Professional Documents
Culture Documents
By
MANJUNATHA HALEGOUDAR
BE(Mech),MBA(Finance), BOE, CEA.
Assistant Executive Engineer
BEE Certified Energy Auditor
PROCESS FLOW CHART OF FLUID AT RTPS
LP BYPASS
o
36 ksc 540 C HRH 49o C 0.1 ksc
O
19 ksc
C
8 ksc 10 ksc 14 ksc 17 ksc
D/A
DEAERATOR LPH-3 LPH-2 LPH-1 Drain Cooler
EXT 120o C 90o C 56o C 47o C
from APRDS
COLOUR CODE
STEAM
CONDENSATE
FEED WATER
UNIT START UPS
COLD STATRT UP
WARM STATRT UP
HOT STATRT UP
1. Preparation.
2. Start Up of Turbo Generator.
3. Pre Light Up Activities.
4. Boiler Light Up and Pressure Raising.
5. Steam Admission to Turbine and Rolling,
ACTIVITIES
• Charge Generator seal oïl system.
• Generator Hydrogen filling.
• Open Gate Valve Gearing
U
P Operation Procedures. Manjunath H 12
COLD START UP
4. Boiler Light Up and Pressure Raising
• Charge HP Heaters.
• Cut in Mill D
• Raise the Unit load to 180 MW.
• Cut out Oil Support
• Cut in Mill E
• Raise the Unit load to 210 MW.