PHLN ADB UPI 13sept17 Final Isola
INDONESIA :
An Integrated Multi-Campus University for Tomorrow’s Education
Project Profile
01
Background
02
01 03
Justification of the Project
DURATION
36 months (3 years) SECTOR
Ministry of Research,
Technology, and Higher
88% 12% Education Republic of Indonesia
IMPLEMENTING AGENCY
US$ 51,777,700.00 US$ 6,994,700.00 Universitas Pendidikan
(IDR 699,000,000,000) (IDR 94,428,000,000) Indonesia
3
PROJECT PROFILE
6
2 Cibiru Campus
Jl.
Jl. Raya
Raya Cibiru
Cibiru km
km 15
15 Bandung
Bandung
4
4 Purwakarta Campus
Jl.
Jl. Veteran
Veteran No.
No. 8
8 Purwakarta
Purwakarta
3
1 2 Sumedang
5 Tasikmalaya Campus
Cibiru Jl.
Jl. Dadaha
Dadaha No.18
No.18 Kota
Kota Tasikmalaya
Tasikmalaya
Location of UPI
4
BACKGROUND
Bringing back the presence of the state to protect all the people and provide the sense of security
1 to all citizens;
Making the government present by building effective, democratic, reliable and clean
2 governance;
Building Indonesia from the periphery by strengthening these areas and
3 villages within the framework of a unitary state;
Rejecting the weakness of the state by reforming the system and enforcing the law that is
4 corruption-free, dignified, and reliable;
NAWA 5 Improving the quality of Indonesian human life;
CITA Improving people's productivity and competitiveness in the international
6 market;
BRIEF
HISTORY
7
BACKGROUND
LEGAL
STATUS
8
JUSTIFICATION OF THE PROJECT
There are no
significant changes
(1990-until now)
Gaps in teaching and
learning services
compare to UPI Main
Campus
10
JUSTIFICATION OF THE PROJECT
12
JUSTIFICATION OF THE PROJECT
29% 9% 62%
THE EXISTING
FACILITY
CONDITION
14
JUSTIFICATION OF THE PROJECT
UPI REGIONAL CAMPUS AT PURWAKARTA
THE EXISTING
FACILITY
CONDITION
15
JUSTIFICATION OF THE PROJECT
UPI REGIONAL CAMPUS AT SERANG
THE EXISTING
FACILITY
CONDITION
16
JUSTIFICATION OF THE PROJECT
UPI REGIONAL CAMPUS AT TASIKMALAYA
THE EXISTING
FACILITY
CONDITION
17
JUSTIFICATION OF THE PROJECT
UPI REGIONAL CAMPUS AT SUMEDANG
THE EXISTING
FACILITY
CONDITION
18
JUSTIFICATION OF THE PROJECT
EXISTING BUMI SILIWANGI CAMPUS
2/13/2017 19
JUSTIFICATION OF THE PROJECT
THE COMPETITIVE RATIO OF STUDENT (2015/2016)
Increasing Developing
the number of Integrated
student Multi-Campus
enrollment University
Opening
UPI’S Providing
new study programs
that are in line with
PLANS IN new facilities market demand,
and specially TVET teacher
REGIONAL infrastructures development at
CAMPUSES Purwakarta Campus
Improving Opening
the access Professional
and quality Certification Institution
of education (PCI), Competency Test
and teacher in Center (CTC), and TVET
the region Research Center at
Purwakarta Campus.
21
THE INTEGRATED MULTI-CAMPUS CONCEPT
CONCEPTUAL SERANG
CAMPUS MANAGEMENTCE
SUMEDANG
CAMPUS
Learning Service
PURWAKARTA
CAMPUS AS
Resources Sharing
TASIKMALAYA
(Autonomy) CENTRE OF TVET CAMPUS (e.g. Inter Library Loan)
TEACHER
DEVELOPMENT
22
THE PROJECT OUTPUT
Provision of laboratory
equipment with required Provision of furniture and fixture that
specifications and quality in support academic operational activities in
the UPI integrated multi- buildings of UPI integrated multi-campus.
campus.
