You are on page 1of 4

SJF (PREEMPTIVE)

Proses Brust Time Wkt kedatangan


P1 10 0
P2 2 1
P3 5 3
P4 8 2

P1 P2 P2 P3 P4 P1

0 1 2 3 8 16 25
Waiting Time : P1 = 0+15 = 15
P2 = 0 – 1 = -1
P3 = 3-3 = 0
P4 = 8-2 = 6
Average Waiting Time : (15+(-1)+0+6=20/4= 5)
Turn Around Time : P1 = 25 – 0 = 25
P2 = 3 – 1 = 2
P3 = 8 – 3 = 5
P4 = 16 – 2 = 14
Average Turn Around Time : (25+2+5+14= 46/4 = 11,5)
SJF (PREEMPTIVE)
Proses Brust Time Wkt kedatangan
P1 8 0
P2 2 1
P3 3 2
P4 6 3

P1 P2 P2 P3 P4 P1

0 1 2 3 6 12 19
Waiting Time : P1 = 0+11 = 11
P2 = 0 – 1 = -1
P3 = 3-2 = 1
P4 = 6-2 = 4
Average Waiting Time : (11+(-1)+1+4=15/4= 3,75)
Turn Around Time : P1 = 19 – 0 = 19
P2 = 3 – 1 = 2
P3 = 6 – 2 = 4
P4 = 12 – 3 = 9
Average Turn Around Time : (19+2+4+9= 34/4 = 8,5)