2. Performance standard
2-1. Electric Capacity
2-1-(1) Standard
2-2. Electric Performance Test
2-2-(1) Cold Start Test @ 43°C
2-2-(2) Cold Start Test @ 25°C
2-2-(3) Comp operation after Defrost
2-2-(4) Insulation Resistance test
2-2-(5) High Voltage Test
2-2-(6) Leakage current test
2-2-(7) Water Spillage Test
2-2-(8) OLP Non Operation Test
2-2-(9) OLP Operation Test
2-2-(10) Earth Continuity Test
2-2-(11) EMC and EMI Test
Contents List
3. Structure Standard
3-1. Structure Reliability Improvement
3-1-(1) Door switch Operation test
3-1-(2) Vibration test
3-1-(3) Closed Surrounding Pull down Test
3-1-(4) Severe Closed Surrounding Pull down Test
3-1-(5) Door open/Close Strength test
3-1-(6) Door stability/Tip Over Test
Contents List
Contents List
4. Appearance Standard
4-1. Appearance Structure Standard
4-2. Marking
5. Handling Ability
5-1. Control of Operation
5-2. Handling Method
6. Safety
6-1. Electric standard
6-2. Use Condition & warranty
6-3. Safety Device
6-4. Inflammable material
6-5. PL Spec
6-6. Base Model
6-7. Usage Guarantee
6-8. Risk Level
7. Reliability Standard
7-1. Defect Ratio
7-2. Product Life
9. Operational standard
9-1. A/S Standard
9-2. Instruction manual Description
9-3. Working CI
- End -
10. CTQ Table
(3) Sales volume For detail, refer to CP fair report (Unit:K sets)
& Total production
Year Next year Here after
Domestic 40 45 50
Sales (K
No.s)
Export - - -
TTL 40 45 50
(unit)
Prod
(B) Profit
LG Electronics
LG(61) Design 060 A4 (950225)
LG(61) Design 060 A4 (950225) 10 LG Electronics
Design Standard
Division Item Design Standard
(16) DRBFM
: Refer to PP NPI DRBFM status, DVPMS
LG Electronics
LG(61) Design 060 A4 (950225)
LG(61) Design 060 A4 (950225) 11 LG Electronics
Design Standard
Division Item Design Standard
1.2 (1) Standard Division Main Characteristics
Product Voltage and
Basic Main GL-*322** GL-*302** GL-*292**
Model
Spec. Characteristics
Voltage & Frequency 230V/ 50Hz
(2)Appearance
Model Name GL- *322** GL- *302** GL- *292** Remarks
Compressor details :
Safety -
Temperature T-class
2.2 (1) Cold Start - Minimum Start voltage should not be more than 160V.
Electric Test (F0- - Applicable to Non Low Start ability USP
Performance 3002) - On input of V1,compressor should start within 1 minute.
Test (RT: 430C) - Compressor should not stop and OLP device should not
operate during test.
(2) Cold Start Test Start Voltage is <=135 V with Low Start ability USP
(RT: 250C) At 25 degree.
(ICTS/CHM/025)
- On input of V1,compressor should start within 1 minute.
- Compressor should not stop and OLP device should not
operate during test.
(3) LVS & HVS - Soak the Product at RT 25°C & 65 % RH till all temp. get stabilized
(RT: 250C & - Follow test procedure as per ICTS standard .
RH 65%) Judgment criteria : OLP tripping, function loss of any
(ICTS/CHM/30) electrical parts is not allowed during the test .
(4) Compressor
operating after - RT 43℃, -10% at rated voltage,
defrost - The system must be operated by Thermostat sensor
(F0-3002)
(5) Insulation - That is more than 10 ㏁ after temperature connection test.
Resistance - That is more than 5 ㏁ after test result.
Test - That is more than 2 ㏁ after high humidity defrost, much
(F0-3005) moisture, practical use run test.
- 1500 V, for 1 minute is inputted on refrigerator
(6) High Voltage
No breakdown of insulation.
