You are on page 1of 12

WELL CONTROL

What Is Warning Signs

Information From the Well That


Tells You That the Well May Be Getting
Close to Being “Under Balanced”
Your Safety Margin Is Getting Less.

1
WELL CONTROL
Kick Warning Signs
1. ROP Changes
Overbalance Less
Softer Rock
2. Hole condition
Squeezing Rock
Torque / Drag / Fill
3. Data from Mud
Gas Chlorides
Cuttings Shale Property
Temperature Trip Monitor

2
WELL CONTROL
Major Warning Signs
Improper Fill up or Displacement During Trips
Connection Gas
Increased Background Gas
Increased Drilling Rate
Flowline Mud Temperature Increase
Increased Chloride Content of Mud
Increased Drill String Torque
Increased Drill String Drag
Increased Number and Size of Cuttings
Decreasing Shale Density

3
WELL CONTROL
What Is a Drilling Break
Sometimes Called ‘Fast Break’
A Sudden Increase in R.O.P
How Much
How Far to Drill ?
What About a Decrease in R.O.P ?

What Affects ROP


WOB Hydraulics
RPM Rock Type
Bit Type Overbalance

4
WELL CONTROL
Increased Drilling Rate

9850’
9.00
Increasing
9.15 Drill Rate
9855’ (ROP)
9.30
9860’

Geolograph Chart

5
WELL CONTROL
Increased Drill String Torque

6
WELL CONTROL
Cuttings Size and Shape

Drilled cuttings

‘Knocked Off’,
Heaving Shale Cuttings

7
WELL CONTROL
Cause of Connection Gas
Mud Static Mud Circulating Formation Under Control
Kick Can Occur Connection Gas being Circulated to Surface
0 3000
psi psi

Annular
Pressure Loss
= 250 psi

11 ppg
mud
BHP= BHP=
6864 psi 7114 psi
12000’

7000 psi Formation Pressure 7000 psi

8
WELL CONTROL
Flow Line Temperature Graph

9500’
Normal
9600’ Pressure
9700’
9800’
Abnormal
9900’
Pressure
10000’
10100’
10200’
Temperature Increase

9
WELL CONTROL
Shale Density Graph
Abnormal Pressure Zones Exhibited a DECREASING
Shale Density with DEPTH

Normal Trend Line

Shale
9500’
9600’ Sand Shale Normal
9700’ Pressure
Sand
9800’
Shale
9900’
Increasing
10000’
Formation Fluid
10100’ Pressure
10200’ Sand

Increasing Shale Density

10
WELL CONTROL
Surface Kick Indicators
Excess Flow From the Well When Tripping
Return Flow Rate Increase When Pumping
Pit Gain
Drilling Break
Decreased Pump Pressure/increased SPM
Flow From Well With Pumps Off

11
WELL CONTROL
What Action to Take?

First : Shut the Well In


Second : Choose and Use a Kill Method to
Restore the Mud Hydrostatic
Pressure to Level That Re-Establishes
Primary Control

12

You might also like