DRILLING ENGINEERING I

GEOLOGY AND ANTICOLLISION


GEOLOGIC CONSIDERATIONS
Geologist must provide information about the following:
• Target and surface coordinates
• They are necessary to know from where the well begin and
when the drilling process should stop.
• Well planning begins with this information.
• Select the well profile.
• Stratigraphic column
• To know the type of lithology.
• Directional tendencies.
• Bit selection.
• Mud program elaboration.
GEOLOGIC CONSIDERATIONS
Target and surface coordinates
• Usually given in UTM coordinates and geographic coordinates
• UTM coordinates
Coordenadas de salida Target 1 Target 2
9910838.08 [mN] 9911633.67 [mN] 9911134.31 [mN]
290274.03 [mE] 291598.38 [mE] 291651.99 [mE]

• North coordinates are measured from Ecuador starting from 0


mN
• South coordinate are measured from Ecuador starting from
10000000 mN
• East coordinates are measured from the central meridian of each
zone, starting from 500000 m to west.
GEOLOGIC CONSIDERATIONS
• Geographic coordinates
• It uses angular coordinates, latitude and longitude.
• Latitude: north to south. Expressed in degree, minutes, seconds
starting from 0 degree at Ecuador to 90 degree at poles.
• Longitude: East to west. Expressed in degree, minutes, seconds
starting from 0 degree at Greenwich meridian to 180 degree to
east and west.
Grid Ea st Grid N orth Latitude Longitude
[m] [m]
S lot Location 290274.03 9910838.08 0°48'22.418" S 76°53'04.285" W
Facility R eference P t 290285.38 9910854.79 0°48'21.875" S 76°53'03.917" W
Field Re ference P t 290979.69 9920117.95 0°43'20.348" S 76°52'41.335" W

MD Inclination Azimuth TV D G rid E ast Grid N orth Latitude Longitude D LS V ert S ect C omments
[ft] [°] [°] [ft] [m] [m] [°/100ft] [ft]
0.00 0.00 68.50 0.00 290274.03 9910838.08 0°48'22. 418" S 76°53 '04.285" W 0.00 0.00  
36.00 0.00 68.50 36.00 290274.03 9910838.08 0°48'22. 418" S 76°53 '04.285" W 0.00 0.00 Tie On
2100.00 0.00 68.50 2100.00 290274.03 9910838.08 0° 48'22.418" S 76°53'04 .285" W 0.00 0.00 KOP
4350.00 36.00 68.50 4204.85 290468.01 9910914.49 0° 48'19.934" S 76°52'58 .011" W 1.60 673.25 End of B uild (J)
6492.38 36.00 68.50 5938.07 290825.17 9911055.18 0°48'15. 360" S 76°52 '46.459" W 0.00 1912.88 Tope Orteguaza
6592.00 36.00 68.50 6018.67 290841.78 9911061.72 0°48'15. 147" S 76°52 '45.922" W 0.00 1970.53 Casi ng 13 3/8
7648.10 36.00 68.50 6873.07 291017.85 9911131.08 0°48'12. 892" S 76°52 '40.227" W 0.00 2581.62 Tope Ti yuyacu
9195.66 36.00 68.50 8125.07 291275.85 9911232.71 0°48'09. 587" S 76°52 '31.883" W 0.00 3477.07 Tope C ongl. T Y Inf.
9444.11 36.00 68.50 8326.07 291317.27 9911249.02 0°48'09. 057" S 76°52 '30.543" W 0.00 3620.83 Base Congl. TY Inf.
9502.12 36.00 68.50 8373.00 291326.94 9911252.83 0° 48'08.933" S 76°52'30 .231" W 0.00 3654.40 End of Tangent (J)
9502.20 36.00 68.50 8373.07 291326.96 9911252.84 0°48'08. 933" S 76°52 '30.230" W 2.84 3654.45 Tope Tena
10444.00 46.27 30.33 9092.64 291460.27 9911375.53 0°48'04. 941" S 76°52 '25.917" W 2.84 4237.87 Casi ng 9 5/8
10494.33 47.12 28.76 9127.16 291465.77 9911385.24 0°48'04. 625" S 76°52 '25.739" W 2.84 4269.95 Tope B asal T ena (OS )
10516.21 47.50 28.09 9142.00 291468.11 9911389.56 0° 48'04.485" S 76°52'25 .664" W 2.84 4283.89 End of 3D Arc
10516.35 47.50 28.09 9142.09 291468.12 9911389.58 0°48'04. 484" S 76°52 '25.663" W 0.85 4283.98 Tope Napo
10767.07 45.38 28.09 9314.86 291494.20 9911438.44 0°48'02. 894" S 76°52 '24.819" W 0.85 4440.86 Tope C ali za M-1
10835.16 44.80 28.09 9362.93 291501.12 9911451.41 0°48'02. 471" S 76°52 '24.595" W 0.85 4482.50 Base Cali za M-1
11057.82 42.92 28.09 9523.46 291523.26 9911492.91 0°48'01. 121" S 76°52 '23.879" W 0.85 4615.73 Tope C ali za M-2
11143.89 42.19 28.09 9586.86 291531.62 9911508.56 0°48'00. 612" S 76°52 '23.608" W 0.85 4665.99 Base Cali za M-2
11224.23 41.51 28.09 9646.70 291539.31 9911522.98 0°48'00. 142" S 76°52 '23.359" W 0.85 4712.28 Tope C ali za A
11446.58 39.64 28.09 9815.58 291560.07 9911561.87 0°47'58. 877" S 76°52 '22.688" W 0.85 4837.16 Base Cali za A / Tope U S up.
11552.07 38.74 28.09 9897.34 291569.63 9911579.80 0°47'58. 293" S 76°52 '22.378" W 0.85 4894.72 Tope U I nf. (OS )
11586.00 38.46 28.09 9923.86 291572.67 9911585.49 0°47'58. 108" S 76°52 '22.280" W 0.85 4913.00 Base U I nf.
11729.84 37.24 28.09 10037.44 291585.34 9911609.23 0°47'57. 335" S 76°52 '21.870" W 0.85 4989.21 Tope C ali za B
11757.92 37.00 28.09 10059.83 291587.77 9911613.79 0°47'57. 187" S 76°52 '21.791" W 0.85 5003.84 Tope T S up.
11882.28 35.95 28.09 10159.83 291598.38 9911633.67 0° 47'56.540" S 76°52'21 .448" W 0.85 5067.69 End of 3D Arc; Tope T Inf. (OP )
11942.14 34.82 28.09 10208.63 291603.35 9911642.99 0°47'56. 237" S 76°52 '21.287" W 1.89 5097.61 Base T I nf.
12080.52 32.20 28.09 10324.00 291614.32 9911663.54 0°47'55. 568" S 76°52 '20.932" W 1.89 5163.58 Tope C ali ca C, TD - Li ner 7"
GEOLOGIC CONSIDERATIONS
GEOLOGIC CONSIDERATIONS
The presence fault can change the well profile.

