Maintenance
Actual Activity 06/11/2019
1. Patrol Check
2. Open and close Stop log until 2.5 meter
3. Plug HPRG with civil team
4. Routine inspection, measurement carbon brush Unit 2 (Please fill
inspection report)
5. Cleaning backwash filter A unit 2(Please fill inspection report)
6. Still continue prepare data for training berastagi substation
Maintenance
Plan Activity 07/11/2019
1. Patrol Check
2. Repair valve pressure gauge of Air cooler Unit 3 during stop request from
operator(Tamasiro)
3. Routine inspection, measurement carbon brush Unit 3 and also carbon
brush in shaft generator in lower bearing(Amri, Ericson)
4. Full check inverter for Trash rack to make sure there is no other part
damage(Harris)
5. Calculate length of cable and cctv for head tank spillway and dam
(Harris, Amri)
6. Cleaning backwash filter A unit 3 (Sanjos, Tamasiro, Flores, Haryono )
Note : Make Sure valve inlet and outlet of backwash filter A closed and
no water
7. Cleaning upper generator unit 3 from oil evaporation and dust
(Tamasiro, Flores)
8. Give OM training AIS berastagi substation(David & Andri)
Schedule For Back Was Filter Cleaning A

Unit I II III
Unit 1 8 July 2019(Dirty) 8 August 2019(Clean) November
Unit 2 4 July 2019(Dirty) 4 August 2019(Clean) 06 Nov 19(A-Dirty)
Unit 3 10 July 2019(Dirty) 11 August 2019(Clean) November

Schedule For Back Was Filter Cleaning B


Unit I II III
Unit 1 8 July 2019(Dirty) 8 August 2019(Clean) 5 Nov (B-dirty)
Unit 2 4 July 2019(Dirty) 4 August 2019(Clean) 04 Nov 19(B-dirty)
Unit 3 10 July 2019(Dirty) 11 August 2019(Clean) 29 Oct 19(B-dirty)
Runner Inspection
First Run after
Unit change Runner Inspection II Inspection III Inspection IV
15 October 2019
Unit 1 26-Feb-19 5-Aug-19 (±4000 hours) 6000 Hours

18 September 2019 6000 Hours


Unit 2 10-Jan-19 12 June 2019 (±4000 hours)
26 September 6000 Hours
Unit 3 3-Apr-19 2019(±4000 hours)
Time Table Air Cooler Cleaning
Unit 1 2 3 4 5 6

Unit 1 12/09/2019 16/09/2019 17/10/2019

Unit 2 10 /09/2019 17/09/2019 16/10/2019

Unit 3 19/09/2019 08/10/2019


• Schedule For Maintenance Hydraulic Governor(Every 3 months)

Unit Previously Next


Unit 1 06 August 2019 October / November
Unit 2 19 July 2019 October / November
Unit 3 07 August 2019 October / November