Professional Documents
Culture Documents
Evacuation Procedure/Routes:
Evacuation Meeting Area Following Evacuation:
All personal must proceed to the:
Engine Room
Proceed through exit doors; go to south side of the building
and to the Evacuation Meeting Area.
Ammonia Awareness & Safety Training
Emergency Action Plan
Evacuation Procedure/Routes:
Roof Areas
After descending from roof, proceed along the outside of the
building to the South side of the building and to the
Evacuation Meeting Area. Do not go inside the plant or in
the direction of the Engine Room.
Questions?
Thank You