PLASMOLITE WALLS

INTRODUCTION
 Plasmolite are wall panels that saves from hassles of brickwork, Hollow block & Plastering.

 Plasmolite is environmentally friendly building material manufactured under Green policy

 Available thicknesses –
62mm,87MM, 112MM, 137 MM , 162 MM and 212 mm
 Labor Productivity- 35sqm /day with Gang of 5-6 nos

 No gravels required
 Fire-rating of 3- 5.30 Hrs.
 Better sound proofing than AAC blocks and bricks
 Curing not required
 Speed –Up to 3 Times Faster
 Plaster not required
 Significantly less skilled labor requirement

 Cost of Plasmolite Panels (Based on rates quoted for Godrej Central Project, Sahakarnagar, Mumbai)
 For 112 mm Thick Wall- Rs 1800/ Sqm (inclusive of all applicable taxes)
 For 162 mm Thick Wall- Rs 1900/ Sqm (inclusive of all applicable taxes)
INSTALLATION PROCEDURE...

Installing Dowels
inside Beams,
Columns using Stacking of Fiber
epoxy raisin. Panels.
Positioning and Placing of Bottom
sticking of Spacers on Angles.
panels Positioning of Fiber
On drying, cutting into Panels
specified Dimensions Supporting angles fixing
Support
for positioning
arrangement with MS
Channel Purlins for
METHOD holding panels
Three major steps involved as follows:
 Panel Fabrication.
 Installation . Concreting using
 In-situ Concreting. Installation
foam concrete
Procedure
JOINT TREATMENT

 Joint treatment is done using mesh tape &


putty.
 One coat of putty is applied to close joint, than
second coat is applied in order to flush
recessed part. Mesh tape to improve its hold
over the wall

JOINT SPLICING
 Joints between two panels are made of using
FCB strips 50 mm wide inside the panel with
the help of glue, screws & tacking pins.
TYPICAL SECTIONS
TECHNICAL SPECIFICATIONS
CONVENTIONAL BRICK/BLOCK WORK VS PLASMOLITE

COMPARISON CONVENTIONA PLASMOLITE COMPARISON CONVENTIONAL- PLASMOLITE


L BLOCKWORK
-BLOCKWORK
Internal & External Required Not Required Painting Any applications Any applications
Plaster
Lintels, BUND Beams Required Not Required OPO/PUTTY/NE Required Not Required
,Mullions ERU
Curing Required Not Required Joints Not Treated Treated with acrylic
sealant
Junctions Hacking Steel Dowels Leakages Through Junctions Junctions sealed with
Density 1900-2000 600-1000 Kg/m3 sealants
Kg/m3 Water Seepage Possible Seamless structure.
Modifications & Possible Possible with No seepage
Tiles/Hard Cladding adhesives Conduits ,Pipes Chiseled & Pre-Fixed
Door/Window Openings During During Finishes
Construction Construction Fungal/Termite - Fungal/Termite Proof

Door/Windows Frames Prefixed/Post Prefixed/Post Special Tools Not Required FOAM Generator &
fixed fixed Pumps
MOCK-UP AT GODREJ CENTRAL
Note-Web- www.fabforms.ae
IMAGE GALLERY
ABOUT THE AGENCY - FTS BUILDTECH PVT LTD.

 FTS offers a wide range of load-bearing & infill wall system for Residential, commercial & industrial
applications.
 Most premium offerings include:
 Plaswall-Loadbearing walls
Plasmolite-Non-loadbearing walls

FTS ppt Plasmolite

Company profile attached for reference.

-