You are on page 1of 42

Substation REB 670

Automation Products Bus protection


Training
ABB Power Technologies AB, 2005
©

2006-03-30 Substation Automation Products Training


1
Application Areas for REB 670

 Differential, BFP & Non-Dir


OC Protection for:

 Busbars
 Meshed corners,
 T-protection
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

2
REB 670*1.0 … Available Versions

 3-Phase Version
 Two measuring zones
 BFP, OC, EnFP & AR
 4 or 8 bays

 1-Phase Version
 One IED per phase
 Two measuring zones
 BFP, OC, EnFP & AR
 12 or 24 bays
ABB Power Technologies AB, 2005

 Summation type available

2006-03-30 Substation Automation Products Training


©

3
REB 670*1.0 Proposed Variants
   
 
 
 
 
 
 
12I + max 3*IO Cards 12I/24I + max 11*IO Cards

Used for small, fixed zones like


3Ph, 4 bays, 2 zone Not Applicable
T protection, meshed corner,
BFP & OC protection optional!
ring bus etc.
A20

3Ph, 8 bays, 2 zone Not Applicable Used for substations/zones


BFP & OC protection optional! with up to 8 CT inputs.
A31

Used for substation with up to


Used for substation with up to
12 CT inputs. Only three IO
1Ph, 12 bays, 2 zone 12 CT inputs.
cards available. No extension
(three IEDs required) Possible to extend to 24 CT
possibilities to 24 CT inputs!
BFP & OC protection optional! inputs. Optional LDCMs can be
Good solution for stations with
used to share binary IO.
fixed zones (i.e. 1½ breaker).
B20 B21
ABB Power Technologies AB, 2005

1Ph, 24 bays, 2 zone Used for substation with up to


Not Applicable
(three IEDs required) 24 CT inputs. Optional LDCMs
BFP & OC protection optional! can be used to share binary IO.

2006-03-30 Substation Automation Products Training


B31
©

4
Three-Phase Terminal; 4/8 Bays- Double Zone

Application Areas:
 Smaller Buses (up to 8 CTs per zone)
REB 670; 3Ph  Single Busbar Stations (with Transfer Bus)
2 Zones (A & B);  1½ Breaker Stations
8 Bays
 Double Busbar Stations (with Transfer Bus)
 Zone Interconnection included in the design

No switching in CT secondary circuits


ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

7
REB 670 3- Ph; BBP, BFP & EnFP for single buses

ZA ZB
ZA

Single Busbar Single Bus with bus tie CB


up to 4/8 feeder bays up to 3/7 feeder bays on each side

ZA

ZA ZB

ZB

H type station with bus-section CB


or sectionalizing disconnector
ABB Power Technologies AB, 2005

T connections
Alternative CT Location

2006-03-30 Substation Automation Products Training


©

8
REB 670 3- Ph, BBP, BFP, EnFP for 1½ CB stations

ZA

ZB

1½ Breaker Stations
up to 4 diameters

ZA

.. .
ZB
ABB Power Technologies AB, 2005

1½ Breaker Stations
up to 8 diameters

2006-03-30 Substation Automation Products Training


©

9
REB 670 3- Ph; BBP, BFP & EnFP for Double CB stations

ZA

.. .

ZB

Double Breaker Station


up to 8 feeders

Alternative CT Location
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

10
REB 670 1- Ph; BBP, BFP & EnFP for double buses
ZA
.. .
ZB

Double Bus with bus-coupler CB


and up to 6/7 feeder bays

ZA
.. .
ZB
.. . Transfer Bay
Transfer Bus
.. . Isolator replica in REB 670*1.0
by CAP 531 Configuration
ABB Power Technologies AB, 2005