Test (F0-3005) (1800 V , for 1 sec ;LQC acceptance)
(7) Leakage
Current Test Leakage current is Under 0.3 ㎃ (Test condition : Max capacity of
(F0-3005) defrost test, Severe condition (RT 60℃↓ ,RH 85~90% for 10 days)
(9) OLP Non -RT43 ±10C,at Std. Voltage 260V,forcefully continuously running
Operation Test the machine, after stabilization of temperature, the refrigerator
(ICTS/CHM/003) must operate by Thermostat sensor at -15% V of Rated Voltage.
- No OLP tripping should be observed during test period
- .No overheating sign should be observed on compressor
assembly.
- Comp. Wdg. Temp.< 1500C(A grade),<1650 C(H Grade).& OLP
surface temperature should be less than OLP operating temp.
(10) OLP - After taking R1 at 500C,start the machine at RT 45 ±10C & 253 V
Operation Test ,then room temp. increased to 500C at the rate of 20C/20 min, at
(ICTS/CHM/032) this time if OLP does not trip, then increased the voltage up to
312 of rated voltage at the rate of 2V/10 min. Even if OLP does
not trip, then open the door. Again if OLP does not trip then cover
the M/c
(11) Earth The voltage drop between the earthing terminal of the appliance or
Continuity test the earthing contact of the appliance inlet and the accessible metal
(IEC 335-2-24 part is measured. The resistance calculated from the current and this
27.5 paragraph) voltage drop shall not exceed 0,1 Ω.
① The insulation resistance between LEAD WIRE C/F ASM
connector & cabinet (COMP BASE, HINGE LOWER)
② Between Machinery room ground terminal LEAD WIRE C/F ASM and
THERMOSTAT SHAFT -Tester :12V.25A
CONTINUOUS DISTURBANCE
(terminal noise) EN55014
DISTURBANCE POWER
(Noise electric power) EN55014 Margin> 3.0dB.
E
DISCONTINUOUS ISTURBANCE EN55014
(Discontinuity noise)
M
HARMONICS EN61000-3-2 A class
Note 1 ) Note 2)
I
FLICKER EN61000-3-3 Satisfy LIMIT.
Note 1 )
RADIATED DISTURBANCE EN55022
(Radiation noise) Margin 3.0dB.↑
IMPULSE
E (BURST)
LG(61)-F0-3057 B class
LIGHTING SURGE
C (Earth) LG(61)-F0-3057
16
Design Standard
Division Item Design Standard
Note 1) the HARMONICS and the FLICKER are applied in only Europe
export.
V
dc
dmax
3%
t
dt
FUNCTION A CRITERION
Data storage
2 2
Suction Pr. (Ps) < 0.5 Kg/cm G < 2.5 Kg/cm G
- RT 43±10C, RH 65±5%
Item Position Cooling Speed
TF :(430C to -50C) 1/3 h 130 w/o Durachill; 150 With Durachill Within
Operation ratio (%) (Below 55) Below 65 Below 80 (Below 55) (Below 80)
-.The refrigerator compartment average temp(each shelf) should be less than 5℃.
- Min. Stopping time of comp. Should be > 3 mts.(Cycling)
*
For Procedure Only
15mm 15mm
(7) Ice Making -RT 430 C, Rated V (230 V) , Thermostat in maximum position
Test & Obtain stable condition, after this put ice tray filled with water up
(IS 1476 PART1 to 5 mm from top with water temperature 30± 10C. The contact
,2000) surface of ice tray should be wetted
Time taken to reach the ice temperature - 5 0C, must less than
180 minute. CTQ2
Ice making time must not greater than 110 % of manufacturer given
time.
(10) Load Test RT 300C , T/S - Normal, One layer of beer Bottle in each upper shelf
(ICTS/CHM/007) ( 10 No. Each) & 6 bottle in lowest shelf. Each door basket 05 bottle
,1/2 kg M package in Freezer.
