Professional Documents
Culture Documents
Oakton High
School
Legacy II
2
Presentation Outline
System Overview
………………………………………………………………………………………………………… 3
Rocket Design
………………………………………………………………………………………………………… 9
Payload Design
………………………………………………….…………………………………………………… 21
Payload Electronics
………………………………………………………………………………………………………… 28
Software
………………………………………………………………………………………………………. 41
Ground Station
………………………………………………………………………………………………………… 47
Testing
………………………………………………………………………………………………………… 51
Flight ………………………………………………….……………………………………………………
Operations 54
Program Schedule
………………………………………………………………………………………………………… 56
Program Budget
………………………………………………………………………………………………………. 58
Summary
………………………………………………………………………………………………………… 60
……………………………
3
System Overview
4
Team Organization
Sai Landon
Mission Summary
• Stability of 2+ calipers
• Successful deployment of both parachutes
Rocket Requirements
• Successful recovery
• Relaunched within in 2 hours of recovery
Rocket Design
8
Design of Rocket
9
Compartment
11
Design of Rocket
Design of Rocket
2.24”
Semi-Span 3.7”
x3 Fins Area: 13.4 in²
Sweep Angle 21°
Rocket Materials
Plastic
Rail Button
Bluetube
Altimeter Trade
Perfect flite Eggtimer Missile Works RRC2+
MAWD Quark Downloadable flight curves
Readily available
Weight 2.36” x 0.63” x 0.48” 1.1” x 0.68” x 0.31” Less fabrication required
Primary Motor
J415W
(Aerotech)
7.20:1 Thrust-
Weight Ratio
Total Impulse:
1201.3 N s
23
Secondary Motor
J401FJ (Aerotech)
Payload Design
25
Identical Specifications
Less Pins
Cost $10.18 $14.95 $8.25
Expensive
Cost $154.95 $39.00
Selection
Budget Friendly
LITHIUM PHOSPHATE LITHIUM ION
Rechargeable
Software
32
Telemetry Transmission
of a transmission error
• On the other side, the
ground station will display
the data.
35
Harshvardhan
Sahay
1. Line by Line Debugging
Prototyping 2. Breadboarding
3. Custom Simulations
36
Ground Station
37
Portable
Laptop
Radio
Receiver Process
Softwar or
e
Storag
e
Radio
Transmitter
USB
Dongle
38
Same Radio/Antenna as
Payload
Safety
41
Safety
• Safety Plan
• All member will have passed Fairfax County Safety Tests
• Safety Practices
• General safety briefing before construction phase begins
• Hazard Mitigation
• Flight Checklist
• Will follow proposed Launch Checklist
• Changes will be made through subscale launch
42
Testing
43
Payload Testing
• Confirm start up of
Sensors • Attempt Radio
Test: Battery • Fly Payload in Rocket
both STM32s Transmission • Confirm Software is
• Individual Sensor • Confirm Data • Measure battery life
functional
Testing Transmits with all components
• Breadboarding running
• Confirm data displays • Measure battery life
in optimized mode
Power Up Test: Radio Test: Payload
44
Flight Operations
45
Flight Operations
Program Schedule
47
Program Schedule
48
Summary
49
Summary