You are on page 1of 33

HIGH RISE RESIDENTIAL

CONSTRUCTION TECHNIQUES
• Prefabrication (Off-site Robotics)
• On-site Automation (On-site Robotics)
• Single Task Robots (On-site Robotics)
• Building Information Model (BIM)
Floor layout showing the location of precast elements
North Elevation of block
design
With proper jointing ,the need for external scaffolding system was eliminated
Isometric view of precast components used
Recesses incorporated in precast
wall to conceal M&E services at
later stage
Precast balcony ,precast staircase and landing
THE CONSTRUCTION CYCLE
The construction cycle achieved was about 8 days per floor. The typical floor cycle
of construction involved was as follows:
VERTICAL COMPONENT INSTALLATION
(SETTING OUT )
LIFTING AND INSTALLING
GROUTING – NON-SHRINK
MORTAR
VERTICAL JOINT CASTING AND SEALING
INSTALLATION OF PRECAST BEAM
INSTALLATION OF PRECAST SLAB
CASTING OF IN-SITU JOINT BETWEEN
PRECAST BEAM AND SLAB
PREPARATION WORK BEFORE INSTALLATION
PANEL LIFTING AND FIXING
CASTING OF JOINT

You might also like