Fire Sprinkler Contractor: BIM Collaboration & Validation
Fire Sprinkler Contractor: BIM Collaboration & Validation
NEHA BISHT
Subject matter Expert
• Installation Errors
• Clash with other trades on Site
• Material Wastage
• Revisions made upon Design change
• Create Record drawing
Workflow of a Fire System
Preliminary fire
system layout to Structural engineer Identify the clash
Proposed Design addresses weight
drawings begin the occurring with other
coordination loads for hanging trades
process piping system
• Better communication of fire system design with improved accuracy & multi
trade coordination.
• Collision detection during the project design and construction phase Inspection
of sprinkler system, fire pump and water flow
• Automated system for riser diagram preparation & fire management using Revit
• Quantity take-off & BOQ
• Design Validation Record Drawings creation
Solution
• Better communication of fire system design with improved accuracy & multi
trade coordination.
• Collision detection during the project design and construction phase Inspection
of sprinkler system, fire pump and water flow
• Automated system for riser diagram preparation & fire management using Revit
• Quantity take-off & BOQ
• Design Validation Record Drawings creation
BIM Approach
• Designing the fire system in Revit collaborating with the other trades
(Plumbing and Structural team).
• http://www.aga-cad.com/blog/what-every-mep-engineer-and-bim-professi
onal-should-know-about-fire-sprinkler-system-design
• https://www.linkedin.com/learning/search?keywords=fire%20protection%2
0revit&u=2199673
References
• https://medium.com/@PinnacleInfotechcad/get-fire-protection-engineerin
g-through-building-information-modeling-461d6644a4a9
• https://sprinklerage.com/bim-and-the-fire-sprinkler-industry/
• http://www.aga-cad.com/blog/what-every-mep-engineer-and-bim-professi
onal-should-know-about-fire-sprinkler-system-design