Professional Documents
Culture Documents
30-60Days, 60-90Days,
38.52 Cr 90-120Days,
25.61 Cr
11.07 Cr
PGVCL, WBSED
9.43 , CL,
[PERCE 3.71 ,
NTAGE] [PERCE MVVNL MVVNL,
JKPDD, NTAGE] , JKPDD, 11.04 ,
7.61 , 14.51 , 12.08 , [PERCE
[PERCE [PERCE [PERCE NTAGE]
NTAGE] NTAGE] NTAGE]
DVVNL, PUVVN
1.77 , DVVNL, PUVVNL
L,
[PERCE 1.49 , 0.10 , , 2.39 ,
NTAGE] [PERCE [PERCE [PERCE
NTAGE] NTAGE]
NTAGE]
TAGE]
Above 180Days,
33.63 Cr MVVNL,
31.57 Cr
PUVVNL, DVVNL, JKPDD, Others,
0.70 , 0.57 , 0.79 , 1.33 , Sitapur
[PERCENTAGE] [PERCENTAGE] [PERCENTAGE] [PERCE RGGVY,
NTAGE] 7.79 ,
Luckno
w Metro [PERCE
UG, NTAGE]
10.48 ,
[PERCE
NTAGE]
Luckno
MVVNL, w
31.57 , RGGVY,
11.97 ,
[PERCENT [PERCE
AGE] NTAGE]
MVVNL
SAUBHAGYA
Fund allotment to be made by REC as discussed with MD, MVVNL meeting.
RGGVY
Sitapur - Audit report awaited due to unavailability of finance person at MVVNL.
Lucknow – Closure to be complied of various TKC’s.
ISSUES OF NON COLLECTION
IPDS
Lucknow Metro UG
PUVVNL
• Nandi/Afzal (IPDS):
• Rs 2.45 cr of Barabanki 30% retention bills ( 32 bills), pending with nodal
Supply JE, JE clearing 5-6 bills per week and Rs 1.17 cr of Erection bills
pending with JE, on leave , all NC’s compliances done, expecting by1 week
• Afzal(Saubhagya):
• Rs 12.05 cr of Balrampur Saubhagya, physical work completion expected by
31.07.19 from 15.07.19 due to rain water logging & delay in supply of poles
by MVVNL, Rs 4 cr bills to be cleared by 25.07.19 JMC signed
• Rs 3.12 cr of Bahraich , physical work completed, JMC signing & MB
writing under process, SE insisting on clearing the bills in single lot instead of
Mutiple bills, no movement in bills from last month since JE/SDO not sparing
the time
• R.Arora:
• Out of Rs 11 cr of MZN , Rs 6 cr JMS done PMA certification pending,
balance Rs 5 cr JE visit / work pending
• Rs 4.45 cr of Shamli , JE visit pending
• Rs 2.6 cr of Hapur, PMA visit pending
MB NOT DONE ELAPSED TIME ANALYSIS (EPC)
Issues need Help (>60 Days):
• KT Babu:
• Rs 0.60 cr of IPDS Gorakhpur pending due to PMA visit and Rs 58 lakhs
of DDUJGY Gorakhpur , pending for PMA compliance
• Rao:
Debtors Got reduced by 47 crores since March 19 . Collection of Qtr-1 is 322 crore
EPC – TOTAL RECEIVABLE ANALYSIS
Total Receivables : 597.35 Cr.
AMC - 5 nos.
0.84
HOTO Projects - 14 Nos. (Fin.
0%
Closure)
138.77
23%
New Projects - 18 Nos. 360 Cr(60%) Receivables Pending in
236.72
40% Old Projects
(HOTO projects + Old projects Op.
Old Projects - 7 Nos. (Op.
Closure)
closure + Old projects work
113.03
19% pending )
Old Projects - 8 Nos. (work
pending)
108
18%
Old Projects:-Operational Closure(7 nos)
Estimated date
% Financialy
Projects Balance for reaching all Issues/Remark
Completion
in Cr bills to MD office
Certification of bills need to be speed up from JE
MVVNL BARABANKI IPDS
14.63 52 11-11-2019 ,SDO ,Exen Level.
