THE BANTACAN NATIONAL HIGH SCHOOL

Project Name: School Fence (phase 1)


Purpose: TO PREVENT CUTTING CLASSES AND FOR STUDENTS SAFETY.
Materials APPROXIMATION PER SPAN

ITEM QTY. COST/ITEM TOTAL COST


Wood
1X2X8 26 pcs 33.33 867
PLY WOOD 4 pcs 350 1400
HB 70 pcs 9 630
Cement 10 sacks 350 3500
Round Bar 10 mm 10 pcs 148 1480
Tie Wire 1 kl 75 75
Nails Common
#2 1 kl 75 75
#2 ½ 1/2 kls 38 38
Sand and Gravel 1 load 700 700
Over all total cost of materials: 8765
Labor: 3000
Over all total expenses: 11,765 x 2= 23530

Project Name: School Fence (phase 2)


Materials APPROXIMATION PER SPAN

ITEM QTY. COST/ITEM TOTAL COST


HB 70 pcs 9 630
Cement 10 sacks 350 3500
Round Bar 10 mm 10 pcs 148 1480
Tie Wire 1 kl 75 75
Sand and Gravel 1 load 700 700
Over all total cost of materials: 6385
Labor: 2200.00
Over all total expenses: 8,585 x 261 span = 2,240,685.00 + 23,530 = 2,264,215