BUILDING MULTIPLE DAMS ACROSS A RIVER • Data Required is massive • Exclusive Hydrological Survey is Necessary • Pondage can be used as water storage • Dams should be constructed such that the preceding dam should be above the 100 Year Flood Line of the succeeding dam • Infrastructure and Data Centric thereby expensive • The Columbia River (USA), running from British Columbia to Washington state & Oregon, has 14 dams on the main stem and many more on tributaries BUILDING MODELS OF RIVERS • Major Hydrological Survey of the nation required • Building Computer Models that can correctly “predict” rivers • The result from the models can then be used to forecast stage of river during extreme climate events • The models can thereby prompt pre-emptive action • This result if utilized properly can be a tool to predict the future feasibility of HPP • This method is expensive and data-centric