Civil & Erection bill certification need to be
MVVNL UNNAO IPDS
15.39 61 13-12-2019 speed up from JE ,SDO ,Exen Level.
Maximum of bills are at SE level, need to
PuVVNL- Varanasi IPDS
14.09 80 26-08-2019 expedite the same.
J & K SONMARG UG
1.88 100 29-10-2019 10% payment is pending due to 3 month trial run.
MVVNL Ayodhya & Faizabad 0.58 99 - Follow up for Allotment of Fund from Budget
PGCIL-VARANASI PACKAGE A 12.00 93 25-10-2019
PGCIL-VARANASI PACKAGE B 15.00 92 20-10-2019
AMC amount is pending , AMC period pending is
J & K GULMARG UG
0.39 100 - 2.5 year
Fencing work is to be completed of one number
J & K PAHALGAM UG
1.31 100 31-07-2019 33 kV RMU
EPC – TOTAL OLD PROJECTS WORK PENDING
S.no Project Value(Cr)
Total Receivables : 597.35 Cr. 1 DVVNL- Firozabad DDUGJY 19.595
AGRA ZONE 549 549 430 13337 8105 4272 10989 4880 2348
FIROZABAD-FSP 99 60 51 13970 6715 1644 8101 2033 5869
% improvement = 28%
% improvement = 17%
ISSUES
Only 1 Person of ERDA (PMA) per project to verify the defects. The verified reports generated from site are re-verified by ERDA
Vadodara office which takes more time for clearance.
Original contractors are not responding to clear out the defects, therefore additional departmental labor / gangs are being deployed to
clear the defects with debit note being issued to the original contractors.
ERECTION FLOW FSP DDUGJY
Tentative
Weekly Asking Rate
(WAR) 2 completion
Date 30-Aug-19 Sr. no Billing Unit Unit Scope Completed Balance
Weekly Current Rate Expected
0.40 Completion
(WCR)
Date 3-Sep-19 1 Feeders Nos. 24 2 22
GAP (WAR - WCR) 1.4 Delays (in Days) 4
00 0 0 0 0
June 1st week June 2nd week June 3rd week June 4th week July 1st week
june
june 4 3 june 2
week week week
Progress
Achieved 185 189 189
JMC verified
by client and
165 188 187
submitted to
account.
Handover
Documents
165 168 168
submitted to
accounts.
1- FSP jharina feeder completed but due to no. of time theft we have to do re - stringing.
2-Datiyana andPawatifeeder work pending due tovcbfault whichis pending from1month.
3- Yadnagar ,jhandabaitel charging pending dut vcbfault whichis pending from1month.
DDUGJY Gorakhpur Status
1 15 15
Additional Substation
2 4 4
Augmentation Substation
3 9 5
New Substation
AMC - 5 nos.
0.84
HOTO Projects - 14 Nos. (Fin.
0%
Closure)
138.77
23%
New Projects - 18 Nos.
236.72
40%
MVVNL;
31.27; 17%
Others
10% Not due
2.78 WBSEDCL;
46.87 1% MD Office 65.01; 35%
20% 77.25 GED; 10.96;
33% 6%
30% Not due Guj; 18.24;
44.63 10%
19% MB Done
23.04
MB Not Done
42.16 10% NDMC;
18% 1.34; 1%
JKPDD;
60.22; 32%
PURCHASE
WIP- JAMSHEDPUR, RANCHI, NEPAL, EMERGENCY (287/403)
JAMSHEDPUR Jamshedpur Status for Pending Line Item
No. of Line
Phase Description Issue GTP Status
Item
GIS SS Power & Station Transformer 2 Under Negotiation GTP Submission Pending
Line Item- 178
GTP Submission Pending
KEI (Cable); GIS SS Battery & Charger 2 Recently cleared by design.
14; 8% CCTV (6 nos.) and Surveillance
NA; 5; 3% Enquiry send to vendor. Doc. Awaited GTP Submission Pending
GIS SS system 1
PO Common Paint (Local Purchase) 2 Local Vendor received. PO to be placed. GTP Not Required
Done, Pillar Box Cum Consumer
91, LT service distribution box 1 Under detailed engineering GTP Re-Submission Pending
[PERCE
PO Technical clarity required for indoor
NTAGE] GTP Submission Pending
Pending, GIS SS DBCR Isolator 3 type.