Cooling Speed :To reaching following Temperature
M- package -8 0C , Shelf Bottle 7 0C, Door Basket 10 0C
(With Power) Open the F door for 10 sec & close then Check the open force
for R Door after 5 Sec. of F Door close & vice versa for 5 times
(10s Open, 5s close door, every stable time is over 1min)
RT:32℃ RH:65%
Door Close Door Close
Door Time Spec’ Door Time Spec’
General 7kg ↓ General 5kg ↓
Door-R Door-F
10sec 7.5kg ↓ 10sec 5.5kg ↓
(5) Closing Force : - When R door opened at 90O angle and it closed with an
Freezer Door Test impact force of 1±0.15Kgf, the freeze should not open
automatically.
- But it is acceptable that a little opened F Door is closed
automatically.
(6) Refrigerant - Instrument: Halogen Leak Detector(Leak rate CFC:1.7g/Yr,
Leakage Test CFC Free:1.43gm/Yr),No leakage on any of joints
(KSC 9305,5.1cl.)
(7) Shelf -2 stacks of Beer Bottle capacity: 640 ml each on shelf & door
Strength opening & closing 5 times, Test Duration 6hrs.
Test The bending values as per table below,
(F0-3028)
Front <15mm
Shelf
Back < 25mm
Sagging
Centre < 25mm
(10) Hot & Cold - Low Amb.(-20 ±10C, 45hrs): To be put after 1 Hr. of foaming.
Cycle Test
(F0-3038) - High Temp.(45±10C, 10Hrs): To be put after 1 Hr. of foaming.
(12) FINGER - After taking out the cover Back M/C by hand without tool,
TEST try to push with 3 kgf. Force by TEST FINGER for 3 times,
(IEC 335-18cl) the finger should not touch the LEAD WIRE or other live parts
(3) Closed - The unit cover by a wooden enclosure with panel Top Gap
Surrounding 300mm, Sides: 10mm, Back: 100mm & RT 32 ±10C, Std.
Pull down Test Voltage, Continuous Running(short circuit Thermostat)
(F0-3017)* - Wdg. Temp :< 1200C(E-Grade), < 1050C(A-Grade)
(4) Severe
- All sides gap. of 10mm(except front area), RT 35±1mm,
Closed
at std. Voltage & continuous running
Surrounding
Pull down Test - Wdg. Temp. : < 1350C(E-Gr)
(F0-3017)*
- OLP : OLP tripping during this test is allowed.
. Hinge parts :
- Hinge tightening TORQUE after test > 1/ 3 value of torque
before start of test
Freezer
door
Spring balancer
Refrigerator
door
Tip over
F door R door
force (kg)
- Component Standardization
3.3
Structure (1) Part common Refer to 3S plan.
For
Maintenance
2) Criteria
①Drawer must retain the test load plus overload.
②Drawer should not fall off.
2) Criteria
①Drawer should not be cracks, breakage and fall off.
②Correlation parts should not be cracks, breakage and
fall off.
Back
A B C
Front
2) Criteria
①Drawer should not be cracks, breakage and fall off.
②Correlation parts should not be cracks, breakage and
fall off.
Ex) Check the side rail of drawer, Guide Rail, Rail Roller.
B A C
Impact height
2) Criteria
①Drawer should not be cracks, breakage and fall off.
②Correlation parts should not be cracks, breakage and
fall off.
Ex) Check the side rail of drawer, Guide Rail, Rail Roller.
B A C
Impact height
2) Criteria
①Drawer’s front must show no breakage, cracks.
B A C
2) Criteria
①Drawer’s bottom must show no breakage, cracks.
2) Criteria
①Drawer’s deco must not be pulled free from its location.
Back
A B C
Front
UL250 8.26 Clause -According to.3-3-6-4, after loading tray, put 13.6Kg load at the
Container Restraint stopper in front direction for two minutes. In this time, tray must not
(UL) be pulled free from the stopper.
H
W
2) Test Method
①Test A : Impact 2kg steel ball each once at the position
A(Gate),B,C,D,E,F of 140mm height.
②Test B : Impact 2kg steel ball each once at the position
A(Gate),B,C,D,E,F of 50mm height.
3) Criteria
①Basket’s bottom must show no breakage, cracks.
②Basket should not fall off and tilt due to the breakage of
basket racks.
(If basket tilt, basket must be loaded as calculated static
load values.)