Double Busbars with bus coupler CB and Transfer Bus


up to 6/7 feeder bays

2006-03-30 Substation Automation Products Training


Optional Measuring Point
©

11
Single-Phase Terminal; 12/24 Bays- Double Zone
Application Areas:
 Bigger Buses (up to 12/24 bays per zone)
REB 670; Ph-L1
2 Zones (A & B);  Single Busbar Stations (with Transfer Bus)
24 Bays  1½ Breaker Stations
 Double Busbar Stations (with Transfer Bus)
REB 670; Ph-L2  Load Transfer is included into the design
2 Zones (A & B);  3 Terminals required for complete scheme
24 Bays  LDCM available to share binary IO

REB 670; Ph-L3 No switching in CT secondary circuits


2 Zones (A & B);
24 Bays
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

12
REB 670 1- Ph; BBP, BFP & EnFP for single buses

ZA
.. . ZA
.. . .. .
ZB

Single Bus
Single Bus with bus-section disconnector
up to 12/24 feeder bays
up to 12/24 feeder bays (i.e. 12+12; 16+8 etc.)

ZA ZB ZA ZB
.. . .. . .. . .. .

Single Bus with bus-section CB, up to


ABB Power Technologies AB, 2005

Single Bus with bus-section CB


11/23 feeder bays (i.e. 12+11; 10+13 etc.) up to 11/23 feeder bays on each side

2006-03-30 Substation Automation Products Training


©

13
REB 670 1- Ph; BBP applications for 1½ CB stations

ZA
ZA

.. . .. .
ZB
ZB
1½ Breaker Stations 1½ Breaker Stations
up to 6 / 12 diameters up to 12 / 24 diameters
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

14
REB 670 1- Ph, Complete BBP, BFP & EnFP for 1½ CB Stations!

ZA

.. .

ZB

Bus Diff, CB Fail & EnFP


1½ Breaker Stations
up to 4/8 diameters
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

15
REB 670 1- Ph; BBP, BFP & EnFP for Double CB stations

ZA ZA

.. . .. .
ZB ZB

Double Breaker Station Double Breaker Station


up to 6 / 12 feeders up to 12 / 24 feeders
Alternative CT Location
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

16
REB 670 1- Ph; BBP, BFP & EnFP for double buses

ZA
.. .
ZB

Double Bus with bus-coupler CB


up to 22/23 feeder bays
ABB Power Technologies AB, 2005

Isolator replica in REB 670*1.0


by CAP 531 Configuration

Optional Measuring Point


2006-03-30 Substation Automation Products Training
©

17
REB 670 1- Ph; BBP, BFP & EnFP for double bus & transfer

ZA
.. .
ZB
.. .
Transfer Bus
.. .
Combined Bus-Coupler
& Transfer Bay

ZA
.. . Bus-Coupler Bay
ZB
.. . Transfer Bay
Transfer Bus
.. .
Isolator replica in REB 670*1.0
ABB Power Technologies AB, 2005

by CAP 531 Configuration

Double Busbars with Transfer Bus


2006-03-30
up to 22/23 feeder bays
Substation Automation Products Training
©

18
REB 670 1- Ph; BBP, BFP & EnFP for double buses

Main 1 Main 2

.. . .. .
Reserve 1 Reserve 2

Four Zone Double Bus with two bus-coupler CBs and two
bus-section CBs and up to 20/21 feeder bays on each station side

Main 1 Main 2

.. . .. .
Reserve 1 Reserve 2
ABB Power Technologies AB, 2005

Four Zone Double Bus with two BC-CBs one BS-CB and one sectionalizing
disconnector with up to 18-20 feeder bays in the whole station

Optional Measuring Point


2006-03-30 Substation Automation Products Training
©

19
REB 670*1.0; 1-ph version Summation Principle

 Buses up to 24 bays per zone


REB 670; 1 Ph  Single Busbar
2 Zones (A & B);
 1½ Breaker Systems
24 Bays
 Double Busbar
 Same applications possible as for 1Ph solution
 Software Driven Zone Selection
+ N times  BFP ???
 OCP (EnFP) ???
 DR, ER, EL ???
Cost effective Solution
ABB Power Technologies AB, 2005

