FLAC3D 程式學習

參考手冊: Fast Lagrangian Analysis of Continua


in 3 Dimensions
章節: Section 1 : Introduction & Section 2 : Getting Started
手冊頁碼: 1-1~1-22, 2-1~2-20
簡報內容: 1. 模型建立程序及展示

1
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
First step :
• gen zone brick size 6 8 8
• plot create Trench
• plot add surface yellow
• plot add axes black
• plot show

2
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
First step :
• gen zone brick size 6 8 8
• plot create Trench
• plot add surface yellow
• plot add axes black
• plot show

3
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
Second step :
• model mohr
• prop bulk 1e8 shear 0.3e8 fric 35
• prop coh 1e10 tens 1e10
• set grav 0 0 -9.81
• ini dens 1000
• fix x range x -0.1 0.1
• fix x range x 5.9 6.1
• fix y range y -0.1 0.1
• fix y range y 7.9 8.1
• fix z range z -0.1 0.1
• hist n 5
• hist unbal
• hist gp zdisp 4 4 8
• set mech force 50
• solve

4
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
Second step : hist1-(the maximum unbalanced force)

model mohr
prop bulk 1e8 shear 0.3e8 fric 35
prop coh 1e10 tens 1e10
set grav 0 0 -9.81
ini dens 1000
fix x range x -0.1 0.1
fix x range x 5.9 6.1
fix y range y -0.1 0.1
fix y range y 7.9 8.1
fix z range z -0.1 0.1
hist n 5
hist unbal
hist gp zdisp 4 4 8
set mech force 50

5
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass. Second step : hist2-
(the z-displacement at gridpoint (x = 4, y =4, z = 8))

6
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The third step :
• plot create GravV
• plot set plane dip=90 dd=0 origin=3,4,0
• plot set rot 15 0 20
• plot set center 2.5 4.2 4.0
• plot add bound behind
• plot add bcont szz plane
• plot add axes
• plot show

7
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The third step :
• plot create GravV
• plot set plane dip=90 dd=0 origin=3,4,0
• plot set rot 15 0 20
• plot set center 2.5 4.2 4.0
• plot add bound behind
• plot add bcont szz plane
• plot add axes
• plot show

8
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The fourth step :
• prop coh 1e3 tens 1e3
• model null range x 2 4 y 2 6 z 5 10

9
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The fourth step :
• prop coh 1e3 tens 1e3
• model null range x 2 4 y 2 6 z 5 10

10
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The fourth step :
• prop coh 1e3 tens 1e3
• model null range x 2 4 y 2 6 z 5 10
• set large
• ini xdis 0 ydis 0 zdis 0
• step 2000

11
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The fourth step :
• prop coh 1e3 tens 1e3
• model null range x 2 4 y 2 6 z 5 10
• set large
• ini xdis 0 ydis 0 zdis 0
• step 2000

12
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The fourth step :
• prop coh 1e3 tens 1e3
• model null range x 2 4 y 2 6 z 5 10
• set large
• ini xdis 0 ydis 0 zdis 0
• step 2000
• plot create DispCont
• plot copy GravV DispCont settings
• plot add cont disp plane behind shade on
• plot add axes
• plot show

13
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The fourth step :
• prop coh 1e3 tens 1e3
• model null range x 2 4 y 2 6 z 5 10
• set large
• ini xdis 0 ydis 0 zdis 0
• step 2000
• plot create DispCont
• plot copy GravV DispCont settings
• plot add cont disp plane behind shade on
• plot add axes
• plot show

14
FLAC3D 程式學習
EX1: A 2 m × 4 m trench excavated to a depth of 4 m in a soil
mass.
The fourth step :
• prop coh 1e3 tens 1e3
• model null range x 2 4 y 2 6 z 5 10
• set large
• ini xdis 0 ydis 0 zdis 0
• step 2000
• plot create DispCont
• plot copy GravV DispCont settings
• plot add cont disp plane behind shade on
• plot add axes
• plot show

15
Thanks for listening!