Professional Documents
Culture Documents
6 - The Physical Plant and Its Equipment
6 - The Physical Plant and Its Equipment
transport
Temp. cont: facility, environment
Equipment: selection
Furnishings
Lighting
Transportation
Plumbing
Furnishing (finishing)
PLANING: -
Prior to exposure to the architect and trustees, the hospital
pharmacist should become acquitted with the overall planning
process.
Steps for developing a functional program and supporting
materials for the architect are:
To identify hospital purposes and goals.
Determination of Pharmacy objectives and plan of operation.
Determination of functions to be performed.
determination of work flow and procedures
Estimation of work load.
determination of work areas needed
Determination of personnel to be accommodated in each work
area.
determination of space, shape, furniture, equipment and
service needs of each work area
Determination of relation ships b/w work areas and between
the Pharmacy and other Departments.
Arrangement of work areas to maximize the performance
functions.
Designing of schematic floor plans to meet requirements.
Evaluation of effectiveness of each design for meeting
requirements.
Review the above steps until an optimal design emerges.
LOCATION: -
==>THE END<==