N 8

2006-03-30 Substation Automation Products Training


©

20
Features in REB 670*1.0

 Fast differential protection (12ms)


 Additional sensitive differential protection characteristic
 Smart open CT detection
 Check zone is available
 Id and Iin level supervision
 Zone selection for any arrangement (based on b- or a- & b contacts)
 Graphical configuration tool
 Integrated zone interconnection (i.e. Load transfer)
 Disconnector and/or CB position supervision & alarming
 CB Failure protection for every CT bay
 4-step backup overcurrent for every bay
ABB Power Technologies AB, 2005

 End fault protection by 4th overcurrent step


 Disturbance and event recorder

2006-03-30 Substation Automation Products Training


©

21
REB 670 Allocation of BBP Software Functionality

 Zone Selection  Differential Zones


 Dynamic Software CT switching  High speed tripping for internal
(i.e. no switching in CT secondary
circuits neither interposing CTs faults. Typical operating time 12
are required) ms
 Easy adaptation to different  Complete stability for through
substation layouts such as: single faults, with heavy CT saturation,
or double bus (with transfer bus), and a maximum remanence in the
one-and-half or double breaker, CT core at auto-reclosing
etc.
 Low CT requirement, only 2
 Simple adaptation to buses with milliseconds to saturation needed
only one set of CTs in the bus-
section or bus-coupler bays for correct operation
 Selective BBP & BFP tripping for  Intelligent detection for open or
every bay shorted CT secondary circuits and
settable blocking of differential
 Merging of the two differential
zones when required (i.e. during protection zone
ABB Power Technologies AB, 2005

load transfer in double busbar  Sensitive differential protection


stations) stage for power systems with
 Disconnector and/or circuit limited earth-fault current
breaker status supervision
2006-03-30 Substation Automation Products Training
©

22
Toll => PCM 600 for Whole 670 Series
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

23
PCM 600 => CAP 531 + SMT + PST
ABB Power Technologies AB, 2005

PST
2006-03-30 Substation Automation Products Training
©

24
What is done Where for BBP in REB 670

 CAP 531- Configuration  PST - Settings


 Determine Disconnector and  Fix CT inputs to one of the
CB positions via a&b contacts two zones
 Dynamic CT switching  Set Disconnector/CB behavior
software logic based on  Connect CTs to Check Zone
Disconnector and CB
positions  Set Diff Characteristics
 BFP & BBP Tripping Scheme  Set BFP pickup and time
delays
 EnFP Scheme and Tripping
 Set OC/EnFP and time delays
 Intertripping Scheme

 SMT
ABB Power Technologies AB, 2005

 Connect required number of bays to I/O modules included in REB 670

2006-03-30 Substation Automation Products Training


©

25
REB 670 BBP Software Structure / Function Blocks

 Zone Selection  Differential Zones


 Primary Switchgear Objects  Zone A
Status (i.e. disconnectors and (Id>, OCT, Sensitive Id>)
breakers)  Zone B
 Bay (Id>, OCT, Sensitive Id>)
(Interface towards one  Check Zone (Id>)
Primary Bay)
 Zone Interconnection
(Merging of two zones when
required)

One Basic
ABB Power Technologies AB, 2005

Function in AFL,
Hidden
connections exist

2006-03-30 Substation Automation Products Training


©

26
Principle Drawing for Double Bus-Single CB Station
Disconnector aux. contact timing
Zone A Main
Open Closed
Zone B contact
Aux. a
Open Closed
contact
ba Aux. b
Closed Open
contact
QB1

SSxx REB 670


DISABLE
CLOSED
NO CZ
OPEN ZB
NC
ALARM
ba
ZA
FORCED

QB2

SSxx
DISABLE Set Parameter
CLOSED
NO ZoneSel="CtrlIncludes"
OPEN
NC
ALARM
FORCED

BIM External or Internal


Feeder BFP Backup Bxxx
Trip Command
BLKTR TRIP
CTRLZA
Feeder Backup CONNZA
OC Trip CTRLZB
CONNZB