23
THE PROJECT OUTCOME
The IMPROVEMENT of
the equality of
undergraduate quality of education
trainings and
quality undergraduate contribution for research
certifications academic
between main and GEI higher productivity
needed by atmosphere
campus and postgraduates education of and quality
industries.
regional education West Java
campuses
24
BENEFIT
The development will provide better trained and informed graduates and better
quality of academic programs, thus make a significant contribution to the economic
development of Indonesia, particularly in West Java.
26 26
CHECKLIST of READINESS CRITERIA
NO COMPONENT READINESS
• ADB Proposal : Figure 5.2 Page V-4
1 The Project’s Time Schedule
• Readiness Criteria: Table 1.3 Page I-16
• ADB Proposal : Table 4.1 Page IV-2
2 The Loan Needed and Additional Funds
• Readiness Criteria: Table 1.6 Page I-39
• ADB Proposal : Page IV-3 to Page IV-18
3 Detail of Project Cost Estimation
• Readiness Criteria: Page I-39 to page I-58
• ADB Proposal : Table 4.2 Page IV-3
4 Disbursement ADB Loan Projection Per Year
• Readiness Criteria: Page I-59
• ADB Proposal : Table 4.2 Page IV-3
5 Disbursement GOI Financing Per Year
• Readiness Criteria: Page I-60
6 PIU Structure of Organization SK Rektor No. 0296/UN.40/KP/2017
• Clear and Clean
7 Location
• Land Ownership Sertificate by UPI
Preliminary Design UPI Main Campus and
8 Available in the Attachment
regional campuses
Environmental Impact Assessment (UKL-UPL • Document of UKL-UPL is ready
9
document) • Recommendation of UKL-UPL was Ready
10 The preparation of Implementation Funds Non PNBP UPI
27
THE SCOPE OF ACTIVITIES
CONSTRUCTION
WORK
EQUIPMENT
ABOUT THE PROJECT
(Building and
Infrastructure
Development)
TRAINING TECHNOLOGY
Development and
Program INFORMATION
System
28
PROPOSED BUILDING PROGRAMS
1. Sustainable Campus
The Architectural 2. Smart and Integrated Campus
Theme 3. Compact Campus
Cibiru
5,928 m2
TotalUPI’s
Total UPI’sPlan
Planofof
About the PROJECT
Sumedang
New Building Programs
New Building Programs 5,064 m2
60,236m2
60,236 m2 UPI Main
Campus
18,540 m2
Serang Tasikmalaya
6,064 m2 6,320 m2
Purwakarta
18,320 m2
30
CONSTRUCTION AND INFRASTRUCTURE WORK
No. BUILDINGS DESCRIPTION FLOOR AREA/M2
A UPI-BUMI SILIWANGI
Integrated Campus Management Center 4 4,750
Faculty of Economy and Business Education 6 6,750
Integrated Classroom and Laboratory for Post Graduate School 5 5,750
SUB TOTAL 18,540
PROJECT SCOPE
Project Proposed
ADB Loan (US$) GOI (US$) Total (US$)
Universitas Pendidikan
Indonesia:
51,777,700.00 6,994,700.00 58,772,400.00
An Integrated Multi-Campus
for Tomorrow’s Education
32
COST ESTIMATION PROJECT
34
BUDGET ALOCATION PER YEAR
2 Equipment - - - -
3 Furniture and Fixture 1,172,853.67 - - - 1,172,853.67
800,000.00 480,000.00 320,000.00
Curriculum Program
4
Development
5 Training Program Development - - - -
3,083,537.55 - - 1,850,122.53 1,233,415.02
Development of technology
6
and information system
426,666.67 - - - -
Operational for Project
7
Implementing Unit (PIU)
8 DED Consultant 777,415.95 - 710,621.41 - 66,794.54
9 PMS Consultant 691,036.40 - 210,554.49 410,297.08 70,184.83
10 Start Up 43,189.77 43,189.77 - - -
TOTAL 6,994,700.00 43,189.77 921,175.9 2,740,419.61 2,863,248.06
ROUNDED DOWN / UP 6,994,700.00
35
PROJECT IMPLEMENTATION SCHEDULE
NO ACTIVITIES PERIOD
1 Appraisal October 2017
2 Date of BED Approval November 2017
3 Draft of Agreement sent to GOI Novemver 2017
4 GOI Comments sent to ADB December 2017 – January 2018
about the project
2020
21 Bidding process for Equipment February - March 2020
22 Equipment Delivery and installation March – July 2020
23 Test and Commissioning August – October 2020
24 Training and Curriculum Development September - December 2020
25 Project Completion Report March 2021
37
ORGANIZATION: PROJECT IMPLEMENTATION UNIT
UNIVERSITAS
UniversitasPENDIDIKAN
Pendidikan indonesia
INDONESIA(UPI)
(UPI)
As Implementing Agency
Contractor Supplier
F Sumedang Campus