③Basket’s front must not be pulled free from its location.
C A E
Impact height D B F
(Positions for applying impact)
2) Criteria
①Basket’s front must show no breakage, cracks.
②If there is assembled a window, it must not be pulled
free from its location due to the breakage of assembly.
B A C
(Front positions
(Basket Front Impact Test) for applying impact)
2) Criteria
①Basket must retain the test load and overload.
②Basket must not fall off.
UL250 8.27 Clause -.After impacting a steel ball(51mm diameter, 540g weight)
at the center of glass shelf from 413mm height, the shelf
3-3-6-2 Glass
should not be breakage.
Shelf Strength
UL250 8.27 Clause -.After impacting lead bag (Max. 10kg) equal to one-half load
Shelf Impact of 3-3-6-4 standard three times at the center of shelf from
& Cover Impact the height (maximum loading height (H) - 150mm), the shelf
must retain the test load.
2) Criteria
①Shelf should not be cracks, breakage and fall off.
②Correlation parts should not be cracks, breakage and
fall off.
Back
A B C
Front
(Positions for applying
(Sliding Shelf Restraint Test) restraint force)
UL250 8.26 Clause - .According to load test, after putting a load on shelf, apply a
Sliding Shelf force(13.6kgf) to the front direction of shelf for two minutes.
Restraint After that, the shelf must retain the test load and not fall off.
2) Criteria
①Shelf must retain the test load.
②Shelf should not be cracks, breakage and fall off.
2) Criteria
①Shelf must retain the test load and overload.
②Shelf should not fall off.
2) Criteria
①Cover T/V should not be cracks, breakage and fall off.
②Correlation parts should not be cracks, breakage and
fall off.
Back
B1 C1
A1
Impact Height
B2 A2 C2
Front
(Positions
(Cover T/V Impact Test) for applying impact)
2) Criteria
①Cover T/V must retain the test load.
②Cover T/V should not be cracks, breakage and fall off.
2) Criteria
①Shelf must retain the test load and overload.
②Shelf should not fall off.
2) Criteria
①Protruding Cover should not be cracks, breakage and
fall off.
B A C
2) Criteria
①Flap up part and Correlation parts should not be cracks,
breakage and fall off.
Ex) Drawer, Guide Rail etc..
(Flap Up/Down
Mechanical Life Test)
2) Criteria
①Flap up part and Correlation parts should not be cracks,
breakage and fall off.
2) Criteria
①Flap up part and Correlation parts should not be cracks,
breakage and fall off.
A B
2) Criteria
①Ice bank’s bottom must show no breakage, cracks.
2) Criteria
①Guide Rail should not be cracks, breakage and fall off.
②Correlation parts should not be cracks, breakage and
fall off.
Ex) Check the side rail of drawer, Guide Rail, Rail Roller.
3) Safety device
No Device Spec
Def heater over heating
1 Temp Fuse
protection (77℃)
2 OLP Utc((1.05 ~1.35))
3 Main fuse 250V ,9A
Ln R(t)
. Ratio Defect[λ] =
-t
- Method of Earthing/Requirement
- Power Cord Handling/Type & Fixing
9. (1)A/S :Standard - Structure Parts: 2 Yrs After Prod. Drop (Stock control : 8Yrs.)
Operat - Control Parts : 8 Yrs. After manufacturing
ional
Stand (2) Instruction - In case of any problem contact nearest Service Centre
ard Manual Description.
10.CTQ
TABLE CTQ TABLE
NO Z-Value Data Source
CTQ1
CTQ1 4.0 A:Estimate
B:Existing
CTQ2 4.0 Data
C:6 Sigma
Data
R&D Refrigerator
10
11
12
Deliberation
Confirmation
2. Basis SPEC
'
2.1, Package
SPEC
① BOX 1
② P/UPPER 1
③ P/BASE 1
④ P/CORNER,F 2
⑤ P/CORNER,B 2
⑥ P/FRONT 1
⑦ BAG-PE 1
⑧ P/UNDER DOOR 1
2.1. 1. BOX
SPEC
(VKG220xSK150xSK150xSK150xVKG220
LGEIL 13.9 NA NA
)
2.1. 2. P/Upper
1) Quality of the material: EPS
2) Function
- P/Upper separates load, and protect product , back side and left, right slant impact
when load product.
