Purpose: TO PREVENT CUTTING CLASSES AND FOR STUDENTS SAFETY. Materials APPROXIMATION PER SPAN
ITEM QTY. COST/ITEM TOTAL COST
Wood 1X2X8 26 pcs 33.33 867 PLY WOOD 4 pcs 350 1400 HB 70 pcs 9 630 Cement 10 sacks 350 3500 Round Bar 10 mm 10 pcs 148 1480 Tie Wire 1 kl 75 75 Nails Common #2 1 kl 75 75 #2 ½ 1/2 kls 38 38 Sand and Gravel 1 load 700 700 Over all total cost of materials: 8765 Labor: 3000 Over all total expenses: 11,765 x 2= 23530
Project Name: School Fence (phase 2)
Materials APPROXIMATION PER SPAN
ITEM QTY. COST/ITEM TOTAL COST
HB 70 pcs 9 630 Cement 10 sacks 350 3500 Round Bar 10 mm 10 pcs 148 1480 Tie Wire 1 kl 75 75 Sand and Gravel 1 load 700 700 Over all total cost of materials: 6385 Labor: 2200.00 Over all total expenses: 8,585 x 261 span = 2,240,685.00 + 23,530 = 2,264,215