenger car market by 2009-10.
In this endeavor, Precision Group will aim at- Supplying 12 million camshafts per
annum.
MISSION
To maximize shareholder returns.
To aim for total customer satisfaction.
To create a sustainable supply base.
To create a motivated workforce.
To create transparent working environment.
Contribution to Society in which it operates .
SET UP
Foundry shop.
Machine shop.
• FOUNDRY SHOP
• Production Department.
• Human Resource Department.
• Sales Department.
• Quality Assurance Department.
• Maintainance Department.
ORGANIZATION AND SECTION DEPARTMENT
1. Production Department: In production department the camshafts are manufactured
2. Purchasing Department: They purchase forged camshafts and the design is as per
customers demand and sends to machine shop.
3. Inspection department: In case on lathe machine operation they use Inprocess gauge it is
very useful it not only show how correct the job is made but also indicate how well tool is
performing, it also saves time and readily tells the error
4. Maintenance Department: Company having old lathe machines and CNC machine also, to
having smooth operation Maintenance Department maintain machines time to time.
5. Stored Department: The made camshaft is stored in store department until the total lot is
not completed.
Other departments:
Ferro Alloys
Steel Scrap FR / MR IG
Melting
Crucible
Laddle
Sand Store
Shell Pouring
Pattern Shell
Moulding
Chills hood
Exhaust
Chill storage
Knockout
Hopper B.E.
Waste Sand IG
Rejection (FR)
Inspection
Sand Unloading
For recycling For Recycling
OK
Shot blasting
FR: Foundry Rejection
MR: Machining Rejection
IG: Internal Generation
BE: Bucket Elevator Fettling
Final
Inspection
To Machine Shop
Dipatch
To As Cast to Customers
Manufacturing Process Flow Chart For Machine Shop –
B) Forged & Bar Stock Camshafts (Railway Camshafts)
Receive Forgings /
Bar
Remove Bend
Finish Grind
Journals
Polishing
Inspection
Packing
Dispatch To
customer
CLIENTS of PCL
CONCLUSION
www.pclindia.in
Elevation Pouring