MATRIX OF CONCRETE CASTING

ELLIPSE PROJECT
( OCTOBER 2023 )
COMPRESSIVE STRENGTH TEST RESULTS
CONCRETE 7 Days 14 Days 28 Days
BATCHING NORMAL /
DATE CASTING LOCATION QUALITY (Min 65%) (Min 88%) (Min 100%)
PLANT INTEGRAL Results Results Results
(MPA) Plan Plan Plan
Date Date Date
Mpa Mpa (%) OK/NO Mpa Mpa (%) OK/NO Mpa Mpa Average (%) OK/NO
Vertical Concreting
.KLM DT CENTER IT-D/IT-7- ADHIMIX 30 2-Nov-23 22.67 75.57 OK 9-Nov-23 28.64 95.47 OK 23-Nov-23 36.32
26-Oct-23 NORMAL 9.60 26.40 30.00 29.95 99.82 NO
9 NFA (7 Days) 22.32 74.40 OK (14 Days) 28.94 96.47 OK (28 Days) 23.57
Horizontal Concreting

30 2-Nov-23 22.05 73.50 OK 9-Nov-23 28.07 93.57 OK 23-Nov-23 29.66


.TB ADM BUILDING AD-F-
26-Oct-23 ADHIMIX NORMAL 19.50 23.56 78.53 OK 26.40 28.92 96.40 OK 30.00 35.53 32.23 107.44 OK
H/AD-8'-12
FA (0 Days) 22.97 76.57 OK (0 Days) 27.94 93.13 OK (0 Days) 31.51
30 4-Nov-23 21.95 73.17 OK 11-Nov-23 27.76 92.53 OK 25-Nov-23 29.08
TB ADM BUILDING,TB 23.10 77.00 OK 27.57 91.90 OK 34.64
28-Oct-23 ADM BUILDING AREA ADHIMIX NORMAL 19.50 26.40 30.00 31.66 105.53 OK
DELATASI AS 2-6/E-G 23.65 78.83 OK 28.25 94.17 OK 32.59
NFA (7 Days) 22.83 76.10 OK (0 Hari) 27.50 91.67 OK (0 Hari) 30.33