60, GIS SS 33kV & 11KV Indoor GIS Panel
with termination kit 13 Under Technical Vetting GTP Submission Pending
[PERCE
Local
Purchase ; 8;
NTAGE] Covered ACSR Panther
33 KV Line 7 Accessories TS required. Exact TTR GTP Submission Pending
4% conductor with accessories required from vendor.
GIS SS 415V, ACDB, DCDB, LTDB for 4
Station Trafo, Capacitor Bank Under Technical vetting. GTP Submission Pending
RTU-Type B 33/11 kV Sub Technical query raised by vendor. GTP Submission Pending
GIS SS Stations 18
GTP Submission Pending 58 GIS SS 5T Electric hoist 1 Detail required from design. GTP Submission Pending
GTP Re-Submission pending 1 HVAC, Electrification, Fire 5 Required Substation Room Layout from GTP Submission Pending
GIS SS Fighting Sysem design
GTP Not Required 1
Common, LT Cable Marker , HT Tape 2 Size & TS required from design GTP Submission Pending
T-Connector Suitable for
Total Project Days :- Approx. 540 LT
tapping
1 Not Required as of now. GTP Not Required
Elapsed Days from Contract :- 123 Numbering , Caution Tape, LT
Common, LT 6 Local vendor required GTP Not Required
Balance Days :- 417 days Tape (Local Purchase)
RANCHI Ranchi Status for Pending Line Item
No. of
Line Item = 210 Phase Description Line Issue GTP Status
Item
KEI
(Cable); 9;
PO SS Power & Distribution 4 Under Negotiation GTP Submission Pending
4% Transformer
Pendin
g, 21, SS 33Kv & 11KV Isolator 2 Recently cleared by design. GTP Submission Pending
[PERC LTCT Electronic Meter, Sodium
ENTA DTR, SS 2 Documents awaited from vendor GTP Submission Pending
Vapor lamp
GE]
PO Local 33 KV Line Heavy duty GI pipe 150 mm 1 PO to be given. GTP Approved
Done, Purchas Local Vendor provided. PO to be
161, e ; 19; Common Paint, Thinner (Local Purchase) 5 GTP Not required
given
[PERC 9%
Pilar Box Cum Consumer service
ENTA LT 1 Under detailed engineering GTP Re-Submission Pending
DB
GE]
33Kv & 11 VCB with control Document under technical
SS panel, stand, CTPT & CRP 3 vetting GTP Submission Pending
SS ICTP main switch, Kit-kat, MCB, 4 Local vendor required GTP Not required
Total Project Days :- Approx. 540 Control Board
Elapsed Days from Contract :- 123 Common, 33KV UG Number & Caution Tape, Al. Pipe 10 Local vendor required GTP Not required
Balance Days :- 417 days ,11KV UG LT with connector, PVC Pipe, LT Tape
NEPAL Nepal Status for Pending Line Item
Description No. of Line Issue GTP Status
Line ItemPO
= 223 Item
Don CT- PT Metering units, MCCB & ACB GTP Submission
e, KEI 4 Under Negotiation
(Cabl Spare, Suspension clamp Pending
70, e); 9;
[PE 4% Size changed after PO. New approval
Lugs 5 PO Pending
RCNA; received on 11.7.2019
89;
EN40%
PO Structure, Earthing rod, Danger & GTP Submission
TA 4
Pen Phase plate Recently Cleared by engineering. Pending
GE]
ding
,
Dog Conductor, Al. Lugs, Disc GTP Submission
Insulator, Jointing Kit 6 Pending
55, Requirement received recently.
[PE GTP Submission
PCC Pole 11.0M & 9M 2
RC End client confirmation awaited for 350KG Pending
EN GTP Submission
TA Cable Route Marker 2
Size and Technical specification Required Pending
GE]
GTP Submission
Mobile Cable Fault Locator, GI wire 3 Under Technical
GTP Submission Pending 36 Pending
GTP Re-Submission pending 5
Gland & GI Pipe 4 Revised document submitted for approval. GTP Approval pending
(Size changed after PO).