QA1 CT Input TRZONE


ABB Power Technologies AB, 2005

TRBAY
BI1
1200/1
A/D I3PB1
BOM
QB9
Other
Equipment TRM

Feeder Bay en06000XX01.vsd

BBP & BFP trip command to feeder breaker


2006-03-30 Substation Automation Products Training
©

27
Differential Protection in REB 670*1.0

 Very fast, minimum operating time 10 ms


 Extremely stable for external faults
 Completely phase segregated measurement
 Differential algorithm not dependent on the number of connected feeders
 Very low CT requirements, only 2 ms before CT saturation
 Any CT ratio difference can be accommodated
 Settings entered directly in primary amperes
Id [Primary Amps]

Operate
I in region
I d=
ABB Power Technologies AB, 2005

Differential protection
operation characteristic
Diff Oper Level
Sensitive Oper Level
s=0.53

Iin [Primary Amps]


2006-03-30 Substation Automation Products Training
©

28
Sensitive Differential Protection in REB 670*1.0

 Used in low impedance earthed power system or in other


special applications
 It has the following characteristics:
 Freely settable characteristic with time delay possibility
 Automatically blocked for heavy ph-to-ph faults
 External release via binary signal (i.e. from open delta
voltage, transformer neutral point current, etc.)
Id [Primary Amps]

Operate
I in region
I d=
ABB Power Technologies AB, 2005

Differential protection
operation characteristic
Diff Oper Level Sensitive
Sensitive Oper Level differential
s=0.53 protection

Iin [Primary Amps]


2006-03-30 Substation Automation Products Training
©

29 en04000260.vsd
Open CT detection for REB 670*1.0

 Slow and Fast Open CT detection (same as in RED 521*1.0)


 Settable influence of slow and fast open CT logic:
 Off (switched off)
 Block (Block diff protection, same as in RED 521*1.0)
 Supervise (Doesn't block, just increase minimum
differential operation level as shown below)
Id [Primary Amps]

Operate
I in region
I=
d OCT Logic Supervision Level
Differential protection
ABB Power Technologies AB, 2005

operation characteristic
Diff Oper Level Sensitive
Sensitive Oper Level differential
s=0.53 protection

Iin [Primary Amps]


en04000260.vsd
2006-03-30 Substation Automation Products Training
©

30
Check Zone in REB 670*1.0

 Independent check zone available


 Can be switched off (default setting)
 Freely settable which CT’s shall be connected to check zone
 Provide stability in case of problem with disconnector
auxiliary contacts ( stuck contacts or wiring problems)
Id [Primary Amps]

Operate
region
ABB Power Technologies AB, 2005

Oper Level
s=0.0-0.90 (settable)

Iout [Primary Amps]


2006-03-30 Substation Automation Products Training
©

31
Zone Supervision in REB 670*1.0

 Two new types of Diff Zone supervision are available


 Id> traditional supervision of differential current level
with settable time delay(i.e. can be used as alarm or for
automatic reset of OCT condition)

 Iin> incoming current supervision, without time delay


(i.e. can be used to trigger DR for external faults)
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

32
Disconnector/CB supervision & alarming

 For every disconnector/CB status is determined from the


status of aux contacts (i.e. a & b contacts)
 Two schemes available

 Position of a disconnector/CB can be forced to OPEN or


ABB Power Technologies AB, 2005

CLOSED by a parameter setting

2006-03-30 Substation Automation Products Training


©

33
User Friendliness in REB 670*1.0 (3-Ph & 1-Ph)

 Easy to set, configure, install & use


 Very easy to adapt to simple buses
 Pre-configured for most typical substation layouts

 Bay-Connections Matrix on built-in, front HMI with User


Settable Individual Bay Names
 Switchgear-Status Matrix on built-in, front HMI with
Settable Individual Primary Switchgear Object Names
 Visible User Defined Bay Names when setting change is
performed from the built-in, front HMI or PST
ABB Power Technologies AB, 2005

