increasing the cost of poor quality. Total lose of Improve 29/05/13 1/06/13
money by rejected parts has gone up to Control 10/06/13 12/06/13
Rs.14500000 in just 5 months.
Goal Statement:
Reduce the distortion value of the component upto
0.6mm by 10-Jun-13.
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R ARMI AND COMMUNICATION PLAN
Key ARMI Worksheet
Stakeholders Define Measure Analyze Improve Control
Plant Manager I I I I I
Production Head I I I I I
Production Mgr. I&A I&A I&A I&A I&A
Sr. Mgr. QA/PI A&I A&I A&I A&I A&I
BB I&M I&M I&M I&M I&M
Model Incharge I&R I&R I&R I&R I&R
Line Supervisors R&M R&M R&M R&M R&M
Team Members M M M M M
Communication Plan
Information Or Activity Target Audience Information Channel Who When
Project Status Leadership E-mails Mahesh BI-Weekly
Tollgate Review BB,LBB,MBB & E-mails or Meetings Mahesh As per Project Plan
Champion
Project Deliverables or Members Emails, Meetings Mahesh Weekly
Activities
RASIC
MACHINING REJECTION OF
Tm case YC5 R
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R SIPOC
INGOTS - ADC12
Melting
RAW Casting
Distortion The difference of the If the distortion or Distortion value must LSL= 0, Per Part
in Tm case min. and max. plan at bending value is be under 0.6mm
YC5 R fix die face of tm case 0.6mm or more, it is USL= 0.6mm
YC5 R is Distortion or defect.
comp. bending value.
RULES
1.Contribution of Gage R&R should be less then Part-to-Part.
2.Percentage contribution of Gauge R&R against Equipment Tol.
i)Less than 10%- Good
ii)Between 10% to 30 %- OK, Proceed with Caution.
iii)Greater than 30%- Reject.
3. Numbers of distinct categories should be equal or greater than 4.
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R Gauge R&R for Height Gauge
RESULT
RULES
1.Contribution of Gage R&R should be less then Part-to-Part.
2.Percentage contribution of Gauge R&R against Equipment Tol.
i)Less than 10%- Good
ii)Between 10% to 30 %- OK, Proceed with Caution.
iii)Greater than 30%- Reject.
3. Numbers of distinct categories should be equal or greater than 4.
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R Gauge R&R for CMM
RESULT
RULES
1.Contribution of Gage R&R should be less then Part-to-Part.
2.Percentage contribution of Gauge R&R against Equipment Tol.
i)Less than 10%- Good
ii)Between 10% to 30 %- OK, Proceed with Caution.
iii)Greater than 30%- Reject.
3. Numbers of distinct categories should be equal or greater than 4.
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R
ACCURACY CALCULATION FOR MEASURING
INSTRIMENTS
ACCURACY CALCULATION FOR MEASURING INSTRUMENTS. RESULT
Data Type is Non-Normal (p-Value<0.005), Hence Measure for centre tendency in Median which is: 0.487
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R Data behavior analysis
P-value = 0.036, alternate hypothesis, but Regression R-Sq=0.9% means a very weak relation, hence there is no
impact of operators age on distortion.
PROJECT: REDUCE
MACHINING REJECTION OF Correlation test for Distortion and Operator
Tm case YC5 R
Experience.
Y TYPE X (MAN) TYPE TEST TO BE DONE
OPERAOR DISC. Leven's
AGE CONT. Correlation & Regression
DISTORTION CONTINUOUS & NOT NORMAL EXPERIENCE CONT. Correlation & Regression
SUPERVISOR DISC. Leven's
SKILL SCORE DISC. Leven's
P-value = 0.00, alternate hypothesis, but Regression R-Sq=2.5% means a very weak relation, hence there is no impact of
operators experience on distortion.
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R
Test of Equal Variance for
Supervisor
Y TYPE X (MAN) TYPE TEST TO BE DONE
OPERAOR DISC. Leven's
AGE CONT. Correlation & Regression
DISTORTION CONTINUOUS & NOT NORMAL EXPERIENCE CONT. Correlation & Regression
SUPERVISOR DISC. Leven's
SKILL SCORE DISC. Leven's
P-value = 0.197, null hypothesis, means there is no impact of Operator’s Skills on distortion.
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R
Correlation Regression testing for Distortion and
Die Temp.
Y TYPE X (MACHINE) TYPE TEST TO BE DONE
DIE TEMP. CONT. Correlation & Regression
CONTINUOUS & NOT CASTING PRESSURE CONT. Correlation & Regression
DISTORTION
NORMAL METAL TEMP. CONT. Correlation & Regression
COOLING TIME CONT. Correlation & Regression
P-value = 0.00, alternate hypothesis, and Regression R- Test shows that Die temp. has significant impact
Sq=71.5% means a very strong impact, and pearson on component distortion, with Scatter plot We
correlation=0.846 shows a positive relation. can see all parts produced with 200~210.C of die
temp. have distortion value under 0.6mm.
