INTRODUCTION

Cold start-up (>72 hrs) of a thermal power plant- very critical activity

Temperature and pressure of all the components


raised up to design parameters from ambient conditions

Time constraint during cold start up to minimize these stresses

Energy efficient manner in minimum possible time

SLIDE NO: 5
WHY REDUCE COLD START-UP TIME

LOSS OF DC

MORE AUX BOILER OIL CONSUMPTION

MORE MAIN BOILER OIL CONSUMPTION

HIGH APC

ENERGY AND WATER LOSS

THERMAL EFFICIENCY LOSS

SLIDE NO: 9