ELLIPSE PROJECT
( OCTOBER 2023 )
COMPRESSIVE STRENGTH TEST RESULTS
CONCRETE 7 Days 14 Days 28 Days
BATCHING NORMAL /
DATE CASTING LOCATION QUALITY (Min 65%) (Min 88%) (Min 100%)
PLANT INTEGRAL Results Results Results
(MPA) Plan Plan Plan
Date Date Date
Mpa Mpa (%) OK/NO Mpa Mpa (%) OK/NO Mpa Mpa Average (%) OK/NO
Vertical Concreting
.KLM DT CENTER IT-D/IT-7- ADHIMIX 30 2-Nov-23 22.67 75.57 OK 9-Nov-23 28.64 95.47 OK 23-Nov-23 36.32
26-Oct-23 NORMAL 9.60 26.40 30.00 29.95 99.82 NO
9 NFA (7 Days) 22.32 74.40 OK (14 Days) 28.94 96.47 OK (28 Days) 23.57
Horizontal Concreting