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R
Correlation Regression testing for Distortion and
Casting Pressure.
Y TYPE X (MACHINE) TYPE TEST TO BE DONE
DIE TEMP. CONT. Correlation & Regression
CONTINUOUS & NOT CASTING PRESSURE CONT. Correlation & Regression
DISTORTION
NORMAL METAL TEMP. CONT. Correlation & Regression
COOLING TIME CONT. Correlation & Regression
Correlations: DISTORTION, CASTING PRESSURE
P-value = 0.187, Null hypothesis, hence there is no impact of Gate cutting method on Distortion..
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R Test of Equal Variance for Si% in Material
Y TYPE X (MATERIAL) TYPE TEST TO BE DONE
Si% DISC. Leven's
CONTINUOUS & NOT
DISTORTION Fe% DISC. Leven's
NORMAL
Cu% DISC. Leven's
Bartlett's Test
10.0~10.5 Test Statistic 241.09
P-Value 0.000
Levene's Test
Test Statistic 97.64
10.5~11
Si% (10%~12%)
P-Value 0.000
11.0~11.5
11.5~12
11.56
Bartlett's Test
P-Value 0.683
0.75~0.8
0.8~0.85
0.85~0.9
Bartlett's Test
P-Value 0.350
0.25~0.3
0.3~0.35
0.35~0.4
0.18 0.19 0.20 0.21 0.22 0.23 0.24 0.25 0.26 0.27
95% Bonferroni Confidence Intervals for StDevs
CONTINUOUS & NOT CASTING PRESSURE CONT. Correlation & Regression NULL
DISTORTION
NORMAL
METAL TEMP. CONT. Correlation & Regression NULL
COOLING TIME CONT. Correlation & Regression ALTERNATE
Y TYPE X (METHODS) TYPE TEST TO BE DONE HYPOTHYSIS REMARKS
CONTINUOUS & NOT
DISTORTION METHODS (1,2,3,4) DISC. Leven's NULL
NORMAL
Y TYPE X (MATERIAL) TYPE TEST DONE HYPOTHYSIS REMARKS
Si% DISC. Leven's ALTERNATE
CONTINUOUS & NOT
DISTORTION Fe% DISC. Leven's NULL
NORMAL
Cu% DISC. Leven's NULL
Y TYPE X (ENVIRONMENT) TYPE TEST DONE HYPOTHYSIS
REMARKS
CONTINUOUS & NOT PLANT TEMP. CONT. Correlation & Regression NULL
DISTORTION
NORMAL SHIFT CONT. Correlation & Regression NULL
Y TYPE X (MEASUREMENT) TYPE TEST DONE HYPOTHYSIS
REMARKS
INSPECTOR DISC. Leven's NULL
CONTINUOUS & NOT ROOM TEMP. CONT. Correlation & Regression NULL
DISTORTION
NORMAL
GAUGE/
DISC. Leven's NULL
INSTRUMENT
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R QFD chart for controlling Distortion
TO CONTROL DISTORTION
Controlling of monitoring of
1 Cooling Water Malfunction of Cooling Distortion and scoring
7 4 5 140 Reduce thermocouple condition P.E 5/6/2013 10/6/2013
Temp. unit in comp.
weekly.
Variation in comp.
Dirty cooling water 7 2 5 70 Reduce Weekly audit by prod. Mgr. Prod. 3/6/2013 5/6/2013
distortion
Chemical
reagent for
rusting of cooling pipes,
improving
5 or reaction with copper cooling pipes leakage 4 1 7 28 Accept
cooling
cooling pipes
efficiency of
water
changing limit
of Si, from Inspection error on
6 Distortion in comp. 7 2 5 70
10%~12% to Spectrometer
11.3% to 12% Verification and
comparison of Spectro
Reduce Q.C 3/6/2013 5/6/2013
primary sample in every A
checking shift starting
Composition
Inspection error on
7 of material Distortion in comp. 7 2 5 70
Spectrometer
after every
heat loading
thermo couple
for water Thermo couple
8 Water temp. variation 3 3 2 18 Accept
temp. malfunction
monitoring
Die temp.
Thermo couple
9 indicator wrong monitoring 2 2 2 8 Accept
malfunction
installation
periodic
10 inspection for Operator error Wrong monitoring 2 2 2 8 Accept
Die Temp.
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R I-MR Chart for Pre & Post Improvement Distortion Data
PRE- IMPROVEMENT
POST IMPROVEMENT
PROJECT: REDUCE
MACHINING REJECTION OF
Tm case YC5 R Graphical Summary of Pre & Post Improvement