1. SEDIMEN DASAR
1) Karakteristik Material Dasar (Grain Size Graph, ρs)
2) Geometri Sungai
3) Discharge Rating Curve (Qw vs H)
4) Lengkung Masa Debit.
1. SEDIMEN LAYANG
1) Sediment Rating Curve (C vs Qw), atau (Qs vs Qw)
2) Discharge Rating Curve (Qw vs H)
3) Lengkung Masa Debit.
PARTICLE SIZE DISTRIBUTION
LENGKUNG DEBIT
Solo Hilir di Babat
10
Q = 0,1207h0,5892
8
R² = 0,788
Kedalaman Air (m)
0
0 500 1,000 1,500 2,000
Q (m3/s)
LENGKUNG MASA DEBIT
BED LOAD TRANSPORT
Shields equation (shear stress approach):
qb o c q b S
10
o c
10
qS gd q S2
S d
2
in which:
qb = bed load per unit width (m2/s)
q = unit discharge (m2/s)
∆ = (s- )/ (0,06 < ∆ < 3,2)
d = representative particle diameter (1,56 mm <d< 2,47 mm)
S = bed slope
BED LOAD TRANSPORT
Kalinske equation (shear stress approach):
2
qb U 2
10
*
U*d gd
in which:
qb = bed load per unit width (m2/s)
∆ = (s- )/
g = acceleration due to gravity (m/s2)
U* = kecepatan geser (m/s)
d = diameter sedimen rerata (m)
d
5 3
3 2
qcr 0,26 7
S 6
in which:
qb = bed load per unit width (kg/m.s)
q = unit discharge (m3/m.s)
qcr = unit discharge at threoshold condition (m3/m.s)
∆ = (s- )/
S = bed slope
BED LOAD TRANSPORT
Meyer-Peter-Mueller equation
(energy slope approach): 3
3 C channel 2
RS 2
q b 8 gd
3
0,047 C
d grain
in which: 12R
qb = bed load per unit width (m2/s) C 10 log
k
R = hydraulic radius (m)
S = bed slope (-)
μ = dependent on bedform (-)
g = percepatan gravitasi (m/s2)
d = diamater rerata butiran sedimen (m)
MEASUREMENT OF SUSPENDED LOAD
Methods of Sampling
• Depth Integrating Method:
– Water depth < 4.5 m two direction (up and down)
– 4.5 m < Water depth < 9 m one direction
– Water Depth > 9 m vertical should be divided into some parts
• Point Integration Method:
– Two points; one from surface and the other from the bottom
– Three points; one from surface, second from mid‐depth and third from
bottom.
– Two points; one from 80 % and the other 20% of water depth C mean
= 3/8*C1 + 5/8*C2
MEASUREMENT OF SUSPENDED LOAD
Frequency of Sampling:
• Variations in the sediment load occur due to;
– Storm characteristics
– Size, shape, geological and topographic features of
drainage area
– Stream characteristics
• Sediments should be measured twice a week but
sampling intervals can also be varied from day to a
week during low and mean water or daily during
floods.
MEASUREMENT OF SUSPENDED LOAD
Qs= a Qwb
where:
Qs = suspended transport, in tons per day,
Qw = discharge, in cubic feet (cubic meters) per
second,
a = coefficient, and
b = exponent.
Suspended sediment rating curve for Rio Too Vaco. Near
Villalba, Puerto Rico. 103-D-1807.
Basin : Upper Solo
Station : Jarum
Date
Gauge
Level (m)
Discharge
(m3/s)
Sendiment
Concentration
(mg/lt)
Sendiment
Concentration
(kg/m3)
SUSPENDED LOAD
Dec. 19, ' 88 0.56 13.84 370.00 0.37
Dec. 19, ' 88 0.60 13.78 460.00 0.46
Dec. 20, ' 88 0.36 27.29 80.00 0.08
Dec. 22, ' 88 0.45 57.42 1,030.00 1.03
Jan. 04, ' 89 1.42 165.42 2,290.00 2.29
Jan. 04, ' 89 1.30 101.48 1,680.00 1.68
Jan. 05, ' 89 0.33 53.98 730.00 0.73
Jan. 25, ' 89 0.10 33.44 100.00 0.10
Jan. 27, ' 89 0.29 39.87 110.00 0.11
Jan. 27, ' 89 0.09 41.90 1,220.00 1.22
Jan. 28, ' 89 0.15 50.64 1,940.00 1.94
Feb. 07, ' 89 0.18 38.37 210.00 0.21
Feb. 09, ' 89 0.28 59.12 860.00 0.86
Feb. 11, ' 89 0.85 12.05 30.00 0.03
Aug. 31, ' 92 0.96 188.66 1,510.00 1.51
Aug. 31, ' 92 1.27 160.21 1,990.00 1.99
Sep. 21, ' 92 0.18 0.19 140.00 0.14
Oct. 13, ' 92 0.78 0.83 60.00 0.06
Oct. 24, ' 92 0.85 0.55 160.00 0.16
Nov. 17, ' 92 0.62 1.76 150.00 0.15
Nov. 30, ' 92 0.34 16.86 730.00 0.73
Dec. 01, ' 92 0.30 19.97 230.00 0.23
Dec. 16, ' 92 0.52 8.76 170.00 0.17
Dec. 17, ' 92 0.63 3.47 150.00 0.15
Feb. 08, ' 94 0.40 10.99 50.00 0.05
Feb. 10, ' 94 1.60 58.99 1,930.00 1.93
Mar. 23, ' 94 2.24 64.72 700.00 0.70
Oct. 14, ' 94 0.12 0.01 1,040.00 1.04
Nov. 23, ' 94 0.47 0.08 160.00 0.16
Jun. 16, ' 95 0.79 5.79 40.00 0.04
Jul. 06, ' 95 0.77 4.91 40.00 0.04
Oct. 26, ' 95 0.33 0.26 100.00 0.10
Des. 18, ' 95 0.81 5.70 100.00 0.10
SEDIMENT RATING CURVE
Tanggal Jam Q, m3/dt C, mg/lt
DATA HASIL PENGUKURAN 3-Dec-92 0:00
6:00 1.18 127
KONSENTRASI SEDIMEN LAYANG 12:00 2.79 129
17:00 1.80 145
21:00 11.24 1,250
Nama Sungai : Lusi 21:30 21.78 1,675
22:00 34.29 1,890
Lokasi : .. 22:30 41.17 7,920
23:00 60.04 7,945
Waktu Pengukuran : .. 23:30 76.66 8,420
4-Dec-92 0:00 92.67 8,529
0:30 108.65 8,670
1:00 133.56 9,015
1:30 136.65 9,112
Apa yang perlu diukur: 2:00 143.96 9,004
2:30 179.26 8,971
1. Penampang sungai (cross section) 3:00 151.93 6,240
3:30 157.31 6,751
2. Tinggi muka air (Peil schall atau 4:00 160.03 6,685
AWLR) 5:00 161.12 6,742
6:00 154.61 6,021
3. Kecepatan Arus 8:00 136.13 6,080
10:00 118.42 4,200
4. Pengambilan sampel air untuk analisa 12:00 94.51 4,478
14:00 72.31 4,560
konsentrasi sedimen layang 16:00 54.15 3,798
18:00 9.64 3,981
5-Dec-92 6:00 6.47 2,605
12:00 3.91 1,070
17:00 5.14 895
6-Dec-92 6:00 3.10 623
12:00 1.54 305
17:00 0.02 317
Sactter plot data konsentrasi sedimen layang terhadap debit air.
DISCHARGE MASS CURVE