You are on page 1of 12

PROJECT MANAGEMENT

NTCP ANALYSIS

Presented by (Group 7): -


Rachit Sharma - 291146
Rishabh Arora - 291148
Sahil Bansal – 291175
Meenal Juneja -291170
Paras Khurana -291172
HYDERABAD METRO

• Hyderabad Metro Rail Project is the World's Largest Public-Private


Partnership Project (PPP) in the Metro Sector.
• The Project will be integrated with existing railway stations,
suburban railway network (MMTS) and bus stations to ensure
seamless and comfortable travel.
• The Hyderabad Metro Rail Network will cover a total distance of
around 69.2 Km across three corridors:
• Corridor I   :   Miyapur to LB Nagar
• Corridor II  :   JBS to MGBS
• Corridor III :   Nagole to Raidurgam
NTCP MODEL

Novelty- Platform
Complexity- High-tech
Technology- System
Pace- Fast/competitive
NAGARJUNA SAGAR DAM

• Nagarjuna Sagar Dam is a masonry dam across the Krishna River at


Nagarjuna Sagar.
• It straddles the border between Guntur district in Andhra
Pradesh and Nalgonda district in Telangana.
• It was constructed between 1955 and 1967
• The gross storage capacity of the dam is 11.472 billion cubic meters
(405.1×109 cu ft).
• The dam is 590 feet (180 m) tall from its deepest foundation and 0.99
miles (1.6 km) long with 26 flood gates which are 42 feet (13 m) wide
and 45 feet (14 m) tall.
NTCP MODEL

Novelty- Derivative
Complexity- System
Technology- High-Tech
Pace- Time-critical
IOT LIGHTING SYSTEM

IoT smart lighting uses wireless switches, eliminating


the need to wire light switches directly to fixtures.
Those bulbs are then connected to a network, allowing
them to be monitored and controlled from the cloud.
Via the web or a mobile app, you can manage individual
lights or groups of lights based on things like
occupancy, external light levels, and times of day; you
can also control dimming and color-changing. And
smart fixtures like these can also convey information
about broken and burnt-out lighting, all in real-time.
NTCP MODEL

Novelty- Breakthrough
Complexity- Array
Technology- High
Pace- Fast
DHOLERA SMART CIT

• Dholera Smart City is a town situated in Gujarat, is the joint venture of Gujarat Govt. and central Government.
Strategically located the Ahmedabad-Dholera industrial region lies within 100 km from Dedicated Freight
Corridor(DFC) in Southern Gujarat.
• Total Area : 800 sq. kms: a green field location
• Major projects:
• ABCD Building Dholera SIR
• Dholera International Airport
• World’s Largest Solar Park
• Dholera - Ahmedabad Metro Train
• New Six Lane Express way
NTCP MODEL

Novelty- Platform
Complexity- Array
Technology- Medium
Pace- Fast
MARS CLIMATE ORBITER PROJECT

• The Mars Climate Orbiter (formerly the Mars Surveyor '98 Orbiter) was a 638-kilogram


(1,407 lb) robotic space probe launched by NASA on December 11, 1998 to study the Martian climate, Martian
atmosphere, and surface changes and to act as the communications relay in the Mars Surveyor '98
program for Mars Polar Lander probes.
• It carried following instruments:
• Pressure Modulated Infrared Radiometer (PMIRR)
• Mars Colour Imaging System (Two Cameras) (MARCI)
• Sept. 23, 1999, the orbiter began its Mars orbit insertion burn as planned. The spacecraft was scheduled to re-
establish contact after passing behind Mars, but, unfortunately, no signals were received from the spacecraft.
• The mission was unsuccessful due to a navigation error caused by a failure to translate English units to metric.
Thereby, leading it to enter too slow into mars orbit and disintegrate due to atmospheric stress.
NTCP MODEL

-Required Style
-Actual Style

Novelty- Breakthrough
Complexity- System
Technology- High
Pace- Time-critical