a) Falla inversa, b) Falla normal y c) Falla rumbo


deslizante
FAULT EXAMPLES
ISOPACH MAP
<header>
294000 294400 294800 295200 295600 296000 296400 296800 297200 297600

9973600
9973600
S-218D S-239D

9973200
9973200
S-160D
S-138
S-217D
S-58

9972800
9972800

S-320D
S-PROF
S-210D

9972400
9972400

S-213D
S-214D
S-321D

9972000
9972000

S-227D
ISOPACH MAP

S-192
S-241D
S-170

9971600
9971600

S-242D S-226D
S-240D

9971200
9971200

S-174H
S-275D
S-175H S-63
S-53

9970800
9970800

S-274D

9970400
9970400

S-171H S-133 S-273D

9970000
9970000

S-51

S-31
S-162
SAC-278D

9969600
9969600

S-148ST S-020-01
S-161 S-250D

9969200
9969200

S-020-03
S-249D S-20
9968800
9968800

S-6
294000 294400 294800 295200 295600 296000 296400 296800 297200 297600
S-251D
MAPA ESTRUCTURAL EN PROFUNDIDAD REFERIDO TOPE HOLLIN
0 100 200 300 400 500m
CAMPO SACHA POZO
1:15000 SAC-278D
-8900

ESCALA INTERV. CONTORNO


1:15000 10FT
-8950

-8900
WELL LOCATION
• La ubicación de nuevos pozos debe hacerse en un alto estructural, que esté
sobre el OWC (Oil-Water Contact), y mantener la suficiente distancia de los
pozos cercanos
• Que exista continuidad en la arena.
• Que para los nuevos pozos se estime una presión de reservorio que sea
comercialmente adecuada.
• Conocer el historial de producción de los pozos Offset, para realizar el
cálculo de reservas.
• Realizar un estudio de la producción de los nuevos pozos para predecir el
tiempo de producción de los mismos.
TRAPS
STRATIGRAPHIC COLUMN
STRATIGRAPHIC COLUMN
Aplicaciones
DISCIPLINAS APLICACIÓN
[1]
Véase (1.4.2 REGISTROS DIRECCIONALES (SURVEY).) Para realizar los diseños de los BHA a utilizar en las distintas
Direccional secciones de perforación. Para generar el Survey del perfil del pozo
planeado.
Para diseñar la curva de pesos del lodo vs profundidad de acuerdo a
Fluidos de Perforación
las presiones esperadas en cada formación.
Para seleccionar el tipo de broca adecuada y diseñar la hidráulica
Brocas
óptima para perforar una determinada litología
Para formular la composición de las lechadas de cemento
Cementación dependiendo de las características de las formaciones con las que
tendrán contacto.
ANTICOLLISION – TRAVELLING
CYLINDER
• Permite disminuir el riesgo de colisión con los pozos cercanos a partir de la
generación de registros de desviación (Survey) del pozo que se va perforar y
la recolección de datos de todos los pozos vecinos perforados anteriormente.
Una técnica altamente utilizada es el travelling cylinder.