1 Elementary School Teacher Education – S2 1
2 Medical Laboratory Technology Education – S1 1
3 Pharmaceutical Education – S1 1
40
NEW STUDY PROGRAM DEVELOPMENT PLAN
NO STUDY PROGRAMS 2020 2025 2030 2035 2040
G Purwakarta Campus
1 Information System and Technology Education – S1 1
2 Artificial Intelligence and Robotics Education – S1 1
3 Industrial Instrumentation Engineering Education – S1 1
4 Renewable Energy Engineering Education – S1 1
5 Chemistry Engineering Education – S1 1
6 Automotive Engineering Education – S1 1
H Tasikmalaya Campus
1 Creative Design Product Education –S1 1
2 Entrepreneurship Education – S1 1
3 Business and Marketing Education – S1 1
I Serang Campus
1 Maritime Education – S1 1
2 Industrial Engineering Education – S1 1
41
NEW STUDY PROGRAM DEVELOPMENT PLAN
4 Accounting - S3 1
5 Architecture – S2 1
6 Architecture – S3 2
42
CONCLUSION
43
THANK
YOU
44
THE EXISTING ACADEMIC CONDITION
1 A 9 13 36 58 42%
2 B 5 16 30 4 3 58 42%
3 C 7 4 9 2 22 16%
Total Number of
Accredited 21 39 75 6 3 138
Programs
46
THE EXISTING ACADEMIC CONDITION
THE EXISTING LECTURER
283 of the academic staff are still continuing their studies for doctorates in local and
international universities.
47
THE EXISTING ACADEMIC CONDITION
THE EXISTING STUDENT BODY
Source: Academic Information System , 04-01-2016 13:39
NO FACULTY/CAMPUS TOTAL
M F M+F
1 Faculty of Educational Science 991 2882 3873
2 Faculty of Social Science Education 1801 2440 4241
3 Faculty of Language and Literature Education 1116 2407 3523
4 Faculty of Mathematics and Science Education 1263 2230 3493
5 Faculty of Technology and Vocational Education 2127 1512 3639
6 Faculty of Sports and Health Science Education 2088 661 2749
7 Faculty of Economics and Business Education 1076 1853 2929
8 Faculty of Arts and Design Education 723 778 1501
9 Cibiru Campus 194 1057 1251
10 Sumedang Campus 495 573 1068
11 Purwakarta Campus 167 786 953
12 Tasikmalaya Campus 218 883 1101
13 Serang Campus 164 966 1130
14 School of Postgraduate Studies 2202 2335 4537
SUB TOTAL 14625 21363 35988
Teacher Profession Education 125 139 264
16 S1 (the second) 33 147 180
17 Additional Competence
TOTAL 14783 21649 36432 48
THE EXISTING ACADEMIC CONDITION
TOP TEN NATIONAL UNIVERSITIES
(BASED ON NUMBER OF APPLICANTS) AT SNMPTN 2016/2017
Existing
49
THE OUTCOMES OF THE ADB FUNDING (2004-2008)
JUSTIFICATION OF PROJECT
50
THE IMPACTS OF THE IDB FUNDING (2004-2008)
51
THE IMPACTS OF THE IDB FUNDING (2004-2008)
53
DIRECTIONS AND PRIORITIES OF UPI DEVELOPMENT
54
IMPROVING TOTAL STUDENT ENROLLMENTS PLAN
55
IMPROVING TOTAL STUDENT ENROLLMENTS PLAN
57
PERFORMANCE INDICATORS
INPUTS OUTPUTS
OBJECTIVES (resources provided (Goods and services produces by this OUTCOMES AND IMPACTS
for project activities) project)
Providing modern, 5. Landscape Availability of infrastructure, buildings, and landscaping
representative, and high- the campus representative, safe, comfortable,
ABOUT THE PROJECT
58
PERFORMANCE INDICATORS
INPUTS OUTPUTS
OBJECTIVES OUTCOMES AND IMPACTS
(resources provided for project activities) (Goods and services produces by this project)
Creating a comprehensive GOI Financing USD 800,000.00 Curriculum workshop in university level • Standardization of learning
curriculum in undergraduate (three times) outcomes accordance with the
education, teacher profession Construct a new curriculum including to University TPK meeting with TPK in Indonesian National
ABOUT THE PROJECT
education, and other revise exsisting curriculum. faculties, SPs and regional campuses Qualifications Framework
disciplines of both under and Meeting of TPK Faculties/SPs/Regional (KKNI) and international
postgraduate program at UPI Campus with TPK and Head of Study standards
integrated multi campus. Program/department • Enhancement of BAN PT
Workshop of development of syllabus, SAP accreditation
learning material in department/study • Quality Enhancement process
program (three times) and learning result.
