Professional Documents
Culture Documents
02 W4ControlPlans
02 W4ControlPlans
Measure
Characterization
Analyze
Breakthrough
Strategy
Improve
Optimization
Used to ensure that
Control gains are achieved
and sustained.
KPOV KPIVs
Monitor Control
• Control charts
• Error proofing
• Standard Operating Procedures
• Measurement System Analysis
• Preventative Maintenance
Instructions
Operational
Poka - Yoke
Instructions
Written
Verbal
Method
P DFSS
Sheets
(OMS)
SPC
Amount of Control
Process Charateristic/ CTQ/CL Specification Mesurement Sample Frequency Who Where Decision Reference
Step Parameter Requirement Method Size Mesures Recorded Rules Number
Corrective
Action
Purchase Time of CTD Customer Access All All Buyer Access 1.Review
Order Entry Order entry Database entered entered Database Reason for
to PO less server time Length (eg.
than 3 days stamp Weekend,
error) and
determine
need for
problem
solve
Process Charateristic/ CTQ/CL Specification Mesurement Sample Frequency Who Where Decision Reference
Step Parameter Requirement Method Size Mesures Recorded Rules Number
Corrective
Action
Purchase Time of CTD Customer Access All All Buyer Access 1.Review
Order Entry Order entry Database entered entered Database Reason for
to PO less server time Length (eg.
than 3 days stamp Weekend,
error) and
determine
need for
problem
solve
Process Charateristic/ CTQ/CL Specification Mesurement Sample Frequency Who Where Decision Reference
Step Parameter Requirement Method Size Mesures Recorded Rules Number
Corrective
Action
Purchase Time of CTD Customer Access All All Buyer Access 1.Review
Order Entry Order entry Database entered entered Database Reason for
to PO less server time Length (eg.
than 3 days stamp Weekend,
error) and
determine
need for
problem
solve
Process Charateristic/ CTQ/CL Specification Mesurement Sample Frequency Who Where Decision Reference
Step Parameter Requirement Method Size Mesures Recorded Rules Number
Corrective
Action
Purchase Time of CTD Customer Access All All Buyer Access 1.Review
Order Entry Order entry Database entered entered Database Reason for
to PO less server time Length (eg.
than 3 days stamp Weekend,
error) and
determine
need for
problem
solve
Process Characteristi CTQ/CL Specification Measureme Sample Frequency Who Where Decision Reference
Step c/ Parameter Requirement nt Method Size Measure Recorded Rules Number
s Corrective
Action
Purchase Time of CTD Customer Access All All Buyer Access 1.Review
Order Entry Order entry Database entered entered Database Reason for
to PO less server time Length (eg.
than 3 days stamp Weekend,
error) and
determine
need for
problem
solve
Process Charateristic/ CTQ/CL Specification Mesurement Sample Frequency Who Where Decision Reference
Step Parameter Requirement Method Size Measure Recorded Rules Number
s Corrective
Action
Purchase Time of CTD Customer Access All All Buyer Access 1.Review
Order Entry Order entry Database entered entered Database Reason for
to PO less server time Length (eg.
than 3 days stamp Weekend,
error) and
determine
need for
problem
solve
If out of control
condition appears,
100% inspect all
Injection
parts since last
Molding Y : Part 3.250 + 0.005 in. X Bar & R
CTQ Gage # 042 5 Each hour Operator check. If X Bar out-of
(Machine Dimension Cpk=2 Chart
control, adjust
# 16)
injection pressure. If
R out-of –control,
adjust coolant flows.
If out-of-control
condition appears,
Pressure X Bar & R
X : Cavity 1200 + 15 psi (automatic, check: Injection
“ Pressure
CTQ
Cpk = 2
transducer in 5
continuous reading)
(automatic,
pressure settings;
cavity on monitor)
Temperature
controller.
If flow in yellow,
adjust to green. If
Check
X : Coolant Flow meter on flow in red, 100%
“ Flow
CTQ 5 gal / minute
machine
1 Each hour Operator Sheet by
inspect all parts since
Machine
last check, and adjust
flow to green.