GTP Approval Pending 4
GI Nuts & Bolts, LT Stay set & GTP Submission
GTP Not Required 10 Insulator, GI Pipe for Earthing 5 Size Pending Pending
Earthing with Cu clad , Number
GTP Submission
plate, Jointing sleeves, Al. Binding 9 Specification required Pending
Wire, PG clamp, Pin Insulator, GI Pin
Connector and Clamps 5% of used GTP Submission
Total Project Days :- 900 quantity 1 Technical clarity required Pending
Elapsed Days from Contract :- 122
Spares for LTDB, and RMU, FO cable 10 Not clear from Projects GTP Not Required
Balance days :- 778
MMT
MATERIAL MANAGEMENT
STR - SWASTIK
STOCK OUT KITS 3M / RAYCHEM
HVDS DI 20.6 ERDA REPORT
UNDER TRANSIT
SECTIONALIZER FROM
CABLE DI PENDING ENTEC – KOREA
GOA SINCE 27.6 REACHD MUMBAI PORT
IN TRANSIT
ATTENTION REQIUIRED
PO PLACED TO
BIDHAN NAGAR S/S L&T CRP PANEL VENDOR
TROLLEY DAMAGED AT THE TIME OF
PROJECT TRANSIT / LOADING / UNLOADING
LEAD TIME 4-5
WEEKS
JUNCTION BOXES
TYPE 1 JB TYPE 3 JB PLOT JB ST LIGHT BOX LILO BOX
BOQ 380 - NR BOQ 6146 BOQ 849 BOQ 276 BOQ 5000
DTR Completion
900
804 828
800 779
730 739 750 813
711
700 682 764 769
647 718 735 741
614 622 624 697 694 713
588 593 668 664 686
600 534 544 554 620 623 646 631
515 599 608 617
501 573 577 573 583
500 471 542 549 537 544
433 439 440 520 514 518
389 403 411 487 501 477 482 490
400 433 434 435 460 449 456
428
381 395 396 372 383 386 397
300334 355 355
200
100
0
Jan 1st Jan 2nd Jan 3rd Jan 4th Feb 1st Feb 2nd Feb 3rd Feb 4th March March March March April 1st April Aprl 3rd April May 1st May May 3rd May 4th June 1st June June 3rd June 4th 1st 2nd
Week Week Week Week Week Week Week Week 1st 2nd 3rd 4th Week 2nd Week 4th Week 2nd Week Week Week 2nd Week Week Week of week of
week week Week Week Week Week Week Week July July
Total scope Work done Percentage Total scope Work done Percentage
6 HT, & LT Cable laying KM 339.455 118.841 35% 461 145.981 32%
DAILY FLOW SHEET- KRISHNANAGAR & CHINSURAH PROJECTS
UG KRISHNANAGAR UG CHINSURAH
Progress No. of DTR Progress No. of DTR
Total No. of DTR 447
Total No. of DTR 346 WIP DTR 165
WIP DTR 131
DTR in which Pipe Laying Completed 140
DTR in which Pipe Laying Completed 102
DTR in which Pipe laying in progress 27
DTR in which Pipe laying in progress 14
DTR in which Cable laying completed 84 DTR in which Cable laying completed 91
DTR in which Cable laying in progress 6
DTR in which Cable laying in progress 25
DTR in which JB Foundation Completed 92
DTR in which JB Foundation Completed 37
DTR in which Service cable laying work
DTR in which Service cable laying work Completed 0
Completed 3
No. Of DTR whose JMC's Pending 0
No. Of DTR whose JMC's Pending 0
DTR's Ready for Charging 0 DTR's Ready for Charging 7
DTR's 100% Ready for Charging 23 DTR's 100% Ready for Charging 0
ISSUES TO BE RESOLVED - KRISHNANAGAR & CHINSURAH
ISSUES :-
1. Full Kit of material is not available (160 KVA DTR, Junction Box Type-3, Plot Type Junction Box, LILO Box, Street
Light Junction Box, 3cx95sqm Cable, Jointing Kit of 3cx95 sqmm, Pole clamp 3 types)
