03-CLIENT-Transition Test Plan (V0.1 Template)
03-CLIENT-Transition Test Plan (V0.1 Template)
“Testing shows the presence, not the absence of bugs” Dijkstra (1969)
<NAME>
<ROLE> <dd mmmm> 2014
Agenda
• Scope
• Test Approach
• Foundation Data Validation
• Operational Testing
• Reporting
• Defect Management
• Roles
• Risks
• Test Material
• Process
© 2014 Unisys Corporation. All rights reserved. 2
In-Scope
Validates the
Checks Doc’s and Verifies that the service is fit for
Processes against Checks the data tool is configured Steady State
list of Test has been loaded and works as Operations
Scenarios as required designed
Operational
Validation (UAT)
** If required
High impact on functionality where workarounds have to be Possible delay to test phase exit, defects to be discussed and
2 employed which are unsustainable. resolution path to be agreed by both parties.
Medium Low impact on core service functionality/availability. Possible delay to test phase exit, defects to be discussed and
3 resolution path to be agreed by both parties.
Low or no impact on service functionality. Will not delay test phase exit, defects to be fixed in future
4 releases.
• Test Manager
– Pulls together best practices and documents/manages the UAT
• Stakeholders
– Management teams that have sign off on the delivery
• SME’s
– Technical: Experts in each product or service
– Process: Expert in business process
• Test Coordinators
– Provides; input to the Test Plan, details of Test Scenarios, attends
meetings, coordinating the agents/engineers/verification activities
• Engineers/Resolvers/End Users
– Users of the delivery that will be utilised to test the services.
© 2014 Unisys Corporation. All rights reserved. 12
Risks
Impact
ID Description Mitigation % 1 -Low, 2- Owner
Med, 3-
High
TP-01 Any change in scope either due to -All requirements and scope are signed of and 25 3 Transition
change in requirements or oversight will tracked throughout the project. Managers
require re-planning and re-scoping of -All changes must be controlled and use the
Testing. agreed Change Control processes.
TP-02 Generally Test Coordinators and -Balance of pragmatic risk assessments and 75 2 Test
Testers have a day job. If they cannot prioritising requirements and tests and scheduling Manager/Test
dedicate time to the test activities the with built in contingency Coordinators/Tra
schedule will suffer and either delivery -Early notification of resource constraints nsition
dates will slip or scope will be compress -Ongoing decisions on rescheduling of milestones Management
with requirements coverage gaps v’s requirement gaps.
inevitable.
TP-03 To successfully complete UAT we For the first UAT/Go-Live we may need to ‘borrow’ 90 3 Contact Center
require Contact Center agents. The agents from other accounts. We will be testing the Lead
nature of this project means that we will training and processes, but not the actual agents
not have a customer on-board for the that will be servicing the account.
first UAT/Go-live to justify agents.
TP-04 Experience shows that customers do -Workshops with the customer to build the data 95 3 Data
struggle with Unisys requirements for -Validation of the foundation source Analysts/SME’s
quality Foundation Data. -Careful verification against requirements. E.g.
SLA notification data against JRM and Designs etc
Test Strategy
Guiding principle and methods for Deployment VVT, applicable to all projects.
Test Plan
High level test plan defining scope and approach of VVT for the Transition
SoW
No
Management
Account
No Project Plan
Testing
Approval
Role Name Company
(Y/N/C)
Account Manager <NAME> Unisys
18
© 2014 Unisys Corporation. All rights reserved. 18
Glossary
Core Core technologies are internal to ITSM, such as the application module Incident Management
Defect A defect is a failure in the tool or configuration that means the requirements are not met
EDI Electronic Data Interface. <CLIENT>’s term for Unisys B2B interface.
IM Incident Module
A potential defect. That has yet to be confirmed as a defect. This may turn out to be user error, ‘By Design’,
Issue
Query for clarification, etc.
KM Knowledge Management
Wrap Core Wrap technologies are external to ITSM, although these can interface with ITSM, such as the portal.
File/Document Description
Test Strategy High Level Test Strategy for UAT phases of validation
Test Scenario Definitions Excel Workbook containing the Scenarios with high level details and test resources
Foundation Data Excel Workbooks containing all data that describes the account
Pre Go-Live Report Excel Workbook that tracks FAT/UAT. Providing a record of progress, status of issues and Entry/Exit checklist
Test Coordinator ToR Terms of Reference describing expectations and requirements for the Test Coordinator role
Tester ToR Terms of Reference describing expectations and requirements for the Tester role
Test Manager ToR Terms of Reference describing expectations and requirements for the Test Manager role
Excel Workbook
Test Scenario Definitions
Execution Excel Work Book: Deployment standard Templates.
<CLIENT> Pre Go-Live Test and Issues Log
Unisys standard platforms.
UAT Platforms
Production Platforms
Ongoing Management Excel Workbook: Deployment standard Templates.
<CLIENT> Pre Go-Live Test and Issues Log
Test Scenario Definitions
SharePoint List
Reporting Excel Workbook Deployment standard Templates.
<CLIENT> Pre Go-Live Test and Issues Log
Test Scenario Definitions
Word Document
<CLIENT> Test Report