Background
With rapid growth of PS services, operators focus on user experience in PS
services. PS services have some characteristics, such as complexity (the longest
service chain) and diversity (the most complex sub-services). Therefore, problems
cannot be quickly isolated, located, and optimized by using traditional single-NE
analysis methods.
This document is prepared by the Wireless Network Inventory Solutions Group and
Packet Core Network Architecture & Design Dept, WN department.
Parameter configuration
Accurate problem location
1 Working Principles
3 Cases
4 Related Tools
Legend
START
SGSN Data
Huawei
Operator
Collection
Huawei &
Evaluation and optimization steps: Operator
002 NOC
SGSN Data
Step 1: Collect SGSN data; Analysis
Step 2: Analyze the SGSN performance data. Use the MPA tool to Doc-In-001
003
KPI
generate KPI Assessment Report; Evaluation?
No
Step 3: View KPI Assessment Report to check whether KPI reaches the 004
Step 4: Perform fault isolation according to the percentage of each failure 006
cause; BSC Data
Collection
Yes
Step 5: Analyze non-wireless network problems according to the CHR 005 007
logs collected from the CN; Analysis and Wireless Problem
Optimization of Analysis
CN Causes Optimization
Step 6: For the failure causes due to wireless side, collect TOP BSC
data; Doc-Out-001
Step 7: Analyze wireless network using data in the OMStar evaluation END
reports.
HUAWEI TECHNOLOGIES CO., LTD. 华为保密信息,未经授权禁止扩散 Page 10
Attach Failure Reason Location
Failure Category Cause Suggestion
Illegal MS User subscription Check the user subscription data
GPRS not allowed in PLMN Data configuration
LA not allowed Data configuration
No suitable cells in LA Data configuration
Check the configuration strategy
Roaming not allowed in LA Data configuration
Illegal ME Data configuration
GPRS service not allowed Data configuration
Analyze wireless network
Protocol error Wireless cause
problems
Gr fail Link fault Check the link load and status
Ge fail Link fault Check the link load and status
Gr fail HLR or Gr link fault Check the link load and status
1 Working Principles
3 Cases
4 Related Tools
Russia MTS Problem Background
Background
Russia‘s MTS project is the relocation project of Huawei relocation of Nokia Siemens
Networks, network KPIs can not meet customer requirements, impact of customer
acceptance. The SGSN as follows: VLD, IRK, SKH.
1.40% 95.00%
1.20% 94.00%
Uplink Downlink
1.00%
0.80%
BCCH Utilization The HQI is normal due to low
0.60% TCH Utilization
0.40%
traffic, as traffic increase, the
0.20% interference problem will be
0.00%
29 35 41 47 53 59 65 588 594 600 606 612 618 624 630 636 642 648 654 more serious.
1 Working Principles
3 Cases
4 Related Tools
OMStar
Development
GSM Module UTMS Module
Platform
OMStar Platform
For details about how to obtain SOP documents and tools, see the Overview of Supporting
Documents&Tools for Wireless Maintenance. In this document, the NIC and OMStar
versions corresponding to different BSC versions and their download paths are listed:
http://support.huawei.com/support/pages/news/NewsInfoAction.do?doc_id=IN0000036873&
colID=ROOTENWEB|CO0000002672&actionFlag=view
Notes: OMSTAR tools release new version every two months, you can get the latest version from SUPPORT website
before use!