2. NOC require for road restoration in Krishnanagar & Chinsurah.
3. Due to unavailability of full kit we are unable to charge the DTR in projects.
WEEKLY PROGRESS REPORT CARD – HVDS ARAMBAGH
DTR Completion
160
140 18
120 56
15
100
32
80
12 69
60 20 60
12
40 8 10 19 41
5 13 14
201 9 21
15 17 18
5
05
3rd week of May 4th Week of May 1st week of June 2nd Week of June 3rd Week of June 4th Week June 1st week of July 2nd Week of July
DTR Completion
400
350 77
300 64
120
250 48
97
200 46 75
43
150 37 61 148
32 58 124 134
31 56
100 44 93
39
63 70
5046 56
0
3rd week of May 4th Week of May 1st Week of June 2nd Week of June 3rd Week of June 4th week of june 1st Week of July 2nd week of July
DTR Completion
Erection Completion JMC submitted to client JMC approved by client
160
30
140
120 27 47
100 24
37
80 20
31 74
15 27
60 14 56
21
19 46
40 35
8 30
9 23
20 4 16
5
8
0
3rd week of May 4th Week of May 1st Week of June 2nd Week of June 3rd Week of June 4th week of June 1st week of July 2nd Week of July
ISSUES TO BE RESOLVED- HVDS PROJECTS
ISSUES :-
1. There are multiple location/town in a project.
2. The client official has transferred so the bill process are taking time.
3. The vigilance team are monitoring the work of other contractor in Gorakhpur so the Client
says to hold the KEI bill processing for further 10 to 15 days.
EXECUTION MVVNL
ERECTION FLOW –SAUBHAGYA BAHRAICH
ISSUES
Action Taken:-
1. Work balance in patches so desired speed 1.We are moving with departmental team wherever
decreases. desired progress and quantum reduces.
ISSUES
ACTION TAKEN
1. 115 nos invoice of Sub contractor finalization balance out of 1. It will take 15 days to complete the 115 nos invoices.
526 nos invoices.
2. Intimated to RQM for increase the manpower .
2. RQM Stage-II inspection started and 65 nos habitation
inspection done out of 150 habitation. 75 nos reverification 3. Intimation given to H.O for vacate the store .
also done out of 132 nos habitation. RQM Taking time 4. Inspection done in Lucknow and waiting for sitapur
because of Manpower resignation. project .
3. Store vacate .
4. NQM Inspection stage-II not started.
LUCKNOW RGGVY & LUCKNOW SAUBHGYA:-
1 UG Metro 29 29 29 23 15
• NC linked with HOTO:- 406 NC to be cleared for balance 14 nos Feeder HOTO.
EXECUTION-PVVNL
EXECUTION-J&K
J&K-IPDS/PMDP
Weekly Asking Rate (WAR)
27 Planned Completion Date 30-Nov-19
Weekly Current Rate (WCR)
16 Expected Completion Date 03-06-2020
GAP (WAR - WCR) 11
Delay (In Days) 186
Non-working days 120
Chart Title
300
274
260
248
250 241
236
229 226
216
206
197 200
200 190 192 192
178 174
168 164
158 161
155
147
150 140
135 130
113
100 90
83
74 77
50
0
April 3rd week April 4th week May 1st week May 2'nd & 3'rd week May- 4'th week june 1'st week june 2'nd week june 3'rd week june 4'th week july 1'st week
Status:-
Total No. of new receiving station:- 14 nos.
Land allotted for receiving station:- 13 Nos.
Total No. of completed new receiving stations:- 03 nos.
Total of completed augmented receiving station:- 05 nos.
Slab Casting done for the 11 Nos. of control room building for the receiving stations.
We have charged all the power transformer received till date.
ISSUES:-
Ongoing amaranth yatra restricts the movement of our staff and labour in the sites.
Local public hindrances are also main reason for lagging of progress.
In line items, Single core power cable of 70 sqmm, 185 sqmm , 240 sqmm and 400 sqmm are in black and Earthing Pipe are in red.
Power Transformer are urgently required for the new receiving station sites.