Result Review of curriculum at faculty and • Capacity and Ability
university level enhancement in order to
Socialization of curriculum development response science and
technology development
Develop documents and materials for A curriculum document: • Enhancement of graduates
teaching-learning processes Syllabi, lesson plan or course plans, and quality
teaching-learning materials
59
PERFORMANCE INDICATORS
OUTPUTS
INPUTS
OBJECTIVES (Goods and services produces by OUTCOMES AND IMPACTS
(resources provided for project activities)
this project)
Integration of multi- GOI Financing Data center Improving the quality of education,
campus technology and USD 3,083,537.55 Server storage research, and community
ABOUT THE PROJECT
60
PERFORMANCE INDICATORS
INPUTS OUTPUTS
OBJECTIVES (resources provided for project (Goods and services OUTCOMES AND IMPACTS
activities) produces by this project)
Provision of Equipment of each faculty Equipment availability, to improve
ABOUT THE PROJECT
61
QUALITY IMPROVEMENT TARGET BEFORE 2016 -AFTER ADB DEVELOPMENT 2025
63
UPI MAIN CAMPUS BUMI SILIWANGI
LOCATION
64
UPI MAIN CAMPUS BUMI SILIWANGI
LOCATION
39.14 Ha
65
EXISTING Of THE MAIN CAMPUS
LOCATION
66
MAIN CAMPUS
Existing site
67
Development Plan by ADB Funding
3
MASTERPLAN
2/13/2017 68
MAIN CAMPUS : INTEGRATED CLASSROOM AND LABORATORY
LOCATION
2/13/2017 69
MAIN CAMPUS : INTEGRATED CLASS AND LABORATORY
BUILDINGS DESIGN
70
MAIN CAMPUS : INTEGRATED CLASS AND LABORATORY
BUILDINGS DESIGN
2/13/2017 71
MAIN CAMPUS : INTEGRATED CLASS AND LABORATORY
BUILDINGS DESIGN
2/13/2017 72
MAIN CAMPUS : INTEGRATED CLASS AND LABORATORY
ANIMASI
2/13/2017 73
MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
3
LOCATION
2/13/2017 74
MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
LOCATION
2/13/2017 75
MAIN CAMPUS : FACULTY OF ECONOMIC AND BUSSINESS EDUCATION
BUILDINGS DESIGN
76
MAIN CAMPUS : FACULTY OF ECONOMIC AND BUSSINESS EDUCATION
BUILDINGS DESIGN
77
MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
BUILDINGS DESIGN
2/13/2017 78
MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
BUILDINGS DESIGN
2/13/2017 79
BUILDINGS DESIGN MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
BUILDINGS DESIGN MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
BUILDINGS DESIGN MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
BUILDINGS DESIGN MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
MAIN CAMPUS : FACULTY OF ECONOMICS AND BUSINESS EDUCATION
ANIMASI
2/13/2017 84
MAIN CAMPUS : CAMPUS MANAGEMENT CENTER
LOCATION
85
MAIN CAMPUS : CAMPUS MANAGEMENT CENTER