- Packing prevent damage to product during stacking
2.1. 3. P/Base
2) Function
2.1. 4. P/Corner
F
1) Quality of the material :
EPS
2)
Function
- Protect product at machine (Clamping) loading and unloading of
product.
- Fill composure space in package box, and box's shape is kept,
and increases Packaging box's strength.
2.1. 5. P/Corner
B
1) Quality of the material: EPS
2) Function
2.1. 6. P/Front
2) Function
2) Function
2.1. 8. P/Under
Door
1) Quality of the material : EPS
2) Function
3. Package strength
Test condition A B C D
1) Application scope
To check transportation worthiness of product during vertical and horizontal shipping conditions.
2) Test Condition
Packing weight Kg
Index
11~20 21~75 76~120 >120
Bottom A 4m 4m 2m 2m
Front B 1m 1m 0.5m 0.5m gth
Back C 1m 1m 0.5m 0.5m Len
Right D 1m 1m 0.5m 0.5m
Left E 1m 1m 0.5m 0.5m
10deg
Product weight table for inclined impact test
1) Application Scope
To check transportation worthiness of product in Indian simulated transportation conditions. i.e. Road
and railways.
2) Test condition
59
LG(61) Design 060 A4 (950225) LG Electronics
Design Standard
3.2. 3 Violent movement test
No. of drops:100
1) Application scope
Height :65mm
To simulate product behavior in standard sea container.
Refrigerator
2) Test condition
Place the product on violent shock tester (tie with belts) and the H = 65mm from 100
times it will have to move violently.
1) Application scope
Test simulates ware house loading and unloading conditions of product.
2) Test condition
Drop product at all four corners from a height of 300mm and drop the product at all 4 sides from a height of
500mm. After that drop the product (straight) from a height of 500mm.
Take final observation of complete product in view of any damage.
Judgement criteria:
No damage should be observed to the product during & after the test
Notes:
1. A product should be subjected to either vertical or horizontal test, not both.
2. Each model to be evaluated for vertical and horizontal tests.
3. Sample size one for horizontal and one for vertical test.
60
LG(61) Design 060 A4 (950225) LG Electronics
Design Standard
3.2. 5 Stack test
1) Application scope
Test is used to simulate stacking conditions for product in ware house.
2) Test condition
Place the product in chamber @40deg 90% RH for 168 hrs, put the packed machine on the centre
of bottom pallet as shown in below figure and apply the calculated load which is equal to load of
same packed product.
(Weight)
Pallet
Packed
Product
Stack test
61
LG(61) Design 060 A4 (950225) LG Electronics
Confidential
Date : 15-Aug-2012
R&D Refrigerator
Compulsion 14. Do new development parts satisfy EU RoHS Directive PBB inclusion
standard?
EU Within 1000
All parts
standard ppm
Compulsion 17. Do parts that exceed LG Electronics standard make out or receive and are
keeping an improvement plan?
Compulsion 18. Do parts that exceed EU RoHS Directive standard make out or receive and
are keeping an improvement plan?
Compulsion 2. Did you mark quality of the material according to ISO11469 about plastic
parts more than 25g?
Indication
example >ABS<, >PC+ABS<
Advice 3. Are discernment and access available at a look in case recycling material
and parts disjoint Cover of product?
Advice 4. Recycling material and parts are Wire connection, Snap fit that resolving time
is less, or did you use conclusion method such as Screw?
Advice 7. Pretreatment material and parts are Wire connection, Snap fit that resolving
time is less, or used conclusion method such as Screw
Advice 10. Did plastic parts more than 100g use thermo plasticity resin?
Advice 11. Do parts of Stainless steel quality of the material that is used to product
adhere to magnet?
Compulsion 2. Did EU direction house brand product insert about Mark that prescribe in
WEEE Directive to user manual?
3F Evaluation Standard
Date : 15-Aug-2012
R&D Refrigerator