Professional Documents
Culture Documents
Basic Steps On Vlan Creation and Troubleshooting 1
Basic Steps On Vlan Creation and Troubleshooting 1
This sheet is to know the basic steps for This to help us to understand the process and
configuring Vlan’s. there for to give us a proper understanding of
Do not try to commit those steps without the overall operation.
support of BO colleague . This will help us to indicate missing steps to
minimize the time of troubleshooting with BO
Team.
Is to create subnetwork which group together We configure vlan’s on the MPBN side, CX
collections of devices on separate physical side ,TN/RTN side.
local area network. If vlan is not configured on above mentioned
Vlan is important because they can help side’s then site’s wont be able to be on air ,
improve the overall performance of a network due to lack on Data Link Layer
by grouping together devices that
communicate most frequently (Cluster site’s
of 2G,3G,4G)
4/30/2020
Munzir Yousif Hamid
Page 2
To check there is no conflict on the Vlan:
Command:
dis ip route vpn-instanceIub10.XX.XX.XX
Vpn-instanceIub, for 3G and 4G:
First step :
Enter the system mode on the CX:
By command : sys
4/30/2020
Munzir Yousif Hamid
Page 4
Vlan Configuration on CX Side:
If all that has been field then TX side is okay. For conflict E-node B ID on script:
The problem might lay on site Script : We shall need support from PS Team or Fo
*conflict E-node B ID on script.(MME not Team.
reachable) There would be 2 E-nodeB with the the same
*Wrong Vlan ID on script . E-nodeB ID
Should check Vlan on Hub TN if not ticked. As an alarm triggered on PS filter as below
slide:
Investigation:
The routing of VLAN needs insure of IP
routing from MPBN and IPRAN side .
MPBN did their part but no verification as the
VLAN not passed at that time.
In the activity of VLAN has been done one by
one but no verification due to many VLAN
creation more than 30 VLAN .
The issue that some LTE sites O&M not
reachable.
the improvement action suggestions. Traffic reachability test from the last router to
The number of passed VLANs per night the MME node.
should not exceed 15 VLAN to allow doing Close the CR after activity finish immediately
two ping test per VLAN without exceed to allow verification of the log by the activity
maintenance window( Traffic reachability and creator on the next day . (big Gap here)
O&M reachability).
O&M reachability test from the IT NW to the
router .
Thanks
4/30/2020
Munzir Yousif Hamid Page 20