 Visible User Defined Switchgear Object Name when


setting change is performed from the built-in,
front HMI or PST
2006-03-30 Substation Automation Products Training
©

34
Bay-Connections & Switchgear-Status Matrices

User Internally Connections


Settable Used Bay to internal
ABB Power Technologies AB, 2005

Bay Name FB zones

User Settable Switchgear


Switchgear Object
Names Status
2006-03-30 Substation Automation Products Training
©

35
Available Configurations X01, X02 & X03

 X01: Just BBP for simple stations layouts (i.e. 1½ CB, Double
Breaker, Single Breaker, or for double busbar-single breaker stations
where Zone Selection is done by using just b contacts). Available for
all five versions A20, A31, B20, B21 & B31.
Direct replacement for RED 521*1.0
 X02: Just BBP for double busbar-single breaker stations where Zone
Selection is done by using a&b contacts from disconnectors and
breakers. Available for versions A31, B21 & B31
 X03: BBP with BFP, EnFP & OCP for double busbar-single breaker
stations where Zone Selection is done by using a&b contacts from
disconnectors and breakers. Available for versions A31, B21 & B31

 For other station layouts or functionality CAP 531 configuration shall


be arranged by the end user.
ABB Power Technologies AB, 2005

 Make available library of configurations for different station layouts?

2006-03-30 Substation Automation Products Training


©

36
Breaker Failure Protection (BFP)

 Complete CB failure protection within REB 670*1.0 with:


 1ph and/or 3ph starting
 Re-trip (i.e. first time delay)
 Backup trip / bus-trip (i.e. second time delay)
 Short reset time
 Trips correctly only associated CBs via busbar disconnector
replica available inside busbar differential protection

 Integrated station wide trip logic available from Zone Selection


ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

37
Phase Overcurrent function (TOC)

 Four, non-directional phase


overcurrent stages
IF  Each stage can be Definite- or
Inverse time delayed.
 19 IEC/ANSI curves
 Logarithmic inverse
3I>  Taylor made curve is available
 Each stage can be separately
4 blocked with second harmonic
 4th stage can be used for end fault
protection
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

38
End Fault Protection

CB=Clearing Boundary

CT=Measuring Boundary Busbar


Protection
Busbar
Protection

Feeder
Protection
Feeder
Protection

When feeder CB is Over-Trip


open, stop Zone
When feeder CB is
measuring open, extend
boundary at the measuring
open CB contacts Under-Trip
Zone boundary to the
ABB Power Technologies AB, 2005

in order to avoid open CB contacts


over-trip and in order to avoid
activate fast OC under-trip
protection to trip
remote end only
2006-03-30 Substation Automation Products Training
©

39
Autoreclosing Function (AR)

 Only used in certain markets in order to try to


re-energize the bus after BBP trip
 One AR function per Differential Zone is available
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

40
Disturbance and Event Recorder in REB 670*1.0

 Up to 40 recording channels!
 Sampling rate 20 samples per power system cycle
 Disturbance recording of all 24 analogue input channels
 Disturbance recording of all differential currents
 Disturbance recording of all incoming currents
 Up to 96 binary signals can be recorded as well
 DR file is saved in the terminal in COMTRADE format
 Last 30 recordings are stored in the terminal
 Each recording up to 6s long
 Internal even list with last 1000 binary events available in
ABB Power Technologies AB, 2005

the terminal

2006-03-30 Substation Automation Products Training


©

41
Communication
 Front connection:
 RJ45 Ethernet port

 Rear Communication
Optical :
 IEC61850
 IEC103
 SPA
 LON
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

42
Communication
Capabilities Designed for IEC 61850

Remote control (NCC)


MicroSCADA Pro
SMS & PCM
Station Via TCP/IP
Gateway WAN or modem

Utility LAN
TCP/IP
Station bus
Protection
IEC61850-8-1 Control Protection Protection Control
& Control
ABB Power Technologies AB, 2005

2006-03-30 Substation Automation Products Training


©

43

You might also like