LOCATION
2/13/2017 86
BUILDINGS DESIGN MAIN CAMPUS : CAMPUS MANAGEMENT CENTER
87
BUILDINGS DESIGN MAIN CAMPUS : CAMPUS MANAGEMENT CENTER
2/13/2017 88
BUILDINGS DESIGN MAIN CAMPUS : CAMPUS MANAGEMENT CENTER
2/13/2017 89
ANIMASI MAIN CAMPUS : CAMPUS MANAGEMENT CENTER
2/13/2017 90
MAIN CAMPUS : CAMPUS MANAGEMENT CENTER
BUILDINGS DESIGN
91
REGIONAL CAMPUS AT CIBIRU
LOCATION
92
REGIONAL CAMPUS AT CIBIRU
LOCATION
Area:6.5Ha
93
REGIONAL CAMPUS AT CIBIRU
MASTERPLAN
2/13/2017 94
REGIONAL CAMPUS AT CIBIRU
BUILDINGS DESIGN
2/13/2017 95
REGIONAL CAMPUS AT CIBIRU
BUILDINGS DESIGN
2/13/2017 96
REGIONAL CAMPUS AT CIBIRU
BUILDINGS DESIGN
2/13/2017 97
REGIONAL CAMPUS AT CIBIRU
ANIMASI
2/13/2017 98
REGIONAL CAMPUS AT PURWAKARTA
LOCATION
99
REGIONAL CAMPUS AT PURWAKARTA
LOCATION
Area:3.32 Ha
100
REGIONAL CAMPUS AT PURWAKARTA
LOCATION
2/13/2017 101
REGIONAL CAMPUS AT PURWAKARTA
BUILDINGS DESIGN
2/13/2017 102
REGIONAL CAMPUS AT PURWAKARTA
BUILDINGS DESIGN
2/13/2017 103
REGIONAL CAMPUS AT PURWAKARTA
animasi
2/13/2017 104
REGIONAL CAMPUS AT SERANG BANTEN PROVINCE
LOCATION
105
REGIONAL CAMPUS AT SERANG BANTEN PROVINCE
LOCATION
106
REGIONAL CAMPUS AT SERANG BANTEN PROVINCE
LOCATION
2/13/2017 107
REGIONAL CAMPUS AT SERANG BANTEN PROVINCE
BUILDINGS DESIGN
2/13/2017 108
REGIONAL CAMPUS AT SERANG BANTEN PROVINCE
BUILDINGS DESIGN
2/13/2017 109
REGIONAL CAMPUS AT SERANG BANTEN PROVINCE
animasi
2/13/2017 110
REGIONAL CAMPUS AT SUMEDANG
LOCATION
111
REGIONAL CAMPUS AT SUMEDANG
LOCATION
112
REGIONAL CAMPUS AT SUMEDANG
LOCATION
2/13/2017 113
REGIONAL CAMPUS AT SUMEDANG
BUILDINGS DESIGN
2/13/2017 114
REGIONAL CAMPUS AT SUMEDANG
BUILDINGS DESIGN
2/13/2017 115
REGIONAL CAMPUS AT SUMEDANG
BUILDINGS DESIGN
2/13/2017 116
REGIONAL CAMPUS AT SUMEDANG
animasi
2/13/2017 117
REGIONAL CAMPUS AT TASIKMALAYA
LOCATION
118
REGIONAL CAMPUS AT TASIKMALAYA
LOCATION
Area:3.32 Ha
119
REGIONAL CAMPUS AT TASIKMALAYA
LOCATION
2/13/2017 120
REGIONAL CAMPUS AT TASIKMALAYA
BUILDINGS DESIGN
2/13/2017 121
REGIONAL CAMPUS AT TASIKMALAYA
BUILDINGS DESIGN
2/13/2017 122
REGIONAL CAMPUS AT TASIKMALAYA
BUILDINGS DESIGN
2/13/2017 123
REGIONAL CAMPUS AT TASIKMALAYA
animasi
2/13/2017 124
CONSTRUCTION WORKS
RECAPITULATION
COST ESTIMATION FOR CONSTRUCTION WORKS
COST ESTIMATION DETAIL
125
EQUIPMENT
RECAPITULATION
COST ESTIMATION DETAIL
126
FURNITURE AND FIXTURE
127
Curriculum development
129
Development of technology and information system
TOTAL 41,627,756,916.00
(US$ 3,083,537.55)
130
OPERATIONAL OF PMU
I. Personil
3,767,832,000.00 279,099.00
II. Non Personil
1,992,168,000.00 147,568.00
131