You are on page 1of 3

WAYS TO

CONTROL SOIL
EROSION
ACTIVITY
Group yourselves into 5. Each group will draw a
name of a way on how to control soil erosion to be
reported in front of the class. Each group will be
given 30 minutes to do the task. Each group will
answer the questions below:
1. Describe the way to control soil erosion
assigned to your group.
2. Give the procedures to control soil erosion
from your assigned topic.
3. REPORT TO THE CLASS

You might also like