EXECUTION-GOA
Weekly Progress Report Card - 11 kV GOA
Weekly Asking Rate (WAR) 6.73 Planned Completion Date 31-Dec-19
Expected Completion Date
Weekly Current Rate (WCR) 3.40 (Charging Progress) 3-Jan 20
GAP (WAR - WCR) 3.33 Delay (In Days) 77.47
Non Working Days 90 1st June to 30 August (Mansoon Seasion )
Expected Completion Date (Erection ProgressProgress) 27-Nov-19
Expected Completion Date (Erection Billing) 3-Jan-20
500 72
57 63 104
52 52 56 56
400 47 49
47 87 87
85 87 87 87
26 85 85
10 10 79 117
10
75 79 79 79
10
66
300 10 97 98
10 60 94 95 95
51 90 92
88 90
87 87 87 87 88
77 77
4 68
200 19 65 68
49 51 52 59 59 60 60
4 51
4 37 42 42 42 44 44 45
37 37 122
4
37 32 100 100 100 100 103 103
3
4 26 89 95 98 98
36 23 77 81 84 84 86 86 87
100 3 19 68
4
22 57
14 46
3
4
11 10 37
3
4 6
16 27
3
4 5
10
1
2
0
ry ry ry ry ry ry y ry ch il ril ril ril y
a ar ch ch ar ch pr ay ay ay ay un
e
un
e
un
e
un
e ul ul
y
u ua ua ua ua ua bu ua ar ar ar Ap Ap Ap M M M M J fJ fJ
n n n n b b e b M M M M ek
A k k k k k k k ek kJ fJ fJ ko
kJ
a
kJ
a
kJ
a
kJ
a
kF
e
kF
e F
kF
e k k k ek e e e e e e e ee e e ee ko ko ko
ee
k ee ee ee e e e e e w w w w e
ee ee ee e
ee ee ee ee ee ee ee w w w w w w t d d h W W e
w w w w w w w w 1
w
2
w 3 4 1 d 3r
d
4t
h 1s 2n 3r 4t 1s
t
2n
d w W tW d
w
1 2 3 4 1 2 3 4 2n 3r
d h 1s 2n
4t
CONSTRAINTS - GOA PROJECT
1. Installation of AB Cable get Damaged due to calamity condition (heavy rain fall, tree
falling, etc.)
2. Shutdown not permitted because of power cut for rectification of line damaged due to
calamity condition.
3. Work is stopped due to heavy rain since 1st june 2019
4. Contractors has not able to retain there Manpower due to work front, shutdown, etc.
5. Available Manpower is occupied for rectification of damaged line only.
6. Departmental intervention / support in ROW is negligible
7. Live Earth tester and high resistance fault locator confirmation of model No and make is
awaited form Quality team (Plant)
8. Scope reduced due to site clearances
SITE PROGRESS – GUJARAT ( RAJKOT & BHAVNAGAR)
200
120
10066
0
1-Dec-18 1-Jan-19 1-Mar-19 1-May-19 12-Jul-19
Axis Title
3. DURATION : 24 Months
4. SCOPE:
Total 10 10 10 10 10
G.Total 71 71 71 71 71
Description of Activity in Scope Ranchi Survey Done Ranchi Scope Jamshedpur Survey Done
Billing Unit Jamshedpur
33kV Line UG (Nos Of 17 17 11 11
Feeders)
11KV Line UG (Nos Of 34 34 14 14
Feeders)
LT UG (Nos Of DT’s) * 151 151 175 175
Tentative
DTR New 20 IIIT Land -
demarcation awaited
SR.NO WORK DESCRIPTION BOQ QTY . EXECUTED QTY. PERCENTAGE WORK COMPLETED
CONSTRUCTION / EXTENSION OF 11kV OVERHEAD DISTRIBUTION SYSTEM & CONSTRUCTION OF NEW LV OVERHEAD DISTRIBUTION SYSTEM
1 . ALL THE VARITION QTY. BOQ MATERIAL NEED TO BE EXPEDITE AT EARLIEST AS ENTIRE QTY. CONFIRM TO PROCUREMENT ONE MONTH BEFORE.
CIVIL WORK STATUS OF SUBSTATION : GAMBIA SITE
EXEC. EXEC.
S. No. DESCRIPTION OF WORK UNIT BOQ QTY. BAL.QTY BOQ QTY. BAL.QTY REMARK’S
QTY QTY
4 Control Room Building- Renovation SQM 200 140 60 225 200 25 WORK UNDER PROGRESS