Professional Documents
Culture Documents
PLP-200-056-0005
+
Checking @ Hatch
• PLP-200-056-0005
• PLP-200-056-0005-Infra
Purpose (cont’d)
• Quality
• Reputation
• Record of compliance with corporate quality management
practices
• Verifiable by independent (or internal) audit
• PLP Procedure updates are pending, but fundamentals will
remain the same.
Checking Fundamentals
CHECKING ROLES:
Everyone @ Hatch is Originator – Individual responsible for a
approval.
submission. Responsible to ensure
checks are performed.
Checking Fundamentals
Independent Checks The Checker and Originator cannot be the same person.
Consistent Application All deliverable revisions checked with the same process.
Checking
Workflow Originator Originator Checker Originator Checker Approver
Prepare drawing
R A I I
checking package
Assign Checkers I R I I
Check and
A R
back- check drafting
Perform Engineering
A R
check of drawings
Make corrections and
R
self-check
Maintain document
history file including R A
check prints
Confirm
Independent Check Checker Correct Yellow
correct
Identify as
Independent Check Checker Incorrect Red
incorrect
Confirm
Corrections Originator Corrected Green
corrected
Independent Verify
Checker Accepted Blue
Backcheck corrected
Independent Verify
Checker Rejected Red
Backcheck incorrect
Drawing Checking Package
Step 1 Responsible Designer
Prepares Checking Package:
Step 2
• History File Face Sheet
Step 3 • Checking Coordination Sheet
Step 5
Step 6
John Smith JSmith Jan 1, 2012
Step 7
Drawing Checking Package
Step 1 Checker
Completes Check:
Step 2
• Format, Input, Content
Step 3 • Drafting Check
Step 7
Drawing Checking Package
Step 1 Responsible Engineer
Step 2 • Ensures Engineering requirements
Step 6
John Smith JSmith Jan 1, 2012
Jane Doe JDoe Jan 2, 2012
Step 7
Drawing Checking Package
Step 1 Lead Discipline Engineer
Step 2 • Ensure Project Requirements are
met
Step 3
• Reviews Comments and
Step 4
Corrections
Step 5
• Indicate if Internal Review
Step 6
Required
John Smith JSmith Jan 1, 2012
BJones
Drawing Checking Package
Step 1 Originator
BJones
Drawing Checking Package
Step 1 Checker
Step 2 Back-check Drawing
• Verification that requested changes
Step 3
were made appropriately
Step 4
• Not used as a further check-print
Step 5
• Sign Check-Print Stamp
Step 6
John Smith JSmith Jan 1, 2012
Jane Do JDoe Jan 2, 2012
Step 7 Bob Jones BJones Jan 2, 2012
Jerry John JJohn Jan 2, 2012
eJohn Smith JSmith Jan 3, 2012
BJones
Drawing Checking Package
Step 1 Responsible Designer
Step 2 Update History File
Step 3
Checklists
Reference…
Step 5
Reference…
Step 6 Cover
Sheet
Step 7
Document Checking - Roles and Responsibilities
Roles and Responsibilities (Documents)
Responsible Lead Discipline Document
Key Activity Originator
Engineer Engineer Checker
Apply this Procedure R A R R
Prepare document checking package
R A
and coordinate checking process
Assign Checkers I R I
Check and
A R
back- check document
Input
‒ General engineering design practice
‒ Applicable Codes & Standards
‒ Discipline data, design criteria, lists,
Color Codes
PLP DIGITAL CHECKING
Step Responsibility Action Status Colour
Confirm
Independent Check Checker Correct Yellow
correct
Identify as
Independent Check Checker Incorrect Red
incorrect
Confirm
Corrections Originator Corrected Green
corrected
Independent Verify
Checker Accepted Blue
Backcheck corrected
Independent Verify
Checker Rejected Red
Backcheck incorrect
Document Checking Package
Step 1 Responsible Engineer
• Prepare Package
Step 2
• Input and Criteria must be clearly
Step 3 stated
• Check Print Stamp
Step 4
Step 5
Step 6
Document Checking Package
Step 1 Checker
Step 2 Completes Check:
Step 3 • Format, Input, Content
Step 4 • Signs Check-Print Stamp (hard
Step 5 copy)
John Smith JSmith Jan 1, 2012
Step 6 Jane Doe JDoe Jan 2, 2012
Document Checking Package
Step 1 Lead Discipline Engineer
Step 2 • Reviews Comments and
Step 3 Corrections
Step 5 Required
Step 6
• Signs Check-Print Stamp
John Smith JSmith Jan 1, 2012
Jane Doe JDoe Jan 2, 2012
Bob Jones BJones Jan 2, 2012
BJones
Document Checking Package
Step 1 Originator/Responsible Engineer
BJones
Document Checking Package
Step 1 Checker
BJones
Document Checking Package
Step 1 Responsible Engineer
Step 2 • Update File
Step 3 - Hard Copy (Project
Step 4 Discipline Files)
Step 6
Digital Tools
‒ Tool: Bluebeam
‒ Format: .pdf
‒ Methodology:
1. Checker adds markups and
comments.
2. Originator corrects markups and
addresses comments
3. Checker verifies markup correction
‒ Procedures:
‒ Digital Checking of Documents & Draw
ings (.pdf)
Digital Checking of Documents & Drawings (Brava)
‒ Tool: Brava
‒ Format: .pdf
‒ Methodology:
1. Checker adds markups and
comments.
2. Originator corrects markups and
addresses comments
3. Checker verifies markup correction
‒ Procedures:
‒ User Guide – Brava Markup Tool
Digital Checking of Calculations & Data (.pdf)
‒ Tool: Bluebeam
‒ Format: .pdf
‒ Methodology:
1. Originator converts calculations &
tabular data (i.e. MTO) into a pdf which
is checked as a document
‒ Procedures:
‒ Digital Check of Documents & Drawings
(.pdf)
Collaborative Checking (pdf)
ideal for multi-party discipline, inter-discipline &
‒ Tool: Bluebeam Studio external (client) checks/reviews
‒ Format: .pdf
‒ Methodology:
1. Originator (or delegate) uploads files to be
checked to an “online review session”
2. Multiple Checkers markup
documents/drawings in parallel
3. Originator (or delegate) downloads checked
files to Electronic Document Management
System for quality records
‒ Procedures:
‒ Studio Basics & Log In (video tutorial)
‒ Studio Sessions (video tutorial)
collaborate in real time with any number
of participants (internal & external)
Digital Checking of Models (.i.dgn, .nwf)
‒ Tool: Navigator / Navisworks
‒ Format: .i.dgn, .nwf
‒ Methodology:
1. Models are checked digitally through a
variety of means (i.e. clash detection, red
lining)
‒ Procedures:
‒ Practice & Discipline Procedures
‒ Project Specific Procedures
‒ Sample Procedures
‒ Check Structural Steel Models
Digital Checking of Analytical Models
‒ Tool: Analytical Modelling Tools (various)
‒ Format: Native Format (or .pdf)
‒ Methodology:
1. Checker to verify input (through original input, notes in Word
document or pdf of the input)
a. Create status list for corrections to be made
2. Checker to verify acceptability of output (through original
output or pdf of the output)
3. Originator to combine input and output verification notes into a
single markup document
4. Originator to review and disposition the markups
5. Checker to verify that markups have been properly addressed
‒ Procedures:
‒ Digital Checking of Documents (.docx)
‒ Digital Checking of Documents & Drawings (.pdf)
Quality Records
‒ Tool: iPas DM or ProjectWise (EDMS)
‒ Format: All
‒ Methodology:
1. Records of checking (files) must be stored in an
Electronic Document Management System (EDMS)
as evidence a quality check was performed
2. ProjectWise can use built-in status features
(Dwg_Check, Dwg_Release) for markups, and
version control for checks of subsequent revisions
Reach out to local Document Control Corporate SharePoint & Teams is not
teams for assistance in storing project acceptable for project data storage
records
Resources
• For Questions?
• Project Lead Discipline Engineer
• Office Discipline Engineer
• Project Engineering Manager
• Quality Manager
• Hatch PLP Engineering Coordinator
• Virtual Collaboration and Checking Presentation
• Procedures
• InsideHatch->PLP icon ->Documentation ->Procedures and other documents ->
Engineering
• PLP-200-056-0005 ( Check Engineering Documents)
• Delivery Knowledge Portal (